1 floors · 5,000 sq ft · built 1922 · class F5 · owner of record: 34-29 37 Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-08-10 (Accepted). Agency page | Dec 31, 2026 in 64 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 19, 2026 | Construction CLASS - 1 @PERMITTED 8STORY NB SITE IN EXCAVATION PHASE OBSERVE EARTHWORK PERFORMED WITH EXCAVATION SUPPORT PILES OVER APPROX. 30' IN DEPTH DRILLED ALONG EXP#1&I CONFIRMED PER DEPARTMENTS RECORDS (DOB NOW) THE REQUIRED P #39558141J | Oct 27, 2026 PENDING | $2,500 |
| Jan 23, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OF A COMPLETED DEMO SITE OBSERVED EXPOSED FOUNDATION AND WALL OF ADJOINING PROPERTY AT EXP2 & 4. WALL AND FOUNDATION FILLED WITH VOIDS. ADJOINING PROPERTIES NOT WEATHERPROOFED AS REQUIRED #39549441R | Mar 31, 2026 DEFAULT | $10,000 |
| Jun 30, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. NOTED: PERMIT# Q00568550-S1-FN FOR TEMP CONSTRUCTION FENCE EXPIRED ON 6/7/2025., RENEW PERMIT #39152392Y | Oct 14, 2025 ADMIT/IN-VIO | $0 |
| Jun 30, 2025 | Construction CLASS - 2 FAILURE TO SIGN OFF ON PERMITTED WORK WITH THE DEPT. NOTED: JOB# 421808351 PERMITTED ON 4/7/2025 AND EXPIRED ON 6/7/2025 AHS NOT BEEN SIGNED OFF., CONDUCT/FILE FINAL INSPECTION #39152393X | Oct 14, 2025 ADMIT/IN-VIO | $0 |
| May 14, 2025 | Construction CLASS - 1 MECHANICAL DEMO EQUIPMENT PERMIT@1STORY FULL DEMO SITE GC#621030 OBSERVE MECH DEMO EQUIPMENT EXCAVATOR+SKIDSTEER ON 1ST FL W/CELLAR BELOW&NO EQUIPMENT PERMIT IN DOB RECORD&CONTRARY TO DEMOLITION JOBS FILING/PW1 #39540212M | Jul 28, 2026 IN VIOLATION | $5,000 |
| Oct 24, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION OF A 1 STORY WITH CELLAR UNDER DEMO OPERATIONS, I REQUESTED TO SEE THE PRE-CONSTRUCTION SITE SAFETY, NONE WAS PROVIDED. IT CLEARLY STATED ON THE DRAWINGS THAT PRE-CONSTRUCTION AS WELL AS M #39522832Y | May 14, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #16081 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #14719 | DOB VIOLATION - ACTIVE |
| Jul 10, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00102 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #42625 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #23058 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #15174 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jul 10, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 19, 2026 | ECB | Construction: @PERMITTED 8STORY NB SITE IN EXCAVATION PHASE OBSERVE EARTHWORK PERFORMED WITH EXCAVATION SUPPORT PILES OVER APPROX. 30' IN DEPTH DRILLED ALONG EXP#1&I CONFIRMED PER DEPARTMENTS RECORDS (DOB NOW) THE REQUIRED P | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 5:20 PM ET. BBL 4006450015.