5 floors · 7 apartments · 34,380 sq ft · built 1900 · class D2 · owner of record: Victoria House Ltd
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,380 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 30, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S) AND APPURTENANCES. AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL MASONRY BRICK CHIMNEY IN DISREPAIR WHERE A SECTION MIDWAY CONCRETE STUCCO HAS DETERIORATED EXPOSING MASONRY B #39061368K | Mar 20, 2023 IN VIOLATION | $1,250 |
| Dec 27, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35447959Y ISSUED ON 10/04/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMIT #35566464Z | Feb 25, 2027 PENDING | $6,250 |
| Dec 27, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35454805L ISSUED ON 10/04/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR:FAILURE TO PROVIDE NUMB #35566465K | Feb 25, 2027 | $1,250 |
| Oct 20, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35454805L ISSUED10/4/19 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.FOR FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER FAILURE TO PROVIDE #S OF #35564406L | Feb 25, 2027 | $3,125 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35454806N ISSUED 9/17/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUILDING IN C #35536404J | Feb 25, 2027 | $1,280 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35454804J ISSUED ON 10/04/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.OCCUPANCY CONTRARY TO THAT AL #35536405L | Feb 25, 2027 PENDING | $1,250 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35452512Z ISSUED ON 9/10/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.OCCUPANCY CONTRARY TO THAT ALL #35536407P | Feb 25, 2027 PENDING | $1,250 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35452510P ISSUED ON 9/17/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.OCCUPANCY CONTRARY TO THAT ALL #35536406N | Feb 25, 2027 PENDING | $1,250 |
| Jul 20, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454804J ISSUED ON 10/4/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR OCCUPANCY CONTRARY #35534281J | Feb 25, 2027 PENDING | $1,280 |
| Jul 20, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35452510P ISSUED ON 9/17/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR OCCUPANCY CONTRARY #35534279K | Feb 25, 2027 PENDING | $1,280 |
| Jul 20, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454806N ISSUED ON 09/17/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MAN #35534280H | Feb 25, 2027 | $1,280 |
| Jun 1, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454805L ISSUED ON 10/4/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR FAILURE TO MAINTAIN #35531809P | Feb 25, 2027 | $1,280 |
| Jun 1, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35454806N ISSUED ON 09/17/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUILD #35531808N | Feb 25, 2027 | $1,280 |
| Jun 1, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454804J ISSUED ON ON 10/4/2019 AND TO FILE A CERTIFICATE OFCORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR OCCUPANCY CONTRAR #35531810M | Feb 25, 2027 PENDING | $1,280 |
| Jun 1, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35452510P ISSUED ON 9/17/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR OCCUPANCY CONTRARY #35531807L | Feb 25, 2027 PENDING | $1,280 |
| May 24, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35447759Y ISSUED ON 10/4/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT A #35531774Y | Jan 12, 2022 DEFAULT | $12,500 |
| May 8, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35452512Z ISSUED ON 09/10/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.FOR ILLEGAL OCCUPANCY ON THE 2 #35530318X | Feb 25, 2027 | $1,280 |
| May 8, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35454803H ISSUED ON 10/04/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT.NOTED:AT 5 #35530317Y | Feb 25, 2027 PENDING | $6,280 |
| Mar 31, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35454803H ISSUED ON 10/04/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT AT 5TH FL #35528494M | Feb 25, 2027 PENDING | $6,280 |
| Mar 31, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35452511R ISSUED ON 9/10/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT AT 2ND FLOO #35528493K | Feb 25, 2027 PENDING | $6,280 |
| Mar 31, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35447759Y ISSUED ON 10/04/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT ON THE 2ND #35528491R | Feb 25, 2027 PENDING | $6,280 |
| Mar 31, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35434237Y ISSUED ON 9/17/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT FOR VARIOUS #35528492Z | Feb 25, 2027 PENDING | $6,280 |
