6 floors · 44 apartments · 49,000 sq ft · built 1928 · class D1 · owner of record: Skyrise Properties Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE8B REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY28-302.4 FOR CONTROL808197.AGG1 PRIOR NOV37021540Y UNDER 28-302.4 SUBMIT ACC #37022823Z | Jan 5, 2024 IN VIOLATION | $3,125 |
| Jun 1, 2021 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#808197. AGG1: PRIOR NOV#37012964N UNDER #37021540Y | Apr 8, 2022 IN VIOLATION | $3,125 |
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #808197. REM: SUBMIT REQUIRED TECHNICAL REPORT. #37012964N | Mar 1, 2019 IN VIOLATION | $0 |
| Mar 18, 2015 | Elevators CLASS - 1 97X10 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER;SERVICE EQUIPMENT ELEVATOR AS PER BC 3001.2 AND 27-987 DOB RECORDS SHOW THE ONLYELEVATOR IN BUILDING AS ACTIVE.UPON INSPECTION,THE DEVICE IS FOUND TO #38235392L | Sep 4, 2015 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01169 | DOB VIOLATION - ACTIVE |
| Mar 2, 2021 | ELEVATOR #9027/698186 | DOB VIOLATION - ACTIVE |
| Mar 12, 2020 | ELEVATOR #9027/675819 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #03748 | DOB VIOLATION - ACTIVE |
| Mar 4, 2019 | ELEVATOR #9027/644860 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 27, 2024 | C | Apt 5G · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Mar 22, 2024 |
| Feb 26, 2024 | C | Apt 5G · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) BAS | Mar 21, 2024 |
| Feb 22, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCK AT BOILER ROOM | Feb 28, 2024 |
| Oct 2, 2023 | C | Apt 1D · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT DOOR IN THE ENTRANCE LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 16, 2023 |
| Oct 2, 2023 | C | Apt 1D · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 8, 2023 |
| Oct 7, 2021 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH WALL AND WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 11, 2021 |
| Oct 7, 2021 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 11, 2021 |
| Oct 7, 2021 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 11, 2021 |
| Oct 7, 2021 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 11, 2021 |
| Oct 7, 2021 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 11, 2021 |
| Oct 7, 2021 | B | Apt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 11, 2021 |
| Aug 23, 2021 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND WALLS (APRX. 8 SQ.FT.) IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 14297258 ISSUED 19-APR-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE | Sep 27, 2021 |
| Aug 2, 2017 | B | Apt 5G · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 6, 2017 |
| Aug 11, 1998 | C | Apt 4F · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WEST ROOM SOUTH WEST WALL STEAM RISER 4TH STY NORTHWEST APT 4F MS STAGG NORTH SECTION. , SECTION '' '' | Aug 31, 1998 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 5:56 PM ET. BBL 2033270126.