Bronx · Block 4743 · Lot 5 · 10469

3377 Eastchester Road

1 floors · 3,339 sq ft · built 2012 · class K1 · owner of record: Lio Capitol Partners Llc

12open violations
$41,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
415dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 415 days
Next cycle year 2027

Open violations

ECB / OATH (12) · $41,000 owed
IssuedViolationHearingBalance
Oct 8, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION, I OBSERVED A WORKER PERFORMING ELEVATED WORK FROM AN A-FRAME LADDER WITHOUT MAINTAINING 3 POINTS OF CONTACT, CREATING AN UNSAFE CONDITION AND SERIOUS FALL HAZARD, POSING RISK OF SEVER
#39560353Y
Dec 18, 2026
PENDING
$12,500
Oct 7, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION OF A 5-STORY BUILDING, ACTIVE SITE I OBSERVED ON ROADWAY THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3 THE BARRIERS WERE NOT PROPERLY FILLED WITH WATE
#39560311X
Dec 18, 2026
PENDING
$2,500
Oct 7, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION OF 5-STORY NEW BUILDING AT ROOF LEVEL, I OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT JOBSITE DEBRIS LEFT ON FLOORS AND SCATTERED, CREATING A HAZARDOUS CONDITION FOR WORKERS AND FIRST R
#39560308P
Dec 18, 2026
PENDING
$2,500
Oct 7, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION OF THE ACTIVE CONSTRUCTION SITE OF A 5-STORY NEW BUILDING, A WORKER PERFORMING ELEVATED WORK WAS OBSERVED STANDING ON A CLOSED A-FRAME LADDER LEANED AGAINST SHEETROCK WALL, INSTEAD OF
#39560309R
Dec 18, 2026
PENDING
$2,500
Oct 7, 2026Construction CLASS - 1
DURING INSPECTION OF A 5-STORY NEW BUILDING AT ROOF, I OBSERVED A WORKER WAS USING A BATTERY-POWERED GRINDER TO CUTTING OVERHEAD CONTRARY TO THE MANUFACTURER'S SPECIFICATIONS. THE GRINDER WAS MISSING THE REQUIR
#39560310Y
Dec 18, 2026
PENDING
$2,500
Sep 12, 2026Unknown CLASS - 2
WHILE PERFORMING A WEEKEND COMPLIANCE INSPECTION OF A CLOSED SITE. I OBSERVED THAT THE EXTERIOR PERIMETER WORK & STORAGE ZONE AT EXPOSURES 1 AND 4 WERE NOT MAINTAINED- BC 3307.4.4 / 3307.4.7. AREAS OPEN TO PERS
#39559121R
Nov 20, 2026
PENDING
$2,500
Sep 12, 2026Construction CLASS - 2
DURING MY INSPECTION OF A CLOSED 5-STORY NB. I OBSERVED MULTIPLE OUTWARD-FACING EDGES AND LOOSE, BROKEN PLYWOOD PANELS AT VARIOUS LOCATIONS ALONG THE FENCE PERIMETER. STOP ALL GROUND-LEVEL OPERATIONS AND MAINTA
#39559120P
Nov 20, 2026
PENDING
$1,000
Sep 12, 2026Unknown CLASS - 2
WHILE CONDUCTING A WEEKEND COMPLIANCE INSPECTION AT A NEW FIVE-STORY STRUCTURE. I FOUND NO QUALIFIED WATCH PERSON ON SITE, AS REQUIRED BY CODE BC3303.3, FOR A BUILDING FOOTPRINT OF 7,653 SQ. FT., WITH NO ACTIVE
#39559110L
Nov 20, 2026
PENDING
$2,500
Sep 12, 2026Construction CLASS - 2
DURING MY INSPECTION OF A CLOSED SITE, 5-STORY NB. NO WORKERS ON SITE. I OBSERVED THAT THE SITE WAS UNENCLOSED AND OPEN TO THE PUBLIC. EXPOSURES: 1 GATE WAS UNCHAINED, AND EXPOSURE 4 DOOR WAS UNLOCKED. THIS CON
#39559122Z
Nov 20, 2026
PENDING
$5,000
Sep 12, 2026Construction CLASS - 2
WHILE CONDUCTING A WEEKEND COMPLIANCE INSPECTION OF A CLOSED 5-STORY NB. I OBSERVED AT THE INTERIOR PERIMETER AND AT THE EXTERIOR FENCE AT GROUND LEVEL. SCATTERED DEBRIS /MIXED TRASH AND DISORGANIZED MATERIALS.
#39559119H
Nov 20, 2026
PENDING
$1,250
Aug 20, 2026Construction CLASS - 2