| Mar 10, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #35452512Z ISSUED ON 09-10-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.OCCUPANCY CONTRARY TO T #35527496L | Oct 14, 2021 IN VIOLATION | $3,125 |
| Mar 10, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #35454803H ISSUED ON 10-04-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT 1 #35527497N | Oct 14, 2021 IN VIOLATION | $6,250 |
| Feb 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454804J ISSUED ON 10/4/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.OCCUPANCY CONTRARY TO T #35526544M | Feb 25, 2027 | $3,125 |
| Feb 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454805L ISSUED ON 10/4/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUI #35526542Z | Feb 25, 2027 | $3,125 |
| Feb 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454806N ISSUED ON 9/17/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUI #35526543K | Feb 25, 2027 | $3,125 |
| Feb 3, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35452510P ISSUED ON 9/17/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.OCCUPANCY CONTRARY TO T #35526545Y | Feb 25, 2027 | $3,125 |
| Jan 27, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35454863H ISSUED ON 10/04/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT.REMEDY:COM #35526470Z | Feb 25, 2027 PENDING | $6,280 |
| Jan 27, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35447759Y ISSUED ON 10/04/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT.REMEDY:COM #35526468J | Feb 25, 2027 PENDING | $2,530 |
| Jan 27, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35425251R ISSUED ON 09/10/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT.REMEDY:COM #35526467H | Feb 25, 2027 PENDING | $6,280 |
| Jan 27, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35434237Y ISSUED ON 09/17/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT.REMEDY:COMP #35526469L | Feb 25, 2027 PENDING | $6,280 |
| Nov 18, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454805L ISSUED ON 10/4/19 & TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1&1RCNY102-01.FOR FAILURE TO PROVIDE REQUIRED MEANS OF #35523799K | Feb 25, 2027 | $1,280 |
| Nov 18, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #35452510P ISSUED ON 09-17-19 AND TO FILE A CERTIFICIATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 FOR ILLEGAL OCCUPANCY #35523797R | Feb 25, 2027 | $1,280 |
| Nov 18, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #35454804J ISSUED ON 10-04-19 AND TO FILE A CERTIFICIATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 FOR ILLEGAL OCCUPANCY #35523798Z | Feb 25, 2027 | $1,280 |
| Nov 18, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #35454803H ISSUED ON 10-04-19 AND TO FILE A CERTIFICIATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 WORK WITHOUT A PERMIT #35523796P | Feb 25, 2027 PENDING | $6,280 |
| Sep 17, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454805L ISSUED ON 10/04/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519812Y | Feb 25, 2027 | $1,280 |
| Sep 17, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35434237Y ISSUED ON 09/17/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519807J | Feb 25, 2027 PENDING | $6,250 |
| Sep 17, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#354252511RISSUED ON 09/10/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519806H | Feb 25, 2027 PENDING | $6,250 |
| Sep 17, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35447759Y ISSUED ON 10/04/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519805X | Feb 25, 2027 PENDING | $6,250 |
| Sep 17, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454803H ISSUED ON 10/04/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519808L | Feb 25, 2027 PENDING | $6,250 |
| Sep 17, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454806N ISSUED ON 09/17/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519811M | Feb 25, 2027 | $6,250 |
| Sep 17, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35452512Z ISSUED ON 09/10/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519809N | Feb 25, 2027 | $6,250 |
| Sep 17, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454804J ISSUED ON 10/04/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519813X | Feb 25, 2027 | $1,280 |
| Sep 17, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35452510P ISSUED ON 09/17/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35519810K | Feb 25, 2027 | $6,250 |
| Mar 25, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35447759Y ISSUED ON 10/04/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT OB #35519075N | Feb 25, 2027 PENDING | $2,500 |
