class V1 · owner of record: Hipotech Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 13, 2022 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED A TEMPORARY CONSTRUCTION FENCE IN PLACE WHICH EXPIRED ON 04/01/2021 UNDER PERMIT B00087400-I1-FN. #39502148J | Oct 19, 2022 DEFAULT | $6,250 |
| Dec 14, 2020 | Construction CLASS - 1 WORK W/O PERMIT.SHORING&BRACING @TIME OF MY INSPECTION I OBSERVED MAKESHIFT SHORING&BRACING OF EXP1 STRUCTURE.UPON MY RESEARCH IN DOB SYSTEMS THERE WAS NO PERMIT.THERE WAS ASSURANCE THAT MAKESHIFT BRACING&SHORI #35497522L | Jan 24, 2022 IN VIOLATION | $2,500 |
| Oct 22, 2020 | Site Safety CLASS - 1 FAILURE TO DESIGNATED &/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENT ON SITE WHEN REQUIRED. AT TIME OF INSPECTION ON AN ACTIVE 3 STY DEMO CONSTRUCTION SITE NOTICE 2 WORKERS ON SITE WORKING,1 WORKER WAS ON TOP #35497026M | Mar 28, 2022 IN VIOLATION | $10,000 |
| Oct 22, 2020 | Construction CLASS - 2 PERMIT HOLDER FAIL TO PROVIDE ACCESS &/OR EXPOSE WORK ON ACTIVE SITE. AT TIME OF INSPECTION ON AN ACTIVE 3 STY DEMO CONSTRUCTION SITE NOTICE2 WORKERS INSIDE THE SITE(1)AT EXP#1 TOP OF THE CONSTRUCTION FENCE #35497027Y | Mar 28, 2022 IN VIOLATION | $1,250 |
| Oct 7, 2020 | Construction CLASS - 2 SEC. 3307.6.4.8 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION. NOTE: AT TIME OF MY INSPECTION OF 3 STY BLDG I OBSERVED SIDEWALK SHED IN PLACE AT EXP#1 OF THE BLDG W/O IGHTING TO CREATE ILLUMINATION FOR #35499504R | Feb 17, 2021 IN VIOLATION | $2,400 |
| Issued | Violation | Status |
|---|---|---|
| Apr 9, 2001 | CONSTRUCTION #ZSTF01RR | DOB VIOLATION - ACTIVE |
| Apr 9, 2001 | ZONING #STF02RR | DOB VIOLATION - ACTIVE |
| Apr 9, 2001 | ZONING #STF01RR | DOB VIOLATION - ACTIVE |
| Apr 9, 2001 | CONSTRUCTION #ZSTF02RR | DOB VIOLATION - ACTIVE |
| May 18, 2000 | CONSTRUCTION #ZSTF07GN | DOB VIOLATION - ACTIVE |
| May 18, 2000 | ZONING #STF08GN | DOB VIOLATION - ACTIVE |
| Jul 8, 1999 | CONSTRUCTION WORK WITHOUT A PERMIT. REMOVED CEILING AND INSTALLED NEW CEILING SUPPORTS AND BARS. REMOVED INTERIOR PARTITION. INSTALLED NEW METAL STUDS. (ALL WORK DONE IN THE 1ST FL) REMEDY: STOP ALL WORK AND OBTAIN PERMIT. NOTIFY DEPT. OF BLDGS BEFORE RETURNING TO WORK AT 718-802-3685 #02M04 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Jun 17, 1999 | CONSTRUCTION #02MJ10 | DOB VIOLATION - ACTIVE |
| Aug 11, 1998 | CONSTRUCTION WORK WITHOUT A PERMIT/HAZARDOUS WORK NOTED/FIRE SEPARATION REMOVED BETWEEN 1ST FLR STORE & STAIRS TO 2ND FLR DWELLING SPACE. AREA FORMED & JOISTS CUT,3 X 3 POSTS INSTALLED FOR STRUCTURAL SUPPORT. AT 2ND FLR BEARING PARTITION REMOVED AS A RESULT 3RD JOISTS CRACKED & SCARF JOINT DEFLECTED. REMEDY: OBT #02MJ10 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Aug 11, 1998 | CONSTRUCTION HAZARDOUS #02MJ12 | DOB VIOLATION - ACTIVE |
| Aug 11, 1998 | CONSTRUCTION HAZARDOUS #02MJ11 | DOB VIOLATION - ACTIVE |
| Jul 29, 1998 | CONSTRUCTION #0201SC | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 7:38 AM ET. BBL 3020440090.