5 floors · 38 apartments · 35,455 sq ft · built 1925 · class C1 · owner of record: 3405 Kossuth Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-04-29 (Accepted). Agency page | Dec 31, 2026 in 64 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 35,455 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06715 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2002485 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Active |
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 26, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 30, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING, NORTH AND EAST WALL, AT INTERMEDIATE LANDING AT SOUTH SECTION AT PUBLIC HALL STAIRS, 5th STORY | Dec 4, 2025 |
| Oct 30, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AT 2nd PUBLIC HALL BULKHEAD FROM NORTH | Feb 2, 2026 |
| Oct 30, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 2nd STORY | Feb 2, 2026 |
| Oct 30, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH AND EAST WALL, AT INTERMEDIATE LANDING AT SOUTH SECTION AT PUBLIC HALL STAIRS, 5th STORY | Feb 2, 2026 |
| Sep 25, 2025 | B | Apt A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Oct 30, 2025 |
| Sep 17, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 2nd STORY | Dec 21, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD BASE CABINETS AT SINK IN THE KITCHEN LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL, EAST WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | C | Apt 3F · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jun 5, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE BATHROOM LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | A | Apt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Aug 1, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | B | Apt 3F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 3F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jun 2, 2025 |
| Dec 18, 2023 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 22, 2024 |
| Aug 29, 2023 | C | Apt C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Sep 24, 2023 |
| Aug 29, 2023 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE KITCHEN LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Oct 3, 2023 |
| Aug 29, 2023 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ALL WOOD FLOORS IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Oct 3, 2023 |
| Aug 29, 2023 | C | Apt C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Sep 24, 2023 |
| Dec 21, 2021 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT BOILER ROOM | Dec 27, 2021 |
| Apr 13, 2017 | A | Apt C · § 27-2005 ADM CODE REFIT DOOR IN THE BATHROOM LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | Jul 17, 2017 |
| Apr 13, 2017 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT SINK IN THE KITCHEN LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | May 18, 2017 |
| Apr 13, 2017 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | May 18, 2017 |
| Apr 13, 2017 | A | Apt C · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE SADDLE IN THE ENTRANCE LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | Jul 17, 2017 |
| Apr 13, 2017 | B | Apt C · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE STANDING DRAIN PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | May 18, 2017 |
| Apr 13, 2017 | B | Apt C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | May 18, 2017 |
| Apr 13, 2017 | A | Apt C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | Jul 17, 2017 |
| Apr 13, 2017 | A | Apt C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT C, 1st STORY, APARTMENT AT WEST , SECTION AT SOUTH | Jul 17, 2017 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 11:05 AM ET. BBL 2033270060.