Manhattan · Block 451 · Lot 42 · 10003

339 East 9 Street

5 floors · 23 apartments · 7,700 sq ft · built 1900 · class C1 · owner of record: High Nine

19open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
45dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 45 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 45 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 61 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 289 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 776 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-16 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5)
IssuedViolationHearingBalance
Nov 19, 2025Construction CLASS - 2
CERTIFICATE OF CORRECTION NOT OBTAINED FOR CLASS 1 FAILURE TO PROVIDE UNOBSTRUCTED PASSAGEWAY VIOLATION #39148883R ISSUED 5/23/2025 FOR BLOCKING EAST REAR GATE WITH ERECTED ENCLOSED STRUCTURE. ALTHOUGH OBSTRUCT
#39167545H
Jan 29, 2026
IN VIOLATION
$0
Nov 19, 2025Construction CLASS - 1
CERTIFICATE OF CORRECTION NOT OBTAINED FOR CLASS 1 WORK WITH OUT PERMIT VIOLATION #39148874P ISSUED 5/23/2025 FOR TEMPORARY WOODEN STRUCTURE ERECTED AT REAR YARD. HOWEVER, THE TEMPORARY WOODEN STRUCTURE HAS NOW
#39167540Z
Jan 29, 2026
IN VIOLATION
$0
Nov 19, 2025Construction CLASS - 2
AT TIME OF INSPECTION, I OBSERVED ERECTED ENCLOSED STRUCTURE REMOVED WITHOUT A PERMIT ON FILE WITH THE DEPARTMENT OF BUILDINGS., OBTAIN ALL PERMITS
#39167777R
Jan 29, 2026
IN VIOLATION
$0
May 23, 2025Construction CLASS - 1
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED WOOD STRUCTURE ERECTED AND FULLY ENCLOSED IN REAR YARD APPROX 25'-0" WIDE X 42'-0" LENGTH X 8'-0" HEIGHT, STRUCTURE IS OCCUPYING 95% OF REAR YARD FOOTPRINT
#39148883R
Jul 31, 2025
IN VIOLATION
$0
May 23, 2025Construction CLASS - 1
WORK WITHOUT A PERMIT. NOTED WOOD STRUCTURE ERECTED AND FULLY ENCLOSED IN REAR YARD APPROX 25'-0" WIDE X 42'-0" LENGTH X 8'-0" HEIGHT, STRUCTURE IS OCCUPYING 95% OF REAR YARD FOOTPRINT., OBTAIN PERMIT
#39148874P
Jul 31, 2025
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
HPD (13) · C 2 · B 9 · A 2
IssuedClassViolationCorrect by
Nov 20, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 2nd STORYDec 25, 2025
Nov 20, 2025A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL AT PUBLIC HALL, 2nd STORYFeb 23, 2026
Oct 21, 2025CApt 5A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 4, 2025
Oct 21, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT DOOR LEADING TO CELLAR AT BASEMENTNov 4, 2025
Mar 2, 2015BApt 5B · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EASTApr 6, 2015
Mar 2, 2015BApt 5B · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EASTApr 6, 2015
Jun 26, 2008BApt 2ND · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR KNOB AND ASSEMBLY OF ENTRANCE DOOR TO APT 2ND STY APT 1B. , SECTION '' ''Jul 31, 2008
Jun 26, 2008BApt 1B · D26-16.01 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASHBASIN 2ND STY APT 1B BATHROOM. LOCATED AT APT 1BJul 31, 2008
Jul 28, 2006ASECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WOOD PANELING INSTALLED ON WALLS IN VESTIBULE & BASEMENT STY.Nov 12, 2006
Sep 22, 1998BApt 2D · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BALANCE LOWER SASH EAST AND WEST WINDOWS SOUTH ROOM 2 STY SOUTHWEST APT 2D. , SECTION '' ''Nov 9, 1998
Sep 22, 1998BApt 2D · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL CEILING LIGHT FIXTURE KITCHEN 2 STY SOUTHWEST APT 2D. , SECTION '' ''Nov 9, 1998
Sep 22, 1998BApt 2D · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WATER DAMAGED CEILINGS KITCHEN AND BATHROOM 2 STY SOUTHWEST APT 2D. , SECTION '' ''Nov 9, 1998
Oct 16, 1990BSECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE FRONT EAST GUARD RAIL ON ROOF.Dec 3, 1990

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 16, 2026, 3:21 AM ET. BBL 1004510042.

Look up another building