6 floors · 39 apartments · 60,626 sq ft · built 2005 · class RM · owner of record: 630 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 60,626 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1131). Agency page | Dec 31, 2031 in 1892 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 29, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION I OBSERVED, SIDEWALK SHED ON EXPOSURE #1 AND #2 WITH ACTIVE SIDEWALK SHED PERMIT B01435708, WHICH EXPIRES 11/03/2026. NO CONSTRUCTION ACTIVITY. THE SIDEWALK SHED PARAPET AT EXPOSURE #39559926Y | Dec 9, 2026 PENDING | $2,400 |
| Sep 29, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION I OBSERVED, SIDEWALK SHED ON EXPOSURE #1 AND #2 WITH ACTIVE SIDEWALK SHED PERMIT B01435708, WHICH EXPIRES 11/03/2026. MISSING PROJECT INFORMATION PANEL ON EXPOSURE #1 CONTRARY TO BC #39559932K | Dec 9, 2026 PENDING | $1,250 |
| Sep 11, 2026 | Construction CLASS - 2 I OBSERVED 3 LOCATION AT EXPOSURE 4 AND 1 WHERE THE PARAPET WALL IS NOT ATTACHED PROPERLY NOT IN CODE COMPLIANCE. PEDESTRIAN PROTECTION DOESNOT MEET CODE SPECIFICATIONS(BC 3307.1). REMEDY: COMPLY TO CODE SPECIF #35731079Z | Nov 18, 2026 PENDING | $2,400 |
| Apr 30, 2025 | Construction CLASS - 2 AT THE TIME OF INSPECTION NO CONSTRUCTION ACTIVITIES, I OBSERVED SIDEWALK INSTALLED NOT CODE COMPLIANT. THERE ARE APPROXIMATELY 6 OR MORE PARAPET PANELS DAMAGE AND LOOSE AT EXPOSURE#1 AND 2 THAT CAN POSSIBLY DI #39539666Z | Aug 20, 2025 IN VIOLATION | $2,400 |
| Issued | Violation | Status |
|---|---|---|
| Sep 11, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV:CRACKS IN BRICK JOIN T ABOVE 4TH FLOOR DOOR ON THE NORTHEAST END OF ELEVATION.EXP3 WESTELE V:VERTICAL CRACK IN MORTAR JOINT AT PARAPET ON SOUTHWEST END OF ELEVAT ION.ROOF:SEVERAL #SR0801RF | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #10134 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #10135 | DOB VIOLATION - ACTIVE |
| Aug 15, 2012 | ELEVATOR #ACC200186 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Aug 15, 2012 | Elevators E | Active |
| Aug 15, 2012 | Elevators E | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 9, 2012 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS | Sep 13, 2012 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 29, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION I OBSERVED, SIDEWALK SHED ON EXPOSURE #1 AND #2 WITH ACTIVE SIDEWALK SHED PERMIT B01435708, WHICH EXPIRES 11/03/2026. NO CONSTRUCTION ACTIVITY. THE SIDEWALK SHED PARAPET AT EXPOSURE | Open |
| Sep 29, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION I OBSERVED, SIDEWALK SHED ON EXPOSURE #1 AND #2 WITH ACTIVE SIDEWALK SHED PERMIT B01435708, WHICH EXPIRES 11/03/2026. MISSING PROJECT INFORMATION PANEL ON EXPOSURE #1 CONTRARY TO BC | Open |
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
| Sep 11, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV:CRACKS IN BRICK JOIN T ABOVE 4TH FLOOR DOOR ON THE NORTHEAST END OF ELEVATION.EXP3 WESTELE V:VERTICAL CRACK IN MORTAR JOINT AT PARAPET ON SOUTHWEST END OF ELEVAT ION.ROOF:SEVERAL | Open |
| Sep 11, 2026 | ECB | Construction: I OBSERVED 3 LOCATION AT EXPOSURE 4 AND 1 WHERE THE PARAPET WALL IS NOT ATTACHED PROPERLY NOT IN CODE COMPLIANCE. PEDESTRIAN PROTECTION DOESNOT MEET CODE SPECIFICATIONS(BC 3307.1). REMEDY: COMPLY TO CODE SPECIF | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 9:31 PM ET. BBL 3011317501.