Manhattan · Block 880 · Lot 89 · 10010

337 Park Avenue South

4 floors · 23,405 sq ft · built 1900 · class O5 · owner of record: Watton Studio Corp

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1138dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1138 days
Next cycle year 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jun 4, 2008Construction Hazardous
FAILURE TO MAINTAIN EXTENSION WALL NOTED: A PEICE OF LIMESTONE APPROX 2'X2' 5" THICK FELL FROM TOP OF THE 1 ST PL ONTO ENTRY STAIRS AND PUBLIC WALK REMEDY:MAKE SAFE, MAINTAIN BUILDING,SUBMIT ENERGINEENS REPORT
#34611466X
Jul 31, 2008
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#00729
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 4:18 AM ET. BBL 1008800089.

Look up another building