Bronx · Block 4733 · Lot 6 · 10469

3362 Boston Road

7 floors · 20,260 sq ft · built 2019 · class H3 · owner of record: Boston Hotel Llc

19open violations
$27,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
433dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 433 days
Next cycle year 2027
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page

Feb 21, 2029
in 851 days
Filing window not open yet

Open violations

ECB / OATH (12) · $27,500 owed
IssuedViolationHearingBalance
Aug 7, 2020Construction CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.AT TIME OF INSPECTION OF AN ACTIVE 7 STORY NEW BUILDING.I OBSERVED ON 3RD FLOOR,THEFLOOR BUMPS OUT PASS THE PROPERTY LINE HANGING OVER PARAPET WALL AT EX
#35469312P
Mar 12, 2021
IN VIOLATION
$5,000
Aug 7, 2020Construction CLASS - 1
FAILURE TO PROVIDE DOCUMENTS TO BE KEPT ONSITE AT TIME OF INSPECITON OF AN ACTIVE 7 STORY NEW BUILDING.I OBSERVED CONCRETE SAFETY STRAPS ON EVER FLOOR.NO DAILY LOGS WERE PROVIDE TO STATE IF THE STRAPS ARE SAFE
#35469313R
Mar 12, 2021
IN VIOLATION
$2,500
May 26, 2020Construction CLASS - 1
SEC. 3309.10 PROTECTION ROOFS. AT TIME OF INSPECTION ON A ACTIVE JOBSITE FORMING 5TH FLOOR,IT WAS OBSERVED THAT ROOF PROTECTION FOR ADJACENT PROPERTIES AT EXP#2&4 WERE MISSING OSHA PLANKS AT SAME PARTS & ROOF
#35492405J
Jul 31, 2020
IN VIOLATION
$2,500
May 26, 2020Site Safety CLASS - 1
DOCUMENTS TO BE KEPT ON SITE. AT TIME OF INSPECTION ON A ACTIVE JOBSITE FORMING 5TH FL,APPROX 50 FEET IN HEIGHT,IT WAS OBSERVED SIDEWALK SHED INSTALLED AT EXP#1 & #3 ABOVE ADJACENT PROPERTY. SIDEWALK SHED AT
#35492409R
Jul 31, 2020
IN VIOLATION
$1,250
May 26, 2020Construction CLASS - 1
WORK DOES NOT CONFORM TO APPROVED PLANS-SSP. AT TIME OF INSPECTION ON A ACTIVE JOBSITE FORMING 5TH FL. IT WAS OBSERVED THAT ROOF PROTECTION DOES NOT MATCH SITE SAFETY PLAN,(CAZ)AT 1ST FL NOT INSTALLED,OVERHEAD
#35492407N
Jul 31, 2020
IN VIOLATION
$2,500
May 26, 2020Construction CLASS - 1
FAILURE TO PROVIDE & MAINTAIN HOUSEKEEPING. AT TIME OF INSPECTION ON AACTIVE JOBSITE FORMING 5TH FL,IT WAS OBSERVED INADEQUATE HOUSEKEEPING FROM SAFE EVIDENCE TO CONSTRUCTION AREA AT EXP#1,FROM 1 FLOOR TO CELLA
#35492406L
Jul 31, 2020
IN VIOLATION
$2,500
May 26, 2020Construction CLASS - 1
SEC. 3301.1.2 FAILURE TO COMPLY W/FDNY(GENERAL). AT TIME OF INSPECTIONON A ACTIVE JOBSITE FORMING 5TH FL,IT WAS OBSERVED THAT FIRE EXTINGUISHERS WERE MISSING ABOVE 1 FLOOR & CELLAR,NO STAIR SIGNS WERE INADEQUAT
#35492408P
Jul 31, 2020
IN VIOLATION
$2,500
May 26, 2020Construction CLASS - 1
SEC. 2113.1.6.1 RESPONSABILY OF OWNER OF TALLER BLDG-CHIMNEY. AT TIME OF INSPECTION ON A ACTIVE JOBSITE FORMING 5TH FL,IT WAS OBSERVED THAT CHIMNEY SLAB OF NEW BLDG AT EXP#4 ON 3 FLOOR DECK. FAILURE TO EXTEND
#35492410Y
Jul 31, 2020
IN VIOLATION
$2,500
Mar 5, 2020Construction CLASS - 2
BC3307.2.1 FAILURE TO COMPLY WITH D.O.T REGULATION AS PER 34RCNY.2-05 AND ADMIN CODE PROVISIONS 19-107,19-108 OR 19-121 AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE WITH POUR CONCRATE ON PROGRES
#35471286N
Oct 9, 2020
IN VIOLATION
$625
Mar 5, 2020Construction CLASS - 1
NO HANDRAILS.AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE WITH POUR CONCRATE ON PROGRESS,DURING INSPECTION NOTED AT CELLAR LEVEL THE STAIR DON'T HAVE HANDRAILS,THIS CREATING HAZARDOUS CONDITIONS
#35471285L
Oct 9, 2020
IN VIOLATION
$2,500
Mar 5, 2020Construction CLASS - 1
UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT.AT MY TIME OF INSPECTION I OBSERVED ACTIVE CONSTRUCTION SITE GROUND FLOOR CONCRETE POUR OPERATION AND SAW NON CODE COMPLIANT FUEL STORAGE CONTAINER(PLASTIC)
#35471284J
Oct 9, 2020
IN VIOLATION
$2,500
Mar 5, 2020Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMEDMENTS"SITE SAFETY PLANS"AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE WITH POUR CONCRATE ON PROGRESS,DURING INSPECTION
#35471283H
Oct 9, 2020
IN VIOLATION
$625
DOB (0)

None open.

DOB NOW Safety (18)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Aug 29, 2025Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Sep 11, 2024Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Jan 19, 2007Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jun 9, 1994Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
HPD (1) · C 0 · B 0 · A 1
IssuedClassViolationCorrect by
May 11, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 14, 2026

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 12:23 AM ET. BBL 2047330006.