2 floors · 15,385 sq ft · built 1928 · class E1 · owner of record: Doris Hinsch Lezny, Member
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 12, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER.DOB-PARAPET VIO 121825PI40102SB AND DOB-CONTROL 348413 DATED 12/18/2025.NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT.REM:COMPLY WITH THE COMMISSION #35718849J | Jul 13, 2027 DEFAULT | $12,500 |
| Feb 10, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB FTC-VIO #010926PI40107AG, DOB CONTROL #348045 DATED 01/09/2026. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDE #35718863X | Jul 13, 2027 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Jan 9, 2026 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#348412 VIO#121825PI40101SB DATED 12/18/2025 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 12/29/2025 AS OF 01/09/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348412 VIO#121925PI40101SB #PI40107AG | DOB VIOLATION - ACTIVE |
| Dec 18, 2025 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD BRICK MSONRY BULGING/CRACKED NEAR PARAPET OF EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING 2024. SUBMIT ANNUAL PARPAET OBSERVATION REPORT FOR 2024-2026 O BE REC'D BY DOB NO LATER THAN JANUARY 1 2026 #PI40102SB | DOB VIOLATION - ACTIVE |
| Dec 18, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D(7 DAY CAP)OBSVD @ EXP1 BULGING/CRACKED BRICK MASONRY @ PARAPET. @ EXP2 OBSVD SEVERAL HAIR LINE BRICK MASONRY CRACKS @ MULT LOCATIONS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 12/29/25 ADDRESSING ALL DONDITIONS W/ #PI40101SB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 5:43 PM ET. BBL 4006690041.