class V1 · owner of record: Mta - Metro North
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 6, 2026 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURES OR TEMPORARY CONSTRUCTION "NO-TO BOARD". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 47 STORY ALREADY AT THE 5TH FLOOR LEVEL. OBSERVED #35730201Z | Dec 10, 2026 PENDING | $5,000 |
| Sep 17, 2026 | Construction CLASS - 1 NOTE: AT TIME OF INSPECTION, I OBSERVED 2 HOISTS IN PLACE, LOCATED AT THE BASEMENT LEVEL AND AT EXPO# 2, UPON REVIEWING THE APPROVED SITE SAFETY PLAN THE HOIST WAS NOT REFLECTED ANYWHERE ON THE PLAN. CREATING A #39559322N | Dec 3, 2026 | $2,500 |
| Sep 17, 2026 | Unknown CLASS - 1 NOTE: AT TIME OF INSPECTION OF AN INCIDENT WHERE A WORKER GOT SHOCKED WHILE PERFORMING HOIST OPERATIONS. UPON REVIEWING THE REQUIRED PRE-SHIFT SAFETY MEETING IT WAS NOTED THAT THE TASK AND SPECIFIC SAFETY CONCE #39559303H | Dec 3, 2026 | $5,000 |
| Jul 30, 2026 | Unknown CLASS - 2 (1RCNY 3319-01(C)(5)(I)(A)THE MOBILE CRANE(CD5380 CN45826) USER NYC CONSTRUCTORS,LLC FAILED TO NOTIFY THE DEPARTMENT PROPERLY OF THE CRANES ARRIVAL ON 7/30/2026. THEY MUST MAKE THE NOTIFICATION 24-48 HOURS PRIO #39198436K | Oct 8, 2026 STIPULATION/IN-VIO | $2,500 |
| Feb 11, 2026 | Unknown CLASS - 1 3304.4.2/3315.1.4 49 STORY NB AT SOE PHASE.OBSERVED UNSAFE CONDITIONS FOR WORKER'S ONSITE. INADEQUATE EARTHWORK RAMP. EQUIPMENT PARKED ON RAMP WITH WORKERS USING FOR EGRESS. RAMP NOT 4 TO 1.MISSING BARRIERS EGR #39550281P | Jan 14, 2027 | $5,000 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 6, 2026 | ECB | Construction: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURES OR TEMPORARY CONSTRUCTION "NO-TO BOARD". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 47 STORY ALREADY AT THE 5TH FLOOR LEVEL. OBSERVED | Open |
| Sep 17, 2026 | DOB | CONSTRUCTION: UBS EMPLOYEE RECEIVED AN ELECTRIC SHOCKED WHILE ATTEMPTING TO WIRE TEMPORARY HOIST ELEVATOR MOTOR WITHOUT DE-ENERGIZING THE CIRCUIT. DUE TO HUMAN ERROR | Closed |
| Sep 17, 2026 | ECB | Construction: NOTE: AT TIME OF INSPECTION, I OBSERVED 2 HOISTS IN PLACE, LOCATED AT THE BASEMENT LEVEL AND AT EXPO# 2, UPON REVIEWING THE APPROVED SITE SAFETY PLAN THE HOIST WAS NOT REFLECTED ANYWHERE ON THE PLAN. CREATING A | Closed |
| Sep 17, 2026 | ECB | Unknown: NOTE: AT TIME OF INSPECTION OF AN INCIDENT WHERE A WORKER GOT SHOCKED WHILE PERFORMING HOIST OPERATIONS. UPON REVIEWING THE REQUIRED PRE-SHIFT SAFETY MEETING IT WAS NOTED THAT THE TASK AND SPECIFIC SAFETY CONCE | Closed |
| Jul 30, 2026 | ECB | Unknown: (1RCNY 3319-01(C)(5)(I)(A)THE MOBILE CRANE(CD5380 CN45826) USER NYC CONSTRUCTORS,LLC FAILED TO NOTIFY THE DEPARTMENT PROPERLY OF THE CRANES ARRIVAL ON 7/30/2026. THEY MUST MAKE THE NOTIFICATION 24-48 HOURS PRIO | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 5:51 PM ET. BBL 1012790023.