1 floors · 36,900 sq ft · built 1931 · class Y6 · owner of record: Nyc Department Of Sanitation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-16 (Accepted). Agency page | Dec 31, 2026 in 51 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 36,900 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 782 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 11, 2022 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED EXTERIOR BRICK WALL INSTATE OF DISREPAIR CONDITIONS INCLUDES HORIZONTAL, VERTICAL AND STEP CRACKS AT ALL EXPOSURES. ALSO OBSERVED EXPO # 04 FACADE WALL NOT LEVELLED., REPAIR AND/O #39060019H | Apr 19, 2022 POP/IN-VIO | $0 |
| Mar 9, 2018 | Boilers CLASS - 2 36,32A. B254-36 FOUND HB SMITH GAS FIRED BOILER NOT REGISTERED. REGISTER THE BOILER CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION. #32093316K | May 29, 2018 POP/IN-VIO | $0 |
| Mar 9, 2018 | Boilers CLASS - 2 36,32A. B254-36 FOUND HB SMITH GAS FIRED BOILER NOT REGISTERED. REGISTER THE BOILER CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION. #32093317M | May 29, 2018 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 17, 2020 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #03139 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 17, 2020 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 6:17 AM ET. BBL 4005230012.