| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 58 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-12-23 (Accepted). Agency page | Dec 31, 2026 in 58 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 27, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN ON 9027-18 I VISITED 339 W 29 T, A 4 STORY OCCUPIED M./P LANDMARKED BUILDING. RECENTLY, FOR DEPARTEMNT'S ORDER OWNER REMOVED UNSAFE VERTICAL ANDHORIZONTAL ENLARGEMENT. THE FACADE OF THE #35361900R | Jan 17, 2019 IN VIOLATION | $0 |
| May 6, 2016 | Construction CLASS - 2 SEC: 28-105.12.3. ADHERENCE TO LOT DIAGRAM, MANDATES THAT ALL WORK SHALL BE STRICTLY LOCATED IN ACCORDANCE W/ THE LOT DIAGRAM APPROVED IN ACCORDANCE W/ THIS CODE & NO LOT OR PLOT SHALL BE CHANGED, INCREASED OR #35155144N | Oct 21, 2016 IN VIOLATION | $0 |
| May 6, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN THE BLDG IN A CODE COMPLIANT CONDITION. THE BLDG IS INCOMPLETE, UNENCLOSED, UNSAFE W/ UNVERIFIED & UNDOCUMENTED FRAMING THAT IS NOT CODE COMPLIANT. THE BLDG HAS NOT BEEN ACTIVELY MAINTAINED #35155143L | Oct 21, 2016 IN VIOLATION | $0 |
| May 6, 2016 | Construction CLASS - 1 SCOPE SCAFFOLDS "SHALL BE ERECTED & MAINTAINED SO THAT THE SAFETY OF THE PUBLIC & PROPERTY WILL NOT BE ENDANGERED". THE SCAFFOLDING ERECTED @ THE FRONT & REAR OF THE BLDG IS IN POOR CONDITION & HAS NOT BEEN MAI #35155146R | Oct 20, 2016 IN VIOLATION | $0 |
| Jan 13, 2014 | Construction CLASS - 2 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. NOTED: AT TIME OF INSPECTIONS. NOTED: AT TIME OF INSPECTION, SIDEWALK SHED W/APPROX 60'HIGHSUPPORTED SCAFFOLD ON TOP ERECTED AT EXP 1. SIDEWALK SHED DOES NOT #35031668J | Feb 27, 2014 IN VIOLATION | $0 |
| Nov 19, 2012 | Boilers CLASS - 2 B254,32A,36,50,50A,50B,50C,50D,50E,50F,50G,50H. 36-WEILMCCLAIN BOILER ON SITE UNREGISTERED, HB SMITH BOILER IN DOB RECORDS UNDER MD28025-01;50-MXING VALVE LEAKING AND TEMPERATURE GUAGE MISSING;50A-SPILL SWITCH #32072522Z | Jan 3, 2013 STIPULATION/IN-VIO | $0 |
| Jan 31, 2011 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER. NOTED THE FOLLOWING CONDITIONS: WORKERS IN CELLAR FRONT FRAMING WALLS & CEILING WHILE A STOP WORK ORDER EXIST ON THIS SITE: TENANT SAFETY WORK WAS #34879602Z | May 12, 2011 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #03250 | DOB VIOLATION - ACTIVE |
| Jun 28, 2019 | CONSTRUCTION SUBMITTAL OF CONSTRUCTION DRAWINGS:LANDMARK BUILDING UNDER STRUCTURAL MONITORING.ON 3-20-19 ALT# 123544334 WAS PERMITTED FOR CONSTRUCTION HOWEVER WORK WAS NOT COMMENCED ON THIS STRUCTURALLY DEFICIENT FACADE DUE TO ORGANIZATION OF DOB/LPC PERMITTED DRAWINGS.BY 7/3/19,PROVIDE DOB/LPC WITH CORRECTED DR #FEU10401TDL | DOB VIOLATION - ACTIVE |
| Jan 9, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00312 | DOB VIOLATION - ACTIVE |
| Sep 26, 2018 | CONSTRUCTION FAIL TO COMP W/COMM ORDER.ON 9/27/18 VISIT SITE TO REVIEW PROGRESS ON RPRS TO UNSAFE BLDG THAT WAS PART STAB BY OWN TO MAKE SAFE NON COMP VERT&HORIZ ADDITION.NO FACADE RPRS UNDERTAKEN&FACADE REMAIN UNSAFE, DESPITE OWNER ASSURANCE THAT RPRS WILL BE OCCUP.REMEDY:UNDERTAKEN TO MULT DWLG&NO DRG FILED.CO #FEU104TDL01 | DOB VIOLATION - ACTIVE |
| May 12, 2017 | CONSTRUCTION 339 W 29TH ST IS A 5 STRY MASONRY BLDG UND ALT THAT IS HALTED&BLDG IS UNSAFE.THERE ARE 2 OCCUPIED APTS.BLDG WILL BE SHORED&REPAIR WORK UNDER TAKEN.CURRENTLY BLDG HAS TO BE STRL MONITORED DAILY.REMEDY:PROV STRL ENG'R OBSERVATIONS&REPORT DAILY,NOTING ALL FOOTERS,5THFL,ROOF,WALLS, STRL STAB #FEU10401TDL | DOB VIOLATION - ACTIVE |
