5 floors · 9 apartments · 9,685 sq ft · built 1909 · class C7 · owner of record: Lenox Twins, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 1, 2026 | B | Apt 5S · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED AND ERODED WINDOW WOOD STOOL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2026 |
| Sep 1, 2026 | A | Apt 5S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 5, 2026 |
| Sep 1, 2026 | B | Apt 5S · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MISSING RADIATOR SHUTOFF VALVE IN THE 4th ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2026 |
| Sep 1, 2026 | A | Apt 5S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 5, 2026 |
| Sep 1, 2026 | B | Apt 5S · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LIFTING VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2026 |
| Sep 1, 2026 | A | Apt 5S · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 5, 2026 |
| Sep 1, 2026 | B | Apt 5S · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED AND MISSING CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2026 |
| Sep 1, 2026 | B | Apt 5S · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQFT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2026 |
| Sep 1, 2026 | B | Apt 5S · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LIFTING VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2026 |
| Aug 11, 2026 | B | Apt 5S · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 15, 2026 |
| Aug 11, 2026 | B | Apt 5S · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OUTER GLASS PANE AT LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 15, 2026 |
| Aug 11, 2026 | B | Apt 5S · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 15, 2026 |
| Apr 30, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Aug 3, 2026 |
| Sep 21, 2023 | B | Apt 2S · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE WALL PANEL IN THE FOYER LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2023 |
| Sep 21, 2023 | B | Apt 2S · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCHUTCHEN PLATE HEAT RISER AT CEILING IN THE KITCHEN LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 26, 2023 |
| Jan 3, 2023 | C | Apt 3N · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 17, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED AND ERODED WINDOW WOOD STOOL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MISSING RADIATOR SHUTOFF VALVE IN THE 4th ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LIFTING VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED AND MISSING CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQFT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LIFTING VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 11, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 11, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OUTER GLASS PANE AT LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 11, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:06 PM ET. BBL 1017250072.