Bronx · Block 3199 · Lot 24 · 10468

34 West Fordham Road

1 floors · 6,775 sq ft · built 1974 · class K5 · owner of record: Golden Arch Realty Corp

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1162dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1162 days
Next cycle year 2029

Open violations

ECB / OATH (5)
IssuedViolationHearingBalance
Feb 6, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, NO PERMITS, NO CERTIFICATE OF CORRECTION ON FILE, FAILURE TO CERTIFY
#39176399N
Apr 17, 2026
IN VIOLATION
$0
Jul 3, 2023Construction CLASS - 1
NOTED AT EXPO#3 REAR EXTERIOR WALL AT SW CORNER ADJACENT TO 2419 DAVIDSON AVE IS IN STATE OF DISREPAIR. THE SOUTH FACING CMU WALL HAS A VERTICAL STEP CRACK RUNNING ALONG ITS FULL HEIGHT WITH EVIDENCE OF SEPARAT
#39518697Z
Dec 24, 2024
IN VIOLATION
$0
Jun 2, 2018Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35329204X ISSUED 04/12/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1. NOTE: NO DOCUMENT FILE FOR FAILURE TO MAIN
#35338564L
Jul 20, 2018
DEFAULT
$0
Apr 12, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALL OR APPURTENANCES. NOTED: AT EXTERIOR WALL, AT CORNER OF THE BUILDING FACING TO THE REAR OF BUILDING 2419 DAVIDSON AVENUE, VERTICAL STEPS CRACKED MASONRY IN THE WALL HAS LENGTH
#35329204N
Sep 14, 2018
IN VIOLATION
$0
Feb 21, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALL OR APPURTENANCES.@ TIME OF INSPECTION NOTED RETAINING WALL WITH FULL LENGTH CRACK & BLOCK SEPARATING.REM:MAINTAIN EXTERIOR BUILDING WALL.
#35248775M
Apr 20, 2018
ADMIT/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 7:22 AM ET. BBL 2031990024.

Look up another building