Queens · Block 1204 · Lot 1 · 11377

35-33 64 Street

5 floors · 181 apartments · 129,900 sq ft · built 1924 · class C1 · owner of record: Cosmopolitan Associates V, Llc

83open violations
$0ECB/OATH penalties owed
16HPD class C (immediately hazardous)
66dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 129,900 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 310 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1162 days
Next cycle year 2029
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1204). Agency page

Dec 31, 2034
in 2988 days
Next due 2034
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-06 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (83) · C 16 · B 31 · A 36
IssuedClassViolationCorrect by
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL, EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE 1st RDec 12, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALLOct 30, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 2nd Oct 30, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SOct 30, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st CLOSET FOct 30, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT AOct 30, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL, WEST WALL, 1st DOOR FROM EAST AT SOUTH WALL, WEST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENTDec 12, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL, CEILING, SOUTH WALL, CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT AOct 30, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FRAME FROM EAST AT SOUTH WALL,Oct 30, 2026
Sep 8, 2026CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THOct 30, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM NORTH AT EAST WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOORDec 12, 2026
Sep 8, 2026AApt 2E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Dec 12, 2026
Sep 8, 2026AApt 2E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL, NORTH WALL, NORTH WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL WALL, EAST WALL, NORTH WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EADec 12, 2026
Jul 10, 2026AApt 5A · § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EASTOct 13, 2026
Jul 10, 2026AApt 5A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EASTOct 13, 2026
Oct 23, 2025AApt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJan 26, 2026
Jan 30, 2025CApt 3F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-G-H''Feb 25, 2025
Jan 30, 2025CApt 3F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-G-H''Feb 25, 2025
Jan 16, 2025C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCK AT BASEMENT AT BOILER ROOMJan 22, 2025
Jul 8, 2024B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF HOUSEHOLD ITEMS AND FLOWER POTS 4TH STORY BALCONY BUILDING FRONT AT FIRE ESCAPEAug 12, 2024
Jul 8, 2024B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF HOUSEHOLD ITEMS AND FLOWER POTS 3RD STORY BALCONY BUILDING FRONT AT FIRE ESCAPEAug 12, 2024
Jul 8, 2024BApt 5J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''J''Aug 12, 2024
Apr 9, 2024BApt 3B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-B'', 2nd FROM EAST AT SOUTH ORIGINAL VIOLATION 16511468 ISSUED 09-DEC-23 HAS BEEN UPGRADEDMay 14, 2024
Dec 11, 2023CApt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A-B'', 2nd FROM EAST AT SOUTHJan 6, 2024
Nov 27, 2023BApt 2F · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-G'', AT NORTHJan 1, 2024
Nov 27, 2023BApt 2F · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE, IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-G'', AT NORTHJan 1, 2024
Nov 27, 2023BApt 2F · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK,ON DOOR TO ROOM LEADING TO FIRE ESCAPE IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-G'', AT NORTHJan 1, 2024
Mar 22, 2023CApt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''G-F'', 1st FROM WEST AT NORTHApr 17, 2023
Nov 12, 2021CApt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING. IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''C-D-E''Nov 18, 2021
Nov 12, 2021CApt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING. IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''C-D-E''Nov 18, 2021
Nov 12, 2021CApt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING. IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''C-D-E''Nov 18, 2021
Sep 13, 2021BApt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTHOct 18, 2021
Sep 13, 2021BApt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTHOct 18, 2021
Aug 12, 2019AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Aug 12, 2019AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Aug 12, 2019AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL, 1st DOOR FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Aug 12, 2019AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Aug 12, 2019AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Aug 12, 2019AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM SOUTH AT WEST WALL WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Aug 12, 2019AApt 2I · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Aug 12, 2019AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT IN THE KITCHEN LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 15, 2019
Jan 28, 2019BApt 3G · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHMar 4, 2019
Jan 17, 2019B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTRUDING BEYOND WINDOW SILL AT 5TH AND 4TH STORY BALCONIES AT NORTH AT FIRE ESCAPEFeb 21, 2019
Sep 20, 2018BApt 2I · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS , IN THE ENTRANCE LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOct 25, 2018
Sep 20, 2018BApt 2I · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WALL IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOct 25, 2018
Sep 20, 2018BApt 2I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL, SOUTH WALL, WEST WALL, CEILING IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOct 25, 2018
Sep 20, 2018AApt 2I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 24, 2018

Showing 60 of 83. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Sep 8, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL, EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE 1st ROpen
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALLOpen
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 2nd Open
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SOpen
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st CLOSET FOpen
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT AOpen
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL, WEST WALL, 1st DOOR FROM EAST AT SOUTH WALL, WEST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENTOpen
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL, CEILING, SOUTH WALL, CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT AOpen
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FRAME FROM EAST AT SOUTH WALL,Open
Sep 8, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THOpen
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM NORTH AT EAST WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOROpen
Sep 8, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''E''Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 9:41 PM ET. BBL 4012040001.

Look up another building