Queens · Block 214 · Lot 251 · 11101

35-02 Northern Boulevard

2 floors · 41,500 sq ft · built 1930 · class G9 · owner of record: 3502 Partners Llc

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
182dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 41,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 182 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 182 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 792 days
Next cycle year 2028

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jul 16, 2010Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR ALT II JOB #410101269 OF WHICH PERMIT EXPIRED 4.1.09NON CONFORMING WORK NOTED AGAINST PLAN DATED 4.17.08: 1) FOUND NO AC
#34835029K
Sep 7, 2010
STIPULATION/IN-VIO
$0
Jun 9, 2010Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS INSP DWG 07/01/03 PC ALTII 401690434 EXP 01/07/04 NOTE AT TIME OF INSP FOUND PROPOSED HANDICAP LIFT MAKE PROLIFT VOYAGER MODEL #3
#34849316K
Aug 3, 2010
STIPULATION/IN-VIO
$0
DOB (5)
IssuedViolationStatus
May 6, 2020CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. AT THE TIME OF INSPECTION OBSERVED BUILDING BEARING BRICK WALL AT REAR EXPOSURE #3 IN DISREPAIR, CRACKED, BULGING AND SEPARATING FROM STRUCTURAL COLUMNS. NOTED STRUCTURAL DEFLECTION THROUGHOUT THE ENTIRE WIDTH OF THE COMPROMISED WALL. ALSO CONCRETE FLOOR DROPPING SE
#20-00775
DOB VIOLATION - ACTIVE
May 6, 2020CONSTRUCTION
FTM:BLDG DMG DUE TO CONST @LIRR.OBS APRX 8'DEEP EXP3 WALL HAD CONCRETE SLAB ON GRDE UNDERMIND/CRACK/SLOPE.EXP3 BEAR WAL BOWED OUTWRD AND PART DETCH AT SOG&INTERSECTING MASN WALLS;EXP3 VERT CRACK@EXP2/3 CORNR.EXP3 CRACK&DISLODGED AT SOME JOIST.OWNR RETN NYSPE TO EVAL ENTIRE BLDG&PREP REPR DWGS.BLDG T
#FEU40101PN
DOB VIOLATION - ACTIVE
May 6, 2020CONSTRUCTION
EMG WRK/PARTIAL VACATE ORDR:MULTI COMMERC BUSINESS PART VACAT'D @REAR OF BLDG UNDER C#4810527 DUE TO UNSAFE CONDNS@THE EXP3 BULG/BEAR WALL & UNDRMIND CONC SLAB ON GRADE THAT WAS DMGE BY ADJ CONST.IMMD INSTL PHYS BARRIER 5'TALL MIN@A DIST 25'FRM EXP3 WALL ALNG FULL WIDTH OF BLDG.WRK DIRECT&SUPV PE.FI
#FEU40102PN
DOB VIOLATION - ACTIVE
May 6, 2020CONSTRUCTION
EMGY WRK ORDR:BLDG DMG DUE TO CONSTR@LIRR.SLAB ON GRADE UNDRMIND APRX 8'DEEP ALNG EXP3 WALL &CRACK/SLOPE.EXP3 BEAR WALL BOWED OUTWARDS&PART DETCH FROM SOG.EXP3 CRACK@2/3 CRNR.EXP3 CRACK@JOIST &UNSTABL.OWNR RETN NYSPE&CONTR TO IMMD TEMP SHORE FLR JOIST @EXP3 BEAR WALL.WRK UNDR SUPV DIRECT PE.FILE JOB
#FEU40103PN
DOB VIOLATION - ACTIVE
Oct 8, 2010ELEVATOR ANNUAL INSPECTION / TEST

#04762
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 8, 2010Elevators VCAT1
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 4:32 PM ET. BBL 4002140251.

Look up another building