Queens · Block 669 · Lot 13 · 11101

35-25 Steinway Street

1 floors · 18,360 sq ft · built 1928 · class K1 · owner of record: 3525 Steinway Llc

4open violations
$2,530ECB/OATH penalties owed
0HPD class C (immediately hazardous)
791dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 791 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $2,530 owed
IssuedViolationHearingBalance
Jun 26, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB "FTC" CONTROL #348124, DOB "FTC" VIO #012926PI40107SB, DATED 01/29/2026. NO COMPLIANCE ON FILE FOR A CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH COMMISSIONER
#35718616Z
Sep 15, 2026
DEFAULT
$2,530
DOB (2)
IssuedViolationStatus
Jan 29, 2026CONSTRUCTION
FTC W/COMMISSIONER'S ORDER CONTROL#348414 VIO#121825PI40103SB DATED 12/18/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 01/18/2026. AS OF 01/29/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/THE COMMISSIONER'S ORDER CONTROL#348414 AND CAP VIO # 121825PI40103SB
#PI40107SB
DOB VIOLATION - ACTIVE
Dec 18, 2025CONSTRUCTION
CORRECTIVE ACTION PLAN REQ'D(30 DAY CAP)OBSVD @ EXP2 BULGING/CRACKED BRICK MASONRY. @ EXP3 ON 41 ST OBSV A MSONRY CRACK @ PARAPET & A SEVERELY DETERIORATED/SAGGING LINTEL. OWNER TO IMMED RETAIN A REG DESIGN PROF TO EVAL THE ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN BY 01/18/2026 ADDRESSING
#PI40103SB
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 6:45 PM ET. BBL 4006690013.

Look up another building