THE R-VALUE OF THE INSTALLED FOUNDATION WALLS OUTBOARD INSULATION IS R-VALUE 10 WITH THICKNESS 2" CONTRARY WITH THE APPROVED DOB EN DRAWING AND ARCHITECTURAL DRAWING THAT INDICATE R-VALUE 11 WITH THICKNESS 2.25
#39201196P
Jan 8, 2027
PENDING
$1,250
Jul 3, 2026Construction CLASS - 2
DURING MY INSPECTION OF AN ACTIVE JOB SITE WITH ONGOING EARTHWORK IN PROGRESS. I OBSERVED THE EXISTING ADJACENT PROPERTY AT EXPOSURE: 3 REAR DOOR OBSTRUCTED AND THE CONSTRUCTION FENCE MISSING. THIS CONSTITUTES
#39556175Z
Mar 5, 2027
PENDING
$5,000
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 8, 2026ECBConstruction: AT THE TIME OF INSPECTION, I OBSERVED A WORKER PERFORMING ELEVATED WORK FROM AN A-FRAME LADDER WITHOUT MAINTAINING 3 POINTS OF CONTACT, CREATING AN UNSAFE CONDITION AND SERIOUS FALL HAZARD, POSING RISK OF SEVEROpen
Oct 7, 2026ECBConstruction: AT THE TIME OF INSPECTION OF A 5-STORY BUILDING, ACTIVE SITE I OBSERVED ON ROADWAY THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3 THE BARRIERS WERE NOT PROPERLY FILLED WITH WATEOpen
Oct 7, 2026ECBConstruction: AT THE TIME OF INSPECTION OF 5-STORY NEW BUILDING AT ROOF LEVEL, I OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT JOBSITE DEBRIS LEFT ON FLOORS AND SCATTERED, CREATING A HAZARDOUS CONDITION FOR WORKERS AND FIRST ROpen
Oct 7, 2026ECBConstruction: AT THE TIME OF INSPECTION OF THE ACTIVE CONSTRUCTION SITE OF A 5-STORY NEW BUILDING, A WORKER PERFORMING ELEVATED WORK WAS OBSERVED STANDING ON A CLOSED A-FRAME LADDER LEANED AGAINST SHEETROCK WALL, INSTEAD OFOpen
Oct 7, 2026ECBConstruction: DURING INSPECTION OF A 5-STORY NEW BUILDING AT ROOF, I OBSERVED A WORKER WAS USING A BATTERY-POWERED GRINDER TO CUTTING OVERHEAD CONTRARY TO THE MANUFACTURER'S SPECIFICATIONS. THE GRINDER WAS MISSING THE REQUIROpen
Sep 12, 2026ECBUnknown: WHILE PERFORMING A WEEKEND COMPLIANCE INSPECTION OF A CLOSED SITE. I OBSERVED THAT THE EXTERIOR PERIMETER WORK & STORAGE ZONE AT EXPOSURES 1 AND 4 WERE NOT MAINTAINED- BC 3307.4.4 / 3307.4.7. AREAS OPEN TO PERSOpen
Sep 12, 2026ECBConstruction: DURING MY INSPECTION OF A CLOSED 5-STORY NB. I OBSERVED MULTIPLE OUTWARD-FACING EDGES AND LOOSE, BROKEN PLYWOOD PANELS AT VARIOUS LOCATIONS ALONG THE FENCE PERIMETER. STOP ALL GROUND-LEVEL OPERATIONS AND MAINTAOpen
Sep 12, 2026ECBUnknown: WHILE CONDUCTING A WEEKEND COMPLIANCE INSPECTION AT A NEW FIVE-STORY STRUCTURE. I FOUND NO QUALIFIED WATCH PERSON ON SITE, AS REQUIRED BY CODE BC3303.3, FOR A BUILDING FOOTPRINT OF 7,653 SQ. FT., WITH NO ACTIVEOpen
Sep 12, 2026ECBConstruction: DURING MY INSPECTION OF A CLOSED SITE, 5-STORY NB. NO WORKERS ON SITE. I OBSERVED THAT THE SITE WAS UNENCLOSED AND OPEN TO THE PUBLIC. EXPOSURES: 1 GATE WAS UNCHAINED, AND EXPOSURE 4 DOOR WAS UNLOCKED. THIS CONOpen
Sep 12, 2026ECBConstruction: WHILE CONDUCTING A WEEKEND COMPLIANCE INSPECTION OF A CLOSED 5-STORY NB. I OBSERVED AT THE INTERIOR PERIMETER AND AT THE EXTERIOR FENCE AT GROUND LEVEL. SCATTERED DEBRIS /MIXED TRASH AND DISORGANIZED MATERIALS.Open
Aug 20, 2026ECBConstruction: THE R-VALUE OF THE INSTALLED FOUNDATION WALLS OUTBOARD INSULATION IS R-VALUE 10 WITH THICKNESS 2" CONTRARY WITH THE APPROVED DOB EN DRAWING AND ARCHITECTURAL DRAWING THAT INDICATE R-VALUE 11 WITH THICKNESS 2.25Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 7:16 AM ET. BBL 2047430005.

Look up another building