Brooklyn · Block 4998 · Lot 4 · 11210

3415 Farragut Road

7 floors · 42 apartments · 40,877 sq ft · built 2019 · class D6 · owner of record: 435 Marion Llc

31open violations
$20,000ECB/OATH penalties owed
1HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 40,877 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $90,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 464 days
No Cycle 10 report on record yet

Open violations

ECB / OATH (5) · $20,000 owed
IssuedViolationHearingBalance
Apr 1, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39108320R AS OF 4/1/2026., FILE A CERTIFICATE O
#39182742M
Jun 10, 2026
IN VIOLATION
$625
Apr 1, 2026Construction CLASS - 1
UNLAWFULLY CONTINUED WORK ON NOTICE OF A STOP WORK ORDER. OBSERVED ON 1ST FLOOR COMMERCIAL SPACE MECHANICAL UNIT AND DUCTS ARE 100% COMPLETE AND IN OPERATION AGAINST SWO #3986163 ISSUED 12/02/24., COMPLY WITH S
#39182757P
Jan 4, 2027
$10,000
Dec 2, 2024Construction CLASS - 2
ATOI OBSERVED IN COMMERCIAL SPACE AT GROUND LEVEL ILLEGAL INSTALL OF MECHANICAL HVAC DUCT SYSTEM WITHOUT PERMIT .APPROXIMATELY 65% WORK COMPLETE., OBTAIN ALL PERMITS; OBTAIN PERMIT
#39131752X
Aug 28, 2025
IN VIOLATION
$625
Mar 12, 2024Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES. AT TIME OF INSPECTION, I OBSERVED DAMAGED E.I.F.S. STUCCO SURFACE ON BALCONY DECK EDGE(6 FLOOR B LINE) AT EXPOSURE(1) SOUTH ELEVATION. AND LARGE AREA OF E.I
#35682260P
May 22, 2024
DEFAULT
$6,250
Mar 11, 2024Construction CLASS - 1
AREA OF FOAM PANELS AND STUCCO (APPROX.. 50FT X 20FT ) HAVE BECOME DETACHED FROM BUILDING AND FALLEN TO PEDESTRIAN SIDEWALK., MAINTAIN EXTERIOR BUILDING WALL
#39108320R
Jun 17, 2024
IN VIOLATION
$2,500
DOB (5)
IssuedViolationStatus
Jun 30, 2026CONSTRUCTION
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #031225CFA01 701YC REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES B Y A PE/RA AND SUBMIT A REPORT TO FACADES VIA EMAIL IMMEDIATELY.AS OF 6 /30/26,NO HANDS ON INSPECTION SUBMITTED TO FACADES UNIT.REMEDY:COMPLY WITH DOB VIOLATIO
#LL31705CM
DOB VIOLATION - ACTIVE
Mar 12, 2025CONSTRUCTION
FTM DUE TO OBSRVED UNSF FACDE CONDIT @ EXP2 W.ELEV OBSRVED FALLEN OFF EIFS STUCCO WALL, LOOSE EIFS STUCCO WALL FROM ROOFEDGE TO 6FL. A LARGE PORTION OF EIFS STUCCO WALL ARE MISSING FROM THE EXTER WALL. REMDY: IMMEDLY RETAIN SERVICE OF NYS RDP TO INSPECT/EVALUTE 100% OFHANDS-ON OF UNSF FACDE CONDIT.S
#FA01701YC
DOB VIOLATION - ACTIVE
Mar 18, 2024CONSTRUCTION
.PARTIAL VACATE ORDER ON 03/12/24 BY A DACADE INSPECTOR THERE IS A LARGED AREA OF EXTERIOR.INSULATION EXISTING INISING SYSTEM WALL FALLIN OFF THESEN
#FA1703YC
DOB VIOLATION - ACTIVE
Mar 12, 2024CONSTRUCTION
EMERGENCY WORK ORDER TO SECURE UNSAFE FACADE IN THE FOLLOWING OF INCID ENT 42936.THE FALLEN EXTERIOR INSULATION FINISHING SYSTEM AT EXP2 WEST ELEV.FOR THE SAFETY OF PUBLIC,OWNER IS REQUIRED TO PROVIDE SAFETY MEAS URES AT OTHER EXPOSURES.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES SUC H AS SWS AT EXP1
#FA1702YC
DOB VIOLATION - ACTIVE
Mar 11, 2024CONSTRUCTION
. AT TIME OF INSPECTION OBSERVED AREA OF FOAM PANELS AND STUCCO (APPROX.. 50FT X 20FT ) AT 7TH STY LEVEL HAVE BECOME DETACHED FROM BUILDING AND FALLEN TO PEDESTRIAN SIDEWALK AT EXP.1.
#24-00721
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
HPD (25) · C 1 · B 14 · A 10
IssuedClassViolationCorrect by
Oct 9, 2026A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 50 SQ FT AGGREGATE OBSERVED AT CEILING NEAR AIR VENTS AT PUBLIC HALL, 3rd STORYJan 12, 2027
