Brooklyn · Block 1881 · Lot 33 · 11205

338 Flushing Avenue

2 floors · 6,096 sq ft · built 1930 · class F5 · owner of record: 340 M&F Management Llc

5open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
800dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 800 days
Next cycle year 2028

Open violations

ECB / OATH (2) · $5,000 owed
IssuedViolationHearingBalance
Sep 9, 2026Construction CLASS - 1
ATOI OBSERVED GREEN TARP NOT PROPERLY SECURED TO EXPO 1. TARP IS LOOSE AND FLAPPING WITH WIND. FAILURE TO MAINTAIN., REPAIR AND/REPLACE
#39203490P
Dec 9, 2026
PENDING
$2,500
Sep 9, 2026Construction CLASS - 1
OBSERVED AN UNPERMITTED/UNDOCUMENTED ADDED FLOOR TO A 2 STORY MIXED USE BUILDING. CREATING A 3RD FLOOR. ADDITIONAL FLOOR IS CONSTRUCTED OF WOOD AND STEEL FRAMING. CONSTRUCTION IS APPROX 30% COMPLETE., OBTAIN PE
#39203489H
Dec 9, 2026
PENDING
$2,500
DOB (3)
IssuedViolationStatus
Sep 9, 2026CONSTRUCTION
UNPERMITTED/UNDOCUMENTCONSTUCTION WORK .CREATING AN ADDITONAL FLOOR ON ROOF OF A 2-STORY BLDG, CONVERTING INTO 3-STORY . STRUCTURAL STABILITY OF BUILDING WITH NO STRUCTURAL DETAIL/DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS REPORT FOR STRUCTURAL STABILITY REQUIRED WITHIN 5 DAYS.
#26-02171
DOB VIOLATION - ACTIVE
Nov 14, 2000CONSTRUCTION

#03HD01
DOB VIOLATION - ACTIVE
Nov 14, 2000CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: FULL PARTITIONS ERECTED AT 2ND STORY CREATING ROOMS, WITH LIVING ROOM, BEDROOMS, BATHROOM AND KITCHEN SPACE WITH GAS STOVE REMEDY: OBTAIN A PERMIT
#03HD02
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 9, 2026DOBCONSTRUCTION: UNPERMITTED/UNDOCUMENTCONSTUCTION WORK .CREATING AN ADDITONAL FLOOR ON ROOF OF A 2-STORY BLDG, CONVERTING INTO 3-STORY . STRUCTURAL STABILITY OF BUILDING WITH NO STRUCTURAL DETAIL/DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS REPORT FOR STRUCTURAL STABILITY REQUIRED WITHIN 5 DAYS.Open
Sep 9, 2026ECBConstruction: ATOI OBSERVED GREEN TARP NOT PROPERLY SECURED TO EXPO 1. TARP IS LOOSE AND FLAPPING WITH WIND. FAILURE TO MAINTAIN., REPAIR AND/REPLACEOpen
Sep 9, 2026ECBConstruction: OBSERVED AN UNPERMITTED/UNDOCUMENTED ADDED FLOOR TO A 2 STORY MIXED USE BUILDING. CREATING A 3RD FLOOR. ADDITIONAL FLOOR IS CONSTRUCTED OF WOOD AND STEEL FRAMING. CONSTRUCTION IS APPROX 30% COMPLETE., OBTAIN PEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 9:26 PM ET. BBL 3018810033.

Look up another building