22 floors · 642 apartments · 550,000 sq ft · built 1963 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual boiler inspection (8 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-19 (Accepted). Agency page | Dec 31, 2026 in 63 days | 4 of 8 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 550,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2304). Agency page | Dec 31, 2034 in 2985 days | Next due 2034 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-11-21) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 27, 2011 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING. *WEST ELEVATION, EXPOSURE # 1, OBSERVE METAL FOOD CAN INSTALLED UNDER AIR CONDITION UNIT. *EAST ELEVATION, EXPOSURE # 3, OBSERVE BLOCKS OF WOOD IMPROPERLY INSTALLED UNDER #34925716L | Mar 2, 2012 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 16, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION ON EXPOSURE #3 BROKEN WINDOW PANE ON 1ST FLOOR. ROOF: DETERIORATED, SPALLING, CRACKED WATER TOWNER CONCRETE SUPPORTING BEAMS & COLUMNS AT MULTIPLE LOCATIONS. REMEDY: REPAIR AND/OR REPLACE DAMAGE FACADE AND APPURTANCES #SR0103RF | DOB VIOLATION - ACTIVE |
| May 15, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED UNSECURED FLASHING AT ROOF LEVEL ON EXPOSURE 3 NORTH ELEVATION REMEDY: REPAIR AND/OR REPLACE #SR20101XN | DOB VIOLATION - ACTIVE |
| May 15, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING INA CODE COMPLIANT MANNER. OBSERVED UNSECURED FLASSHING AT ROOF LEVEL ON EXPOSURE 3, NORTH ELEVATION REMEDY: REPAIR AND/OR REPLACE #SR20102XN | DOB VIOLATION - ACTIVE |
| Aug 5, 2023 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT DUE TO VEHICLE IMPACT. AT TIME OF INSPECTION A VEHICLE IMPACTED SHED CAUSING A SHIFT IN SUPPORT POSTS AND BENDING. #23-02293 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00783 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00780 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00784 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00781 | DOB VIOLATION - ACTIVE |
| Jan 23, 2020 | FACADE SAFETY PROGRAM #HAZ88614 | DOB VIOLATION - ACTIVE |
| Jan 21, 2020 | FACADE SAFETY PROGRAM #HAZ88608 | DOB VIOLATION - ACTIVE |
| Jul 29, 2019 | FACADE SAFETY PROGRAM #HAZ88314 | DOB VIOLATION - ACTIVE |
| Jul 29, 2019 | FACADE SAFETY PROGRAM #HAZ88315 | DOB VIOLATION - ACTIVE |
| Apr 5, 2019 | NYCHA ELEV ANNUAL INSPECTION/TEST VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST #00078 | DOB VIOLATION - ACTIVE |
| Sep 15, 2017 | NYCHA ELEV ANNUAL INSPECTION/TEST VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST #00142 | DOB VIOLATION - ACTIVE |
| Dec 1, 2016 | NYCHA ELEV ANNUAL INSPECTION/TEST VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST #00058 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NYCHA ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00095 | DOB VIOLATION - ACTIVE |
| Dec 16, 2015 | FACADE SAFETY PROGRAM #HAZ75943 | DOB VIOLATION - ACTIVE |
| Dec 16, 2015 | FACADE SAFETY PROGRAM #HAZ85944 | DOB VIOLATION - ACTIVE |
| Jan 6, 1998 | LOCAL LAW 10/81 - ELEVATOR #01415 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01887 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01882 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01884 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01885 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01886 | DOB VIOLATION - ACTIVE |
| Mar 8, 1996 | LOCAL LAW 10/81 - ELEVATOR #01625 | DOB VIOLATION - ACTIVE |
| Mar 8, 1996 | LOCAL LAW 10/81 - ELEVATOR #01626 | DOB VIOLATION - ACTIVE |
| Mar 8, 1996 | LOCAL LAW 10/81 - ELEVATOR #01624 | DOB VIOLATION - ACTIVE |
| Apr 17, 1995 | LOCAL LAW 10/81 - ELEVATOR #02009 | DOB VIOLATION - ACTIVE |
| Apr 17, 1995 | LOCAL LAW 10/81 - ELEVATOR #02010 | DOB VIOLATION - ACTIVE |
| Apr 17, 1995 | LOCAL LAW 10/81 - ELEVATOR #02008 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #01537 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #01534 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #03358 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #01535 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #01533 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #03359 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #01536 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 2 #02191 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 1 #02192 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 2 #02190 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 2 #02193 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 2 #02194 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jan 23, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 21, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jul 29, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jul 29, 2019 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Dec 16, 2015 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Dec 16, 2015 | Facades FISP CYCLE 7A UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 28, 2006 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL, NORTH WALL, CEILING IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, CEILING IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL IN THE 2nd KITCHEN FROM EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Jul 28, 2006 | A | Apt 1B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 2nd KITCHEN FROM EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 16, 2006 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Closed |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 11:03 AM ET. BBL 2023040001.