8 floors · 222,600 sq ft · built 1929 · class E7 · owner of record: Ess Prisa Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $1,246,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 117 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 222,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2599). Agency page | Dec 31, 2029 in 1161 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE CYCLE 7A, 8A, 9A, REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #907674. AGG2: HISTORY OF NONCOMPLIANCE ON 370 #37026063N | Apr 19, 2024 DEFAULT | $5,000 |
| May 18, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#807674. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT #37010558Z | Sep 21, 2018 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Aug 19, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #910448 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00831 | DOB VIOLATION - ACTIVE |
| Dec 14, 2018 | FACADE SAFETY PROGRAM #HAZ87699 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #00989 | DOB VIOLATION - ACTIVE |
| Dec 15, 2014 | FACADE SAFETY PROGRAM CYCLE 7 REPORT FILED UNSAFE #HAZ75448 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #01047 | DOB VIOLATION - ACTIVE |
| Dec 26, 2012 | CONSTRUCTION #0101SL | DOB VIOLATION - ACTIVE |
| Jan 29, 2001 | CONSTRUCTION #ZSTF01AC | DOB VIOLATION - ACTIVE |
| Aug 29, 1994 | ZONING #0101W | DOB VIOLATION - ACTIVE |
| Aug 29, 1994 | ZONING #010W | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 19, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Dec 14, 2018 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Dec 15, 2014 | Facades FISP CYCLE 7 REPORT FILED UNSAFE | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 7:19 AM ET. BBL 2025990165.