6 floors · 41,586 sq ft · built 1900 · class G1 · owner of record: Brause 34059 Property Co
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 46 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,586 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 6, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. 1-FLOORS CRACKED THROUGHOUT ALL FLOORS. 2-CEILING CRACKED REPAIRED &/OR COVERED OVER W/TIN,PLYWOOD ETC. 3-THRU FLOOR PENETRATIONS-NO FIRESTOPPING. 4-EXIT #34940749N | Feb 24, 2012 IN VIOLATION | $0 |
| Jan 6, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER-GENERAL LIGHTINGLIGHTING FOR EXITS ARE NOT OPERATIONAL ON EACH FLOOR EXIT EMERGENCY LIGHTING NOT PROVIDED LIGHT FIXTURES MISSING BULBS,BROKEN FIXTURES ETC. #34940901Z | Feb 24, 2012 IN VIOLATION | $0 |
| Jan 6, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. REMOVE LARGE AMOUNTS OF MISC DEBRIS AT FOLLOWING AREAS. 1-SPACE UNDER-WATER TANK. 2-ROOF ENCLOSED SPACE (ROTTED/BURNT WOOD) 3-REAR YARD 4-CELLAR FRONT UNDE #34940902K | Feb 24, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 22, 2024 | CONSTRUCTION FULL(ENTIRE PARK.STRUC.ALL 7FL.)VACATE ORDER. NOTE-INSPECTION OF THIS BUILDING STORY(6+C) (7LEVEL) INDEPENDENT STRUCTURE OBSERVED UNSAFE CONDITION AS PER OPSI FILING. AFTER DOB PLAN EXAMINER REVIEW RECOMME FULL VACATE OF ENTIRE PARKING STRUCTURE. REMEDY, IMMEDIATELY VACATE ENTIRE PARKING STRUCTURE A #LL10601MK | DOB VIOLATION - ACTIVE |
| Apr 25, 2024 | CONSTRUCTION EMERGENCY WORK ORDER.NOTE ON AN ACTIVE PARKING STRUCTURE CONSISTING OF 7 LEVELS,OBSERVED:1)GENERAL CRACK THROUGHOUT ON ALL FLOORS.2)SPALLED F ALSE CEILING ON ALL FLOORS AT SEVERAL LOCATIONS.3)STEEL BEAM DAMAGE ON ON THE CEILING LEVEL.REMEDY:OWNER TO RETAIN A NYS REG DESIGN PROFESSIO NAL TO SUPERVISE #LL10601MK | DOB VIOLATION - ACTIVE |
| Apr 27, 2020 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS #00110 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #09578 | DOB VIOLATION - ACTIVE |
| Apr 5, 2019 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST #04595 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #11109 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #11110 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #10995 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #10996 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #12067 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #12066 | DOB VIOLATION - ACTIVE |
| May 30, 2014 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST #10122 | DOB VIOLATION - ACTIVE |
| Oct 1, 2012 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST #01204 | DOB VIOLATION - ACTIVE |
| Feb 25, 1993 | CONSTRUCTION #06PK02 | VIOLATION UNSERVED ECB-ACTIVE |
| Feb 25, 1993 | CONSTRUCTION #06PK02 | DOB VIOLATION - ACTIVE |
| Oct 24, 1989 | CONSTRUCTION #B3PS02 | DOB VIOLATION - ACTIVE |
| Oct 16, 1989 | CONSTRUCTION #B3PS03 | DOB VIOLATION - ACTIVE |
| Aug 3, 1989 | CONSTRUCTION #B3PS04 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Apr 27, 2020 | Facades FISPFCS CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| May 30, 2014 | Elevators ACC1 | Active |
| Oct 1, 2012 | Elevators EVCAT1 | Active |
| Oct 1, 2012 | Elevators EVCAT1 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 20, 2026 | ECB | Unknown: FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. AS NOTED AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF CELLAR AND 6 LEVELS, OBSERVED CRACKING AT NORTH ELEVATION FACADE AND CRACKI | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:36 PM ET. BBL 1013510032.