7 floors · 133,660 sq ft · built 1971 · class I6 · owner of record: 3400 Cannon Place, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-08-14 (Accepted). Agency page | Dec 31, 2026 in 66 days | 5 of 5 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 133,660 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $321,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 483 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3258). Agency page | Dec 31, 2028 in 797 days | Next due 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 29, 2025 | Unknown CLASS - 2 3303.11.2 STAIRS DURING BUILDING CONSTRUCTION OR ENLARGEMENTS- OBSERVED ACTIVE JOBSITE CURRENTLY AT 5TH FLOOR LEVEL. AS PER CODE JOBSITE SITE IS REQUIRED 1 SET OF PERMANENT STAIRS WHEN REACHING 4 STORIES OR 40 #39540753P | Dec 3, 2026 | $2,500 |
| Mar 28, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.AT EASTELEVATION,EXPOSURE#4 OBSERVED BULGED FACADE MASONRY BRICK BETWEEN 2ND & 3RD FLOOR.THIS CONDITION POSING DANGER OF COLLAPSING AND IMMEDIATE H #35682575J | Oct 31, 2025 IN VIOLATION | $0 |
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL # 808115. REMEDY:SUBMIT REQUIRED TECHNICAL REPORT #37013643R | Mar 29, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 29, 2026 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONR'S ORDER: DOB VIOLATION #032824CFA08 02MH REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES.BY RDP WITH QEWI & SUBMIT HANDS ON INSPECTION REPORT TO FACADE VIA EMAIL AS OF 6/29/2026, NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADES UNIT. REMEDY: COMPLY #LL20811CM | DOB VIOLATION - ACTIVE |
| Mar 19, 2025 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT DUE TO VEHICLE IMPACTING SIDEWALK SHED AT EXPOSURE#3 AND DISLODGING 3 UPRIGHTS AND 2 SECTIONS OF CROSS BRACING AND 2 BEAMS. #25-00488 | DOB VIOLATION - ACTIVE |
| Aug 1, 2024 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FAILURE TO CORRECT SWARMP CONDITIONS #00031 | DOB VIOLATION - ACTIVE |
| Aug 1, 2024 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FAILURE TO CORRECT SWARMP CONDITIONS #00029 | DOB VIOLATION - ACTIVE |
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00700 | DOB VIOLATION - ACTIVE |
| May 29, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00113 | DOB VIOLATION - ACTIVE |
| Mar 28, 2024 | CONSTRUCTION FAILURE TO MAINTAIN FACADE & APPURTENANCES AT EAST ELEVATION EXPOSURE #1BULGED MASONRY BRICK AT (2ND OF 3RD...REMEDY:RETAIN RDP WITH QEWI CE CERT.&MASONRY BRICK FACADE EXPERIENCE TO INSPECT & EVALUATE 100%HANDS ON AND PROBE THE ENTIRE FACADE MASONRY TO DTERMINE CODE COMPLIANCE& ENSURE STABILITY OF R #FA0802MH | DOB VIOLATION - ACTIVE |
| Mar 28, 2024 | CONSTRUCTION .EMERGENCY WORK ORDER DUE TO BULGED MASONRY BRICKS AT EAST ELEVA.EXP#4 BETWEEN 2ND&3RD FLOOR.REMEDY:OWNER IMMED PROV.PLOT PLANWITH DIMENSIONS NOTING THE AREA TO BE CLOSE OFF NO WORKS SHOULD BE NEAR DEFECT.FACADE INSTALL FENCE AT ALL IMPACTED AREAS.RETAIN RDP TO DIRECT&SUPERV.ALL TH THE WORKS(RDP)SUB #FA0801MH | DOB VIOLATION - ACTIVE |
| Feb 9, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911419 | DOB VIOLATION - ACTIVE |
| Feb 9, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911418 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #26811 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #06871 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #09403 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #09404 | DOB VIOLATION - ACTIVE |
| Apr 22, 2023 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) #00518 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01197 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01196 | DOB VIOLATION - ACTIVE |
| Aug 21, 2022 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) #01064 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101754 | DOB VIOLATION - ACTIVE |
| Jun 20, 2021 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020 #10266 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #03915 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #03912 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #03913 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #03914 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #03916 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #06766 | DOB VIOLATION - ACTIVE |
| Apr 4, 2018 | CONSTRUCTION NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO PERMIT HOLDER WITHDRAW AL FROM JOB #220491625 #0803JM | DOB VIOLATION - ACTIVE |
| Nov 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00179 | DOB VIOLATION - ACTIVE |
| Aug 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00232 | DOB VIOLATION - ACTIVE |
| May 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00491 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #04480 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #04482 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #04481 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #04479 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #01003 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #00993 | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01224 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #07383 | DOB VIOLATION - ACTIVE |
| Mar 8, 2007 | CONSTRUCTION #081JG | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #07715 | DOB VIOLATION - ACTIVE |
| Dec 27, 2002 | ELEVATOR 2P4444 #9011/266637 | DOB VIOLATION - ACTIVE |
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #01914 | DOB VIOLATION - ACTIVE |
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #01913 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Aug 1, 2024 | Facades FISPFCS FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Aug 1, 2024 | Facades FISPFCS FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| May 29, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 9, 2024 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Feb 9, 2024 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 22, 2023 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Aug 21, 2022 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Jun 20, 2021 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Nov 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 11:47 AM ET. BBL 2032580162.