10 floors · 450,000 sq ft · built 1989 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 16). Agency page | Dec 31, 2026 in 69 days | Due this year |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $31,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 121 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 450,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-19 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 1, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.NOTED EXIT DOORS#3,#6,#8 NOT SELF CLOSING.REM:REPAIR/REPLACE DOOR. #35734520Y | Jul 27, 2026 POP/IN-VIO | $0 |
| Jul 1, 2026 | Construction CLASS - 2 REISSUE ECB#35719836P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED LOOSE AND MISSING MORTAR AT JOINTS AT BRICK OUTSIDE EXIT#3AND #5.REM:REPAIR AND/OR REPLACE. #35734518P | Jul 27, 2026 POP/IN-VIO | $0 |
| Jul 1, 2026 | Construction CLASS - 2 REISSUE ECB#35719835N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 1ST FLOOR OUTSIDE EXIT#8 MULTIPLE CRACKS IN STACCO.REM:REPAIR AND/OR REPLACE. #35734519R | Jul 27, 2026 POP/IN-VIO | $0 |
| Sep 2, 2025 | Boilers CLASS - 2 FOUND CLEAVERBROOKS (MODEL# CB 400) BOILER IN CELLAR WITH INOPERABLE MOTORIZED DAMPER ON FLUE, CORRECT VIOLATING CONDITION SUBMIT CERTIFICATE OF CORRECTION #39159026X | Oct 20, 2025 POP/IN-VIO | $0 |
| Jul 1, 2025 | Construction CLASS - 2 REISSUE#35689095M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:LOOSE AND MISSING MORTAR JOINTS AT BRICK WORK OUTSIDE EXITS 3 AND 5.REM:REPAIR/REPLACE. #35719836P | Sep 4, 2025 POP/IN-VIO | $0 |
| Jul 1, 2025 | Construction CLASS - 2 REISSUE#35689097X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT FIRST FLOOR OUTSIDE EXIT DOOR#8 MULTIPLE CRACKS IN STUCCO NEED ATTENTION.REM:REPAIR/REPLACE. #35719835N | Sep 4, 2025 POP/IN-VIO | $0 |
| Apr 17, 2025 | Construction CLASS - 2 ATOI OBSERVED PROPERTY HAS VALID PERMITS ON FILE WITH THE DEPARTMENT. PERMITS NOT POSTED ON SITE., POST/PROPERLY POST PERMIT #39146018N | May 8, 2025 POP/IN-VIO | $0 |
| Sep 18, 2024 | Construction CLASS - 2 REISSUED ECB #35675068J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: MASONRY BRICKWALL MISSING MORTAR JOINTS. NEXT TO 1FL OUTSIDE EXIT DOORS 3, 5. REMEDY: REPLACE OR REPAIR. #35689095M | Oct 30, 2024 POP/IN-VIO | $0 |
| Sep 18, 2024 | Construction CLASS - 2 REISSUED ECB #35675066X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: 1ST FLOOR OUTSIDE OF EXIT DOOR #8 THE STUCCO HAS MULTIPLE CRACKS. REMEDY: REPAIR OR REPLACE. #35689097X | Oct 30, 2024 POP/IN-VIO | $0 |
| Aug 13, 2024 | Boilers CLASS - 2 FOUND CLEAVER BROOKS BOILER MODEL-CB-400 ACTIVE WITH DEFECTS AT TIME OF INSPECTION. DAMPER FOR EXHAUST FLUE DEFECTIVE. BURNER GASKET DEFECTIVE. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRE #39121777N | Aug 29, 2024 POP/IN-VIO | $0 |
| May 23, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED:OBSERVED DURING INSPECTION OF EXTERIOR STAIRS AT EXIT#3, EXIT #5, & EXIT #6 ARE ALL MISSING MORTAR FROM BETWEEN STEPS ALL THROUGHOUT. REMEDY: REPAIR #35675068J | Aug 24, 2023 POP/IN-VIO | $0 |
