8 floors · 63 apartments · 61,916 sq ft · built 2024 · class D7 · owner of record: 340 Myrtle Development Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 61,916 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 847 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2073). Agency page | Dec 31, 2033 in 2621 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 2, 2025 | Construction CLASS - 1 GC WORKED AGAINST STOP WORK ORDER UNDER REFERENCE COMPLAINT# 3978777 ISSUED 10/01/2024. OBSERVED 8 STORY NEW BUILDING COMPLETED WHILE UNDER THE COMMISSIONER ORDER TO STOP WORK. #39540876P | Aug 6, 2025 DEFAULT | $12,500 |
| Jan 9, 2025 | Construction CLASS - 1 AT THE TIME OF INSPECTION OF A PROPOSED 8-STORY NEW BUILDING AT SUPERSTRUCTURE PHASE IT WAS OBSERVED INADEQUATE GUARDRAILS AT THE ROOF LEVEL MISSING TOE BOARDS. INSTITUTE AND MAINTAIN ALL SAFETY MEASURES REQUIR #39535836Y | Jun 9, 2026 IN VIOLATION | $5,000 |
| Jan 9, 2025 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE OF AN 8-STORY LOW RISE BUILDING AT SUPERSTRUCTURE PHASE IT WAS OBSERVED INADEQUATE STORAGE OF MATERIAL, EQUIPMENT AND DEBRIS ON THE SIDE WALK SHED PLATFORM DECK. M #39535837X | Jun 9, 2026 IN VIOLATION | $2,400 |
| Oct 1, 2024 | Unknown CLASS - 1 3308.6.1.4.1 SUPPORTED SCAFFOLD ALTERNATIVE. AT TIME OF MY INSPECTION OBSERVED: PROPOSED 8 STORIES NEW BUILDING, AT 8 FL. DECKING LEVEL 85 FEET HEIGHT APPROX. MISSING/INADEQUATE HORIZONTAL NETTING OR ALTERNATIV #39532960H | Dec 2, 2025 IN VIOLATION | $2,500 |
| Aug 24, 2024 | Construction CLASS - 1 ATOI I OBSERVED AN ACTIVE CONSTRUCTION SITE WITH APPROX. 65 WORKERS ON SITE, A PROPOSED 9-STORY NB CURRENTLY AT THE 2ND FLOOR LEVEL. UPON REVIEW OF DEPARTMENT RECORDS(BIS & DOB NOW) OBSERVED NO PERMIT FOR NB WA #39531763Y | Mar 27, 2025 IN VIOLATION | $2,500 |
| Aug 24, 2024 | Unknown CLASS - 1 FAILURE TO PROVIDE WATCHPERSON-BC-3303.3.ATOI AT THE PROPOSED 9-STORY NB NO CONSTRUCTION ACTIVITIES, I OBSERVED THAT THERE WAS NOT A SECURITY GUARD-WATCHPERSON AS REQUIRED BY CODE. PROPOSED FOOTPRINT BUILDING I #39531772X | Mar 27, 2025 IN VIOLATION | $2,500 |
| Aug 24, 2024 | Unknown CLASS - 1 WORK AT STORAGE ZONE-BC 3307.4.7. OBSERVED INADEQUATE STORAGE ZONE, HEAVY EQUIPMENT IN PLACE AT EXP. # 1 AND EXP. # 2. STORAGE ZONE NOT ENCLOSED WITH SOLID 4 FT PLYWOOD AND WIRE MESH ON THE TOP AS REQUIRED BY C #39531767L | Mar 27, 2025 IN VIOLATION | $5,000 |
| Nov 14, 2023 | Construction CLASS - 1 AT THE TIME OF INSPECTION ACTIVE DEMOLITION SITE, I OBSERVED DEMOLITION IN PROGRESS WITH YODOCKS IN PLACE WITH,NO GUARDRAIL SYSTEM AROUND PERIMETERS TO PROTECT WORKERS FROM ANY FALL HAZARD WHICH CAN RESULT IN #39523359M | Mar 21, 2025 IN VIOLATION | $553 |