5 floors · 9,635 sq ft · built 1909 · class HR · owner of record: Royal Orleans Hotel Ny Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 7, 2026 | Construction CLASS - 2 OBSERVED ON THE 5TH AND 2ND FLOORS BATHROOM DOORS HITTING SINKS. ON THE 2ND FLOOR, BATHROOM SINK WASTE LINE IMPROPERLY INSTALLED. IN THE BASEMENT THE MOP SINK IS INSTALLED WITH PVC PIPING. THROUGHOUT THE BUILDI #39172820J | Aug 6, 2026 IN VIOLATION | $0 |
| Jan 7, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATION NUMBER 039145184Y/ FILE A CERTIFICATE OF CORRECTION #39172731H | Mar 18, 2027 PENDING | $0 |
| Apr 17, 2025 | Boilers CLASS - 2 AS PER ONE GAS FIREDWEIL MCLAIN 780 BOILER,PERMIT #122585489 BOILERIS NOT REGISTERED AS PER D.O.B. RECORDS. REGISTER BOILER AND CALL FOR FIRST TEST BOILER INSPECTION. #39145184Y | Aug 17, 2026 IN VIOLATION | $0 |
| Feb 11, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39110733H ISSUED ON 04/04/2024, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37033361R | Aug 7, 2025 IN VIOLATION | $0 |
| Apr 4, 2024 | Boilers CLASS - 2 AS PER ONE GAS FIRED WEIL MCLAIN, 780 BOILER. PERMIT NO. 122585489; BOILER IS NOT REGISTERED AS PER DOB RECORDS. REGISTER BOILER AND CALL FOR AN INSPECTION. #39110733H | Jun 13, 2024 STIPULATION/IN-VIO | $0 |
| Dec 28, 2022 | Boilers CLASS - 2 AS PER ONE GAS FIRED WEIL MCLAIN, 780 HOT WATER HEATING BOILER. PERMIT NO. 122585489; BOILER NOT REGISTERED AS PER DOB RECORDS. REGISTER BOILER AND CALL FOR AN INSPECTION. #39076457Y | Apr 6, 2023 IN VIOLATION | $0 |
| Jan 7, 2021 | Boilers CLASS - 2 AS PER ONE WEIL MCLAIN 780 IN CELLAR ON BUILDING. BOILER NOT REGISTERED. #39034503K | Jul 1, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 31, 2019 | CONSTRUCTION #CN1001FK | DOB VIOLATION - ACTIVE |
| May 5, 2008 | CONSTRUCTION #MTF03EM | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| May 5, 2008 | CONSTRUCTION #MTF04EM | DOB VIOLATION - ACTIVE |
| May 5, 2008 | CONSTRUCTION #ZMTF01EM | DOB VIOLATION - ACTIVE |
| Jan 17, 2008 | ZONING #MTF03EM | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 4:48 PM ET. BBL 1017240021.