| May 16, 2022 | Construction CLASS - 2 REISSUE35553965Y DATE4.29.21 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANTMANNER ATOI I OBSERVED THAT@1FL FACADE EXP4 CEILING ABOVE EXIT8 CRACKED STUCCO/MASONRY IN MULTIPLE LOCATIONS.COMPLY W/CODE.REPAIR &OR REPLAC #35643343Z | Sep 15, 2022 POP/IN-VIO | $0 |
| Apr 29, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER AT TIME OF INSPECTION. NOTED: AT FACADE EXP#4 CEILING ABOVE EXIT#8 CRACKED STUCCO/MASONRY IN MULTIPLE LOCATIONS. REMEDY: COMPLY W/CODE. #35553965Y | Sep 2, 2021 POP/IN-VIO | $0 |
| Jun 19, 2017 | Elevators CLASS - 2 97X10.97X10 REPAIR DEVICE AS PER CODE & CONTACT NYC DOB FOR REVIEW #38254724M | Aug 31, 2017 POP/IN-VIO | $0 |
| Mar 5, 2012 | Unknown CLASS - 2 WORK W/O PERMIT. ILLEGAL WORK NOTED AT 3RD FLR ROOM 351 SUB-DIVIDED ROOM W/ELECTRIC IN WALLS FOR OUTLETS, SWITCHES. STOP ALL WORK! REMEDY: OBTAIN PERMIT. #34933922M | Apr 19, 2012 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 21, 2026 | CONSTRUCTION FAILURE TO MAINTAIN FACADE & APPURTANCES DUE TO AN INCIDENT WHICH OCURRED ON 7/18/2026 WHERE UNSECURED OUTDOOR FURNITURE FELL OFF ADJACENT BUILDING ROOF & CAUSED DAMAGE TO ROOF RAILING, COPING AND WINDOW SILL. REMEDY: OWNER TO MAINTAIN PUBIC PROTECTION IN PLACE UNTIL REPAIRS ARE COMPLETED. COMPLETE #FA0102EM | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30851 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30852 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01626 | DOB VIOLATION - ACTIVE |
| Jan 16, 2018 | ELEVATOR #9027/614702 | DOB VIOLATION - ACTIVE |
| Jan 16, 2018 | ELEVATOR #9027/614702 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #20142 | DOB VIOLATION - ACTIVE |
| Oct 8, 2010 | ELEVATOR ANNUAL INSPECTION / TEST #00017 | DOB VIOLATION - ACTIVE |
| Jan 4, 1999 | CONSTRUCTION #101MAD04 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
Showing 60 of 83. Full list on the agency site.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Jul 21, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN FACADE & APPURTANCES DUE TO AN INCIDENT WHICH OCURRED ON 7/18/2026 WHERE UNSECURED OUTDOOR FURNITURE FELL OFF ADJACENT BUILDING ROOF & CAUSED DAMAGE TO ROOF RAILING, COPING AND WINDOW SILL. REMEDY: OWNER TO MAINTAIN PUBIC PROTECTION IN PLACE UNTIL REPAIRS ARE COMPLETED. COMPLETE | Open |
| Jul 1, 2026 | ECB | Construction: EXIT DOOR NOT SELF-CLOSING.NOTED EXIT DOORS#3,#6,#8 NOT SELF CLOSING.REM:REPAIR/REPLACE DOOR. | Open |
| Jul 1, 2026 | ECB | Construction: REISSUE ECB#35719836P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED LOOSE AND MISSING MORTAR AT JOINTS AT BRICK OUTSIDE EXIT#3AND #5.REM:REPAIR AND/OR REPLACE. | Open |
| Jul 1, 2026 | ECB | Construction: REISSUE ECB#35719835N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 1ST FLOOR OUTSIDE EXIT#8 MULTIPLE CRACKS IN STACCO.REM:REPAIR AND/OR REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)