5 floors · 56 apartments · 60,879 sq ft · built 1926 · class C1 · owner of record: 3475-77 Knox Pl Associates,
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 60,879 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3324). Agency page | Dec 31, 2034 in 2991 days | Next due 2034 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 8, 2022 | Boilers CLASS - 2 AS PER ONE ROCKMILLS MP-100 BOILER IN BASEMENT. DAWGS MISSING AT REAR TUBE DOOR-OPENING IN CHIMNEY LEFT UNCAPPED-NO CLEAN-OUT AT CHIMNEY BASE-COMBUSTIBLE MATERIAL AND GARBAGE IN BOILER ROOM-NO BODY DRAIN ON SAF #39063741Z | Jul 29, 2022 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101807 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #03744 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Sep 26, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 29, 2026 | B | Apt 4J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18966012 ISSUED 29-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE | Nov 3, 2026 |
| Sep 18, 2026 | C | Apt 1I · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE THE DOOR IN THE ENTRANCE LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Oct 2, 2026 |
| Sep 18, 2026 | A | Apt 1I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Dec 22, 2026 |
| Sep 18, 2026 | B | Apt 1I · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Oct 23, 2026 |
| Sep 18, 2026 | A | Apt 1I · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WINDOW FRAME ON NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Dec 22, 2026 |
| Aug 13, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 17, 2026 |
| Aug 13, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5th STORY | Nov 16, 2026 |
| Aug 13, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 5th STORY | Sep 17, 2026 |
| Aug 13, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 5th STORY | Sep 17, 2026 |
| Aug 13, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 17, 2026 |
| Aug 13, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 17, 2026 |
| Aug 13, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 17, 2026 |
| Aug 6, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' | Sep 10, 2026 |
| Aug 6, 2026 | C | Apt 5I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Aug 12, 2026 |
| Aug 6, 2026 | A | Apt 5I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Nov 9, 2026 |
| Aug 6, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' | Nov 9, 2026 |
| Aug 6, 2026 | A | Apt 5I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Nov 9, 2026 |
| Aug 6, 2026 | C | Apt 5I · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Aug 12, 2026 |
| Aug 6, 2026 | B | Apt 5I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Sep 10, 2026 |
| Aug 6, 2026 | A | Apt 5I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Nov 9, 2026 |
| Aug 6, 2026 | B | Apt 5I · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Sep 10, 2026 |
| Jul 24, 2026 | C | Apt 5F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR FOR SELF-CLOSING IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Aug 7, 2026 |
| Jul 24, 2026 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Aug 28, 2026 |
| Jul 24, 2026 | B | Apt 5F · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SEC | Aug 28, 2026 |
| Jul 24, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS ASSEMBLIES AT BUILDING ENTRANCE DOOR LEADING FROM VESTIBULE TO PUBLIC HALL AT PUBLIC HALL, 1st STORY | Aug 28, 2026 |
| Jul 24, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR LEADING FROM VESTIBULE AT PUBLIC HALL, 1st STORY | Aug 7, 2026 |
| Jul 24, 2026 | B | Apt 5F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 20SQ FT AT CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Aug 28, 2026 |
| Jul 24, 2026 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Aug 28, 2026 |
| Jul 24, 2026 | B | Apt 5F · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTI | Aug 28, 2026 |
| Jul 10, 2026 | B | Apt 5G · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 14, 2026 |
| Jul 10, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Jul 24, 2026 |
| Jul 10, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 14, 2026 |
| Jul 10, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Aug 14, 2026 |
| Jul 10, 2026 | B | Apt 5G · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 14, 2026 |
| Jul 10, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 14, 2026 |
| Jul 10, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 14, 2026 |
| Jul 10, 2026 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 14, 2026 |
| Jun 25, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ITS ASSEMBLY AT VESTIBULE DOOR , 2nd STORY | Jul 30, 2026 |
| Jun 25, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE DOOR , 2nd STORY | Jul 9, 2026 |
| Jun 3, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE REPAIR LOCK AND ASSEMBLIES FOR BUILDING ENTRANCE DOOR FOR NORTH SECTION , 1st STORY | Jul 8, 2026 |
| Jun 2, 2026 | B | Apt 4J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 7, 2026 |
| Jun 1, 2026 | B | Apt 4J · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 6, 2026 |
| Jun 1, 2026 | B | Apt 4J · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 6, 2026 |
| Jun 1, 2026 | B | Apt 4J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PROCELAIN ENAMEL BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 6, 2026 |
| Apr 30, 2026 | C | Apt 2H · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | May 24, 2026 |
| Apr 29, 2026 | C | Apt 2H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''3477'' | May 5, 2026 |
| Apr 29, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, SECTION ''3477'' | Aug 2, 2026 |
| Apr 29, 2026 | C | Apt 2H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT EAST WALL, EAST WALL, 1st WINDOW FRAME FROM WEST | May 23, 2026 |
| Apr 29, 2026 | C | Apt 2H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME | May 23, 2026 |
| Apr 13, 2026 | B | Apt 3A · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3475'', AT SOUTH | May 18, 2026 |
| Apr 13, 2026 | B | Apt 1D · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''3475'', AT SOUTH | May 18, 2026 |
| Apr 13, 2026 | B | Apt 1D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AROUND BATHTUB AT WEST WALL IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''3475'', AT SOUTH | May 18, 2026 |
| Mar 5, 2026 | B | Apt 2D · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Apr 9, 2026 |
| Mar 5, 2026 | B | Apt 2D · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Apr 9, 2026 |
| Jan 29, 2026 | B | Apt 2D · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SEC | Mar 5, 2026 |
| Jan 29, 2026 | B | Apt 2D · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTI | Mar 5, 2026 |
| Jan 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING VESTIBULE , 2nd STORY, SECTION ''3475'' | Feb 12, 2026 |
| Dec 22, 2025 | B | Apt 1I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AROUND THE RISER IN THE BATHROOM LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Jan 26, 2026 |
| Nov 18, 2025 | B | Apt 4A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS TH 10SQ.FT AT CEILING AND NORRTH WALL IN THE BATHROOM LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 18096966 ISSUED 19-JUL-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE | Dec 23, 2025 |
| Nov 10, 2025 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS [FLOWER POT] AT 5TH STORY BALCONY AT 1ST FIRE ESCAPE FROM EAST AT NORTH EXTERIOR WALL AT FIRE ESCAPE | Dec 15, 2025 |
Showing 60 of 227. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 29, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18966012 ISSUED 29-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE | Open |
| Sep 18, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE THE DOOR IN THE ENTRANCE LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Open |
| Sep 18, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Open |
| Sep 18, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Open |
| Sep 18, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WINDOW FRAME ON NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1I, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''3477'' | Open |
| Aug 13, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 13, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5th STORY | Open |
| Aug 13, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 5th STORY | Open |
| Aug 13, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 5th STORY | Open |
| Aug 13, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 13, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 13, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 6, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Open |
| Aug 6, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Open |
| Jul 24, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR FOR SELF-CLOSING IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Open |
| Jul 24, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Open |
| Jul 24, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SEC | Open |
| Jul 24, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS ASSEMBLIES AT BUILDING ENTRANCE DOOR LEADING FROM VESTIBULE TO PUBLIC HALL AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 7:25 AM ET. BBL 2033240063.