2 floors · 6,096 sq ft · built 1930 · class F5 · owner of record: 340 M&F Management Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 9, 2026 | Construction CLASS - 1 ATOI OBSERVED GREEN TARP NOT PROPERLY SECURED TO EXPO 1. TARP IS LOOSE AND FLAPPING WITH WIND. FAILURE TO MAINTAIN., REPAIR AND/REPLACE #39203490P | Dec 9, 2026 PENDING | $2,500 |
| Sep 9, 2026 | Construction CLASS - 1 OBSERVED AN UNPERMITTED/UNDOCUMENTED ADDED FLOOR TO A 2 STORY MIXED USE BUILDING. CREATING A 3RD FLOOR. ADDITIONAL FLOOR IS CONSTRUCTED OF WOOD AND STEEL FRAMING. CONSTRUCTION IS APPROX 30% COMPLETE., OBTAIN PE #39203489H | Dec 9, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 9, 2026 | CONSTRUCTION UNPERMITTED/UNDOCUMENTCONSTUCTION WORK .CREATING AN ADDITONAL FLOOR ON ROOF OF A 2-STORY BLDG, CONVERTING INTO 3-STORY . STRUCTURAL STABILITY OF BUILDING WITH NO STRUCTURAL DETAIL/DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS REPORT FOR STRUCTURAL STABILITY REQUIRED WITHIN 5 DAYS. #26-02171 | DOB VIOLATION - ACTIVE |
| Nov 14, 2000 | CONSTRUCTION #03HD01 | DOB VIOLATION - ACTIVE |
| Nov 14, 2000 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: FULL PARTITIONS ERECTED AT 2ND STORY CREATING ROOMS, WITH LIVING ROOM, BEDROOMS, BATHROOM AND KITCHEN SPACE WITH GAS STOVE REMEDY: OBTAIN A PERMIT #03HD02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB | CONSTRUCTION: UNPERMITTED/UNDOCUMENTCONSTUCTION WORK .CREATING AN ADDITONAL FLOOR ON ROOF OF A 2-STORY BLDG, CONVERTING INTO 3-STORY . STRUCTURAL STABILITY OF BUILDING WITH NO STRUCTURAL DETAIL/DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS REPORT FOR STRUCTURAL STABILITY REQUIRED WITHIN 5 DAYS. | Open |
| Sep 9, 2026 | ECB | Construction: ATOI OBSERVED GREEN TARP NOT PROPERLY SECURED TO EXPO 1. TARP IS LOOSE AND FLAPPING WITH WIND. FAILURE TO MAINTAIN., REPAIR AND/REPLACE | Open |
| Sep 9, 2026 | ECB | Construction: OBSERVED AN UNPERMITTED/UNDOCUMENTED ADDED FLOOR TO A 2 STORY MIXED USE BUILDING. CREATING A 3RD FLOOR. ADDITIONAL FLOOR IS CONSTRUCTED OF WOOD AND STEEL FRAMING. CONSTRUCTION IS APPROX 30% COMPLETE., OBTAIN PE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 9:26 PM ET. BBL 3018810033.