4 floors · 32 apartments · 29,818 sq ft · built 1928 · class C7 · owner of record: T.A. 72nd Realty, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-09 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 29,818 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 30, 2023 | Construction CLASS - 2 WORK WITHOUT A PERMIT.AT TIME OF INSPECTION OBSERVED A METAL ROLL DOWNGATE INSTALLED AT FRONT OF COMMERCIAL PREMISES ADDRESS 71-18 35 AVE.BELOW OWNING FOR QUAKER FRENCH CLEANERS.ALL NEW GATE INCLUDING SIDE RAIL #35646812X | Nov 22, 2024 IN VIOLATION | $0 |
| Apr 16, 2020 | Unknown CLASS - 2 AT TIME OF INSPECTION,OBSERVED ONGOING CONSTRUCTION ACTIVITIES CONTRARY TO GOVERNOR'S EXECUTIVE ORDER#202.6,202.8,202.11,202.13 AND GUIDANCEPUBLISHED BY THE EMPIRE STATE DEVELOPMENT CORP.PURSUANT TO SAME.(5)IND #35493401R | Jan 5, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00613 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01445 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #15071 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01535 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00650 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #06096 | DOB VIOLATION - ACTIVE |
| Sep 8, 2004 | ELEVATOR #9444/107552 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Active |
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO Violation Issued-Failure To File 2023 Internal High Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 17, 2026 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTUDING BEYOND THE WINDOW SILL AT NORTH STACK NORTH SIDE OF THE BUILDING AT FIRE ESCAPE, 3rd STORY | Sep 21, 2026 |
| Jan 13, 2021 | C | Apt D1 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WINDOW SASH AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT D1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 19, 2021 |
| Mar 30, 2020 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | Jul 3, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Open |
| Aug 17, 2026 | HPD B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTUDING BEYOND THE WINDOW SILL AT NORTH STACK NORTH SIDE OF THE BUILDING AT FIRE ESCAPE, 3rd STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 12:43 PM ET. BBL 4012710006.