| Aug 10, 2016 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00047 | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10402MM,CONTROL NO. 327897 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16. AS OF 6/2/16 NO INFORMATION WAS RECEIVED REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 #FEU10402MM | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER.COMMISSIONERS ORDER CONTROL NO. 327896 REQUIRES OWNER TO SUBMIT STRUCTURAL DRAWINGS TO DOB FORENSIC ENGINEERING BY 5/26/16. AS OF 6/2/16 NO INFORMATION WAS RECEIVED. REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT DRAWINGS NO LATER THAN 6/17/16 #FEU10401MM | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WOTH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10403MM, CONTROL NO. 327898 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16 AS OF 6/2/16 NO INFORMATION WAS RECEIVED REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 #FEU10403MM | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10404MM, CONTROL NO. 327899 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16 AS OF 6/2/16 NO INFORMATION WAS RECEIVED REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 #FEU10404MM | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10405MM, CONTROL NO. 327900 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16. NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 #FEU10405MM | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10406MM, CONTROL NO. 327976 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16. NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY:IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 #FEU10406MM | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10407MM, CONTROL#327977 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16.NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 #FEU10407MM | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10408MM, CONTROL NO. 327978 REQUIRES THE OWNER TO SUBMIT INFORMATION BY 5/26/16 NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 #FEU10408MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION POST INSTALLED ANCHORS SECTION 1704.32 REQUIRES SPEIAL INSPECTION FOR THE INSTALLATION OF POST-INSTALLED MECHANICAL,ADHESIVE & SCREW ANCHORS THE BLDG HAS A NEW BULKHEAD STRUCTURE INSTALLEDON TOP PF THE EXISTING PARAPET.REMEDY:PROVIDE DOB W/ALL TRI-PICTURES AND REPORTS FOR 1704.32 POST INSTALLED ANCH #FEU10404MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION THE DOB CAN REQUEST ADDT'L INFORMATION PER 28-104.7.1 THE ENTIRE EXTENT OF WORK IS TO BE SHOWN ON CONSTRUCTION DWGS.THE BLDG HAS BEEN SUBSTANTIALLY ALTERED ON THAT AN ADDT'I FLR WAS ADDED ON TOP OF THE EXISTING STRUCTURE.THE DWGS SUBMITTED UNDER JOB#10307337.REMEDY:IMMED PROVIDE THE PRE-PERMIT STRUC #FEU10402MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION THE DOB REQUEST ADDT'L INFORMATIONPER 28-104.701 THE ENTIRE EXTENT OF WORK IS TO BE SHOWN ON THE CONSTRUCTION DWGS.PROVIDE STRUCTURAL ENG'R DWGS TO THE DEPT OF BLDGS TO REFLECT THE ADDT'L WORK DONE UNDER JOB # 103907337.REMEDY:BY 5/26/16 SUBMIT STRUCTURAL DWGS FOR THE BLDG TO MATT MILNER,PE,DOB FORE #FEU10401MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION #FEU10104MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION SUPPORT OF PARTY WALL SECTION 3309.4.0 NOTES THAT ITS THE OWNERS RESPONSIBILITY TO PROTECT PARTY WALLS DURING EXCAVATION & SUPPORT THEM W/PROPER FOUNDATIONS.THE WALLS ARE TO REMAIN PRACTICALLY AS SAFE AS IT WAS BEFORE THE EXCAVATION WAS COMMENCED. REMEDY:PROVIDE TECHNICAL REPORT DETALING THE STRUCTU #FEU10405MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION FM BLDG.ANALYSIS REQUIRMENTS ARE DEFINED IN 1604.4 NO DETAILS ARE SHOWN ON THE DWGS SUBMITTED UNDER JOB#10307337 REGARDING THE REMOVAL & INSTALLATION OF STEEL BEAMS IN THE BSMT FRAMING.THE FRONT OF THE BSMT FRAMING WAS REMOVED & REPLACED WITH +/-15FT LONG BY 4' DEEP STEEL BEAM REMEDY:SUBMIT INFORMAT #FEU10406MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION PER 28-104.7.11 DOB CAN REQUEST ADDT'L INFORMATION. THE ENTIRE EXTENT OF WORK IS TO BE SHOWN ON THE CONSTRUCTION DWGS.THE BLDG HAS BEEN SUBSTANIALLY ALTERED IN THAT AN ADDT'L FLR WAS ADDED ON TOP OF EXISTING STRUCTURE.NO DETAILS ARE SHOWN ON THE DGWS.REMEDY:SUBMIT INFORMATION TO DOB FEU NY 5/26/16 I #FEU10407MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION THE BLDG WAS ALTERED UNDER JOB#10390733.THE LOAD PATH OF THE BLDG WAS SIGNIFICANTLY ALTERED RESULTING IN MORE THAN 5% INCREASE IN THE LOAD ON THE EXISTING FOUNDATIONS.PURSUANT TO 1802.0 A GEOTECHNICAL REPORT IS REQUIRED TO DETERMAINE THAT THE FOUNDATIONS ARE SUFFICICENT.REMEDY: SUBMIT THE INFORMATIO #FEU10408MM | DOB VIOLATION - ACTIVE |
