Manhattan · Block 1248 · Lot 51 · 10024

340 West 87 Street

9 floors · 29 apartments · 29,303 sq ft · built 1925 · class D3 · owner of record: 340 West 87 St Llc

11open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 29,303 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $84,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 464 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-30 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 4, 2020Plumbing CLASS - 1
FAILURE TO HAVE NEW ALTERED PLUMBING SYSTEM TESTED I OBSERVED IN THE CELLAR GAS LINES ROUGHED IN WITH GAS VALVES IN LAUNDRY ROOM WITHOUT HAVING PERMITS THEREFORE NO TEST, PERFORM TEST
#39016892Y
Oct 15, 2020
IN VIOLATION
$0
Feb 4, 2020Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER I OBSERVED IN THE CELLAR HAVING FUTURE ON GAS LINES AND HAVING A UNION ON GAS LINE . ALSO IN CELLAR USING A JIM CAP ON WASTE LINE, REPAIR AND/REPLACE
#39016894H
Oct 15, 2020
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Aug 30, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
#00143
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
HPD (7) · C 2 · B 5 · A 0
IssuedClassViolationCorrect by
Feb 3, 2026CApt 8A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM WEST AT NORTHJan 31, 2026
Feb 3, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOMFeb 9, 2026
May 21, 2024BApt 9A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH, WEST & EAST WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 9A, 9th STORY, 1st APARTMENT FROM WEST AT NORTHJun 25, 2024
May 21, 2024BApt 9A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH, SOUTH, EAST WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 9A, 9th STORY, 1st APARTMENT FROM WEST AT NORTHJun 25, 2024
Oct 2, 2018BApt 5C · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2018
Oct 2, 2018BApt 5C · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT SOUTH AND WEST WALL IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2018
Oct 2, 2018BApt 5C · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 6:03 AM ET. BBL 1012480051.

Look up another building