Bronx · Block 2413 · Lot 1 · 10451

345 East 153 Street

14 floors · 1023 apartments · 983,548 sq ft · built 1952 · class D3 · owner of record: Nyc Housing Authority

49open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 983,548 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2413). Agency page

Dec 31, 2033
in 2604 days
Next due 2033
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-12 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $198,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: UNSAFE (2025-04-29)

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 16, 2022Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCESAT THE TIME OF INSPECTION OBSERVED AT EXPOSURE#1 BY 7 FLOOR AMD 6 FLOOR LEVEL WINDOW GLASS BROKEN.ALSO EXPOSURE#4 3RD FLOOR LEVEL WINDOW GLAS BROKEN
#35647362M
Jun 17, 2022
POP/IN-VIO
$0
Jul 30, 2014Unknown CLASS - 1
LICENSED RIGGER FAILED TO ENSURE SCAFFOLD WORKER NOT MINIMUM REQUIREMENTS.NOTED:THE FOLLOWING WORKERS WERE IN POSSESION OF FRAUDULANT SCAFFOLD TRAINING CERT(1)MANJIT SINGH(2)MANOHAR LAL CERT OF FITNESS ARE VOID
#35099482M
Sep 19, 2014
POP/IN-VIO
$0
DOB (15)
IssuedViolationStatus
May 7, 2025FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
#00030
DOB VIOLATION - ACTIVE
Feb 20, 2025HAZARDOUS CONDITION (FACADE)
NYCHA CYCLE 9C UNSAFE REPORT FILED
#912045
DOB VIOLATION - ACTIVE
Feb 20, 2025HAZARDOUS CONDITION (FACADE)
NYCHA CYCLE 9C UNSAFE REPORT FILED
#912053
DOB VIOLATION - ACTIVE
Feb 20, 2025HAZARDOUS CONDITION (FACADE)
NYCHA CYCLE 9C UNSAFE REPORT FILED
#912049
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00478
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00481
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00483
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00476
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00477
DOB VIOLATION - ACTIVE
Apr 30, 2008CONSTRUCTION

#0110SP
DOB VIOLATION - ACTIVE
Aug 13, 2003CONSTRUCTION

#011MM
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01931
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01932
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01932
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01931
DOB VIOLATION - ACTIVE
DOB NOW Safety (26)
IssuedViolationStatus
May 7, 2025Facades FISPFCS
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
Active
Feb 20, 2025Facades FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
Active
Feb 20, 2025Facades FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
Active
Feb 20, 2025Facades FISPHAZ
NYCHA CYCLE 9C UNSAFE REPORT FILED
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
HPD (6) · C 0 · B 2 · A 4
IssuedClassViolationCorrect by
Jan 24, 2011BApt 1H · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE ... IN THE KITCHEN LOCATED AT APT 1H, 1st STORYFeb 28, 2011
Aug 16, 2007BApt 7A · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... NORTH WEAST AND CEILING NORTH WALL IN THE BATHROOM LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTSep 20, 2007
Aug 16, 2007AApt 7A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST WALL, SOUTH WALL, EAST WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTNov 19, 2007
Aug 16, 2007AApt 7A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd RISER FROM EAST AT SOUTH WALL, 1st RISER FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTNov 19, 2007
Aug 16, 2007AApt 7A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 5th ROOM FROM NORTH, THE 4th ROOM FROM NORTH, THE 1st ROOM FROM NORTH, THE FOYER , THE KITCHEN LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WESTNov 19, 2007
Apr 30, 2007AApt 6G · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS IN THE FOYER LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM SOUTH AT WESTAug 8, 2007