Manhattan · Block 1182 · Lot 7502 · 10023

346 W 71st Street

7 floors · 38 apartments · 59,856 sq ft · built 1920 · class R4 · owner of record: Cydonia W71, Llc

19open violations
$625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 59,856 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $176,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 833 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1146 days
Next cycle year 2029
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1182). Agency page

Dec 31, 2032
in 2242 days
Next due 2032

Open violations

ECB / OATH (1) · $625 owed
IssuedViolationHearingBalance
Nov 9, 2020Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES. NOTE:AT THE TIME OF INSPECTION VIEW AT EXPOSURE 1 NORTH ELEVATION DEFECTED FACADE AT 2 FL CORNICE OVER BLDG ENTRANCE CRACK,SPALLING AND OPEN
#35542214J
Jun 10, 2021
IN VIOLATION
$625
DOB (2)
IssuedViolationStatus
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00017
DOB VIOLATION - ACTIVE
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
#10197
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 22, 2023Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (11) · C 0 · B 9 · A 2
IssuedClassViolationCorrect by
May 19, 2015AApt 2B7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ........WOOD FLOOR IN THE ROOM LOCATED AT B-ROOM 2B7, 2nd STORY, 5th B-ROOM FROM SOUTH AT WESTAug 22, 2015
May 19, 2015AApt 2B7 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ........CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2B7, 2nd STORY, 5th APARTMENT FROM SOUTH AT WESTAug 22, 2015
Aug 1, 2014BApt 6S2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ........CEILING AND ALL WALLS IN THE ROOM LOCATED AT B-ROOM 6S2, 6th STORY, 1st B-ROOM FROM WEST AT NORTHSep 5, 2014
Aug 1, 2014BApt 6S2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ROOM LOCATED AT B-ROOM 6S2, 6th STORY, 1st B-ROOM FROM WEST AT NORTHSep 5, 2014
Aug 1, 2014BApt 6S2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ROOM LOCATED AT B-ROOM 6S2, 6th STORY, 1st B-ROOM FROM WEST AT NORTHSep 5, 2014
Aug 1, 2014BApt 6S2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...WOOD FLOOR IN THE ROOM LOCATED AT B-ROOM 6S2, 6th STORY, 1st B-ROOM FROM WEST AT NORTHSep 5, 2014
Jul 31, 2014B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, IN THE 1st ROOM FROM EAST LOCATED AT SRO, 6th STORY, 1st SINGLE ROOM OCCUPANCY FROM EAST AT SOUTHSep 4, 2014
Jul 31, 2014B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST LOCATED AT SRO, 6th STORY, 1st SINGLE ROOM OCCUPANCY FROM EAST AT SOUTHSep 4, 2014
Jul 29, 2014B§ 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE 1st ROOM FROM EAST LOCATED AT SRO, 6th STORY, 1st SINGLE ROOM OCCUPANCY FROM EAST AT SOUTHSep 2, 2014
Jul 29, 2014B§ 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE 1st ROOM FROM EAST LOCATED AT SRO, 6th STORY, 1st SINGLE ROOM OCCUPANCY FROM EAST AT SOUTHSep 2, 2014
Jul 29, 2014B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE 1st ROOM FROM EAST LOCATED AT SRO, 6th STORY, SINGLE ROOM OCCUPANCY AT SOUTH , SECTION ''350 BLDG''Sep 2, 2014

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 8:27 PM ET. BBL 1011827502.

Look up another building