Sep 18, 2026BApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 23, 2026
Sep 18, 2026BApt 6A · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 23, 2026
Sep 18, 2026AApt 3E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 22, 2026
Sep 18, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH AND WEST WALLS AT PUBLIC HALL STAIRS, 2nd STORYDec 22, 2026
Sep 18, 2026BApt 6A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 23, 2026
Sep 18, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING, SOUTH AND WEST WALLS AT PUBLIC HALL STAIRS, 2nd STORYOct 23, 2026
Sep 18, 2026B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL STAIRS, 2nd STORYOct 23, 2026
Sep 18, 2026A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT CEILING AT PUBLIC HALL, 3rd STORYDec 22, 2026
Aug 10, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMANov 13, 2026
Aug 10, 2026A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDNov 13, 2026
Jun 1, 2026A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORYSep 4, 2026
Jun 1, 2026AApt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 4, 2026
Jun 1, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 2nd STORYSep 4, 2026
Mar 16, 2026BApt 5D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHApr 20, 2026
Mar 16, 2026BApt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHApr 20, 2026
Feb 2, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AND EAST WALL AT PUBLIC HALL STAIRS, 7th STORY, SECTION ''A''Mar 9, 2026
Feb 2, 2026BApt 6D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMar 9, 2026
Feb 2, 2026BApt 6D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMar 9, 2026
Feb 2, 2026BApt 6D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMar 9, 2026
Feb 2, 2026BApt 6D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMar 9, 2026
Feb 2, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT PUBLIC HALL STAIRS, 7th STORY, SECTION ''A''May 8, 2026
Feb 2, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND EAST WALL AT PUBLIC HALL STAIRS, 7th STORY, SECTION ''A''Mar 9, 2026
Jan 29, 2026C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING FRONT ENTRANCE DOOR , 1st STORYFeb 4, 2026
Jan 29, 2026BApt 5E · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK, LOW VOLUME IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 5, 2026

Issued in the last 120 days

DateSourceWhatNow
Oct 9, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 50 SQ FT AGGREGATE OBSERVED AT CEILING NEAR AIR VENTS AT PUBLIC HALL, 3rd STORYOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Sep 18, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Sep 18, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Sep 18, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 18, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH AND WEST WALLS AT PUBLIC HALL STAIRS, 2nd STORYOpen
Sep 18, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Sep 18, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING, SOUTH AND WEST WALLS AT PUBLIC HALL STAIRS, 2nd STORYOpen
Sep 18, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL STAIRS, 2nd STORYOpen
Sep 18, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT CEILING AT PUBLIC HALL, 3rd STORYOpen
Aug 10, 2026HPD A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAOpen
Aug 10, 2026HPD A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 10:03 AM ET. BBL 3049980004.

Look up another building