| May 6, 2016 | CONSTRUCTION SECTION 1704.20.2 REQUIRES SPECIAL INSPECTION FOR METHODS EMPLOYED TO PROTECT THE SIDES OF EXCAVATIONS.THE CELLAR OF THE BLDG WAS LOWERED AND REPLACED REQUIRING EXCAVATION,PROTECTION AND SPECIAL INSPECTIONS REMEDY:PROVIDE THE DOB W/ALL TRI-PICTURES & REPORTS FOR 1704.20.2 EXCAVATIONS SUBMIT INFORMAT #FEU10403MM | DOB VIOLATION - ACTIVE |
| Oct 21, 2008 | CONSTRUCTION #ER01LC | DOB VIOLATION - ACTIVE |
| Oct 19, 2007 | CONSTRUCTION #0404VP | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Jan 9, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 10, 2016 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Jan 9, 2026 | B | Apt 2S · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WASH BASIN COUNTERTOP AND VANITY IN THE BATHROOM LOCATED AT APT 2S, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 13, 2026 |
| Jan 9, 2026 | B | Apt 2S · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 2S, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 13, 2026 |
| Jan 9, 2026 | B | Apt 2S · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CABINETS AT EAST WALL AND WEST WALL IN THE KITCHEN LOCATED AT APT 2S, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 13, 2026 |
| Sep 13, 2024 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LIDS AT GARBAGE CANS AT FRONT AREA WAY | Oct 18, 2024 |
| Aug 29, 2024 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Oct 3, 2024 |
| Aug 29, 2024 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING FRAME AT PUBLIC HALL, 1st STORY | Dec 2, 2024 |
| Jan 23, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AND FRAME AT BUILDING FRONT ENTRANCE AT BASEMENT | Feb 6, 2024 |
| Jan 23, 2024 | A | § 27-2005 HMC: REFIT DOOR AT BUILDING FRONT ENTRANCE AT BASEMENT | Apr 27, 2024 |
| Mar 20, 2023 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Mar 26, 2023 |
| Mar 20, 2023 | C | Apt GN · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT GN, 1st APARTMENT FROM WEST AT NORTH | Apr 15, 2023 |
| Mar 20, 2023 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL | Jun 23, 2023 |
| Mar 20, 2023 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL | Mar 26, 2023 |
| Mar 20, 2023 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL | Jun 23, 2023 |
| Mar 20, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE SOUTH WALL BASEMENT LEVEL | Apr 24, 2023 |
| Mar 20, 2023 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND THE CEILING AT BASEMENT LEVEL | Jun 23, 2023 |
| Mar 20, 2023 | C | Apt GN · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT GN, 1st APARTMENT FROM WEST AT NORTH | Apr 15, 2023 |
| Apr 21, 2022 | C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING DROP LADDER AT FIRE ESCAPE AT SOUTH | Apr 27, 2022 |
| Jul 27, 2021 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT BASEMENT | Aug 22, 2021 |
| Oct 5, 2015 | B | Apt GN · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT GN, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 9, 2015 |
| Mar 1, 2010 | B | SECTION 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. AT FRONT AREAWAY | Apr 5, 2010 |
| Aug 10, 2009 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING CONCRETE AT NORTH COURT YARD | Sep 14, 2009 |
| Jun 23, 2009 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FIRE RETARDENT CEILLING AT PUBLIC HALL, 2nd STORY | Jul 28, 2009 |
| Jun 23, 2009 | B | Apt 2S · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 28, 2009 |
| Jun 23, 2009 | A | Apt 2S · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 26, 2009 |
| Aug 28, 2007 | C | Apt 2N · SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK 2 STY NORTH APT 2N. , SECTION '' '' | Sep 3, 2007 |