| Mar 19, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35452512Z ISSUED ON 09/10/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI #35518706X | Feb 25, 2027 PENDING | $1,280 |
| Mar 19, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35434237Y ISSUED ON 09/17/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI #35518705Y | Feb 25, 2027 PENDING | $2,530 |
| Mar 19, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35452510P ISSUED ON 09/17/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI #35518708J | Feb 25, 2027 PENDING | $1,280 |
| Mar 19, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35452511R ISSUED ON 09/10/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI #35518707H | Feb 25, 2027 PENDING | $2,530 |
| Mar 10, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35454804J ISSUED ON 10-04-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSION #35518163Z | Feb 25, 2027 PENDING | $6,250 |
| Mar 10, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35454805L ISSUED ON 10-04-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSION #35518160N | Feb 25, 2027 | $6,250 |
| Mar 10, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35454803H ISSUED ON 10-04-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSION #35518162R | Feb 25, 2027 PENDING | $12,500 |
| Feb 18, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454806N ISSUED ON 9/17/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.B189:FAILURE TO MAINTAIN #35517032Y | Feb 25, 2027 | $1,250 |
| Jan 9, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35452512Z ISSUED ON 09-10-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR ILLEGAL OCCUPANCY ON THE 4TH FL APT#4B. REMEDY: COMPLY W/CO #35515115K | Feb 25, 2027 PENDING | $1,250 |
| Jan 9, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35452510P ISSUED ON 09-10-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR ILLEGAL OCCUPANCY ON THE 4TH FL REAR APT#4D. REMEDY: COMPLY #35515114Z | Feb 25, 2027 PENDING | $1,250 |
| Dec 12, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454806N ISSUED ON 09-17-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR NOT HAVING THE REQUIRED MEANS OF EGRESS FOR APT#4D. #35513570N | Feb 25, 2027 | $1,250 |
| Dec 5, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35454804J ISSUED ON 10/04/19 AND TO FILE FOR A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.B103:OCCUPANCY CONT #35513373Y | Feb 25, 2027 PENDING | $0 |
| Oct 4, 2019 | Construction CLASS - 1 WORK WITHOUT A PERMIT.OBSERVED ON THE THIRD AND SECOND FLOORS HANGING COMMERCIAL UNIT SPACE HEATERS INSTALLED W/ UNAUTHORIZED GAS PIPING WITHOUT A PERMIT.D.O.B.RECORDS DO NOT SHOWW ANY PERMITS BEING ISSUED FOR #35447759Y | Oct 14, 2021 IN VIOLATION | $2,500 |
| Oct 4, 2019 | Plumbing CLASS - 1 FAILURE TO HAVE A NEWOR ALTERED PLUMBING SYSTEM TESTED.OBSERVED ON THETHIRD AND SECOND FLOORS COMMERCIAL HANGING SPACE UNIT HEATER INSTALLEDWITH UNAUTHORIZED GAS PIPING D.O.B. RECORDS DO NOT SHOW TEST HAVING BE #35447761N | Oct 14, 2021 IN VIOLATION | $2,500 |
Showing 60 of 86. Full list on the agency site.
| Issued | Violation | Status |
|---|---|---|
| Apr 21, 2026 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B00381582-I1 ON 11/19/25, DUE TO CONTRACTOR WITHDRAWAL. #26-01095 | DOB VIOLATION - ACTIVE |
| Aug 19, 2025 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #321596554 ON 8/18/25 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL. #25-01976 | DOB VIOLATION - ACTIVE |
| Feb 27, 2025 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK UNDER APPLICATION #321596554 STOPPED ON 02/26/25 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL. #25-00337 | DOB VIOLATION - ACTIVE |
| Oct 28, 2024 | CONSTRUCTION AT TIME OF INSPECTION, OBSERVED VACATE STICKER THAT WAS POSTED ON THE DOOR OF 35 BROADWAY HAS BEEN REMOVED. #24-02836 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2102408 | DOB VIOLATION - ACTIVE |
| Nov 1, 2021 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321596554 DUE TO THE INTENT TO REVOKE APPROVAL AND PERMIT(S). #21-01418 | DOB VIOLATION - ACTIVE |
| Nov 1, 2021 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321596554 DUE TO THE INTENT TO REVOKE APPROVAL AND PERMIT(S). #21-01419 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #09907 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #11476 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #02995 | DOB VIOLATION - ACTIVE |
| Mar 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST #07926 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jun 1, 2016 | Elevators EVCAT5 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)