Queens · Block 607 · Lot 43 · 11106

34-38 31 Street

1 floors · 2,000 sq ft · built 1935 · class E1 · owner of record: Lic Property Mgmnt

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
791dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 791 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Apr 15, 2023STRUCTURALLY COMPROMISED BUILDING
FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE
#00046
DOB VIOLATION - ACTIVE
Mar 29, 2023CONSTRUCTION
STRUCTURE RENDERED NO COMPLAINT .AT TIME OF INSPECTION OBSERVED PREMISES SUSTAINED FIRE AND WATER DAMAGE, WINDOW OUT. ROOF JOISTS HAVE EXCESSIVE FIRE DAMAGE, ROOF OPEN FOR ELEMENTS. VACATE ENTIRE BUILDING.
#23-00856
DOB VIOLATION - ACTIVE
Mar 29, 2023CONSTRUCTION
AT TIME OF INSPECTION OBSERVED ROOF JOIST HAVE EXCESSIVE FIRE DAMAGE AND ROOF OPEN FOR ELEMENTS.
#23-00857
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Apr 15, 2023Structurally Compromised Buildings FTF-SC-INITL
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 10:37 PM ET. BBL 4006070043.

Look up another building