Brooklyn · Block 5960 · Lot 67 · 11209

343 78 Street

3 floors · 8,100 sq ft · built 1931 · class P2 · owner of record: Bay Ridge Post Et Al

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-02 (Accepted). Agency page

Dec 31, 2026
in 67 days
1 of 1 without an accepted 2026 report yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (4)
IssuedViolationStatus
Oct 1, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
#07629
DOB VIOLATION - ACTIVE
Jan 14, 1999CONSTRUCTION
WORK WITH OUT A PERMIT. WORK NOTED: HAVING ERECTED. 2 BATHROOMS APPROX 20 8X8 HIGH. PARTITIONS WALL ERECTED CREATING BATHROOMS WITH WASTE LINES FOR TOILET AND BALSEN SINK AND WATER LINES. ALSO ELECTRICAL FIXTURES AT NORTH SIDE AT 2ND FLOOR. REMEDY OBTAIN A PERMIT IF FEASIBLE ARE RESTORE PERMISES TO
#10RH02
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Jun 1, 1994LOCAL LAW 62/91 - BOILERS

#14275
DOB VIOLATION - ACTIVE
Jun 1, 1993LOCAL LAW 62/91 - BOILERS

#14274
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 1, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Active
Feb 7, 2000Boiler LL6291
Active
Jun 1, 1994Boiler LL6291
Active
Jun 1, 1993Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 11:35 AM ET. BBL 3059600067.

Look up another building