6 floors · 33 apartments · 46,716 sq ft · built 1908 · class D7 · owner of record: 138 Broadway Associates, L.L.C.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,716 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-26 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 10, 2018 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE EXPIRED PERMIT.NOTED:AT TIME OF INSPECTION PERMIT FOR THE SIDEWALK SHED EXPIRED ON 07/03/18.RECURRING CONDITION.PREVIOUS SUMMS#3513304Y ISSUED ON 07/03/18.RECURRING COND #35324405R | Aug 30, 2018 STIPULATION/IN-VIO | $630 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 29, 2019 | B | Apt 44 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... WEST WALL AND CEILING IN CLOSET ( APPROX. 12 SQ. FT ) IN THE PRIVATE HALLWAY LOCATED AT APT 44, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 3, 2019 |
| Jul 31, 2019 | A | Apt 31 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PAINT AND REGLAZED THE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 31, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 3, 2019 |
| Jul 31, 2019 | A | Apt 31 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BASEBOARD AT NORTH WALL, NORTH WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 2nd PRIVATE HALLWAY LOCATED AT APT 31, 3rd STORY, 1st APARTMENT FROM NORTH AT | Nov 3, 2019 |
| Jul 31, 2019 | A | Apt 31 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 31, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 3, 2019 |
| Jul 31, 2019 | A | Apt 31 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE KITCHEN , THE 2nd ROOM FROM EAST AT SOUTH, THE 1st PRIVATE HALLWAY , THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 31, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 3, 2019 |
| Jul 31, 2019 | A | Apt 31 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 31, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 3, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 12:22 PM ET. BBL 1020860036.