| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5716). Agency page | Dec 31, 2026 in 67 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 251,884 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-08 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 20, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORFIRE-PROOF DOOR DO NOT SELF-CLOSE PROPERLY AT, 2RD FLR-SMOKE DOOR NEARRM #348. CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT, RM #305, 335. #35722404Z | May 8, 2026 POP/IN-VIO | $0 |
| Mar 20, 2026 | Construction CLASS - 2 RE-ISSUE #35717100N. UNLAWFUL DISPLAY OF ARTWORK IN CORRIDORS GREATER THAN 20% PER FDNY 2008 CODE; FC 803.3.2. NOTED: AT FIRST FLOOR CORRIDOR UNLAWFUL DISPLAY IN TWO SIDE WALL DISPLAY, REMOVE OR REDUCE. REMEDY: #35722406M | May 8, 2026 POP/IN-VIO | $0 |
| Mar 20, 2026 | Construction CLASS - 2 RE-ISSUE #35717170Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ROOF LEVEL MEMBRANE IN STATE OF DISREPAIR, ALLOWING WATERPENETRATION. REMEDY: REPAIR AND/OR REPLACE. #35722403R | May 8, 2026 POP/IN-VIO | $0 |
| Mar 20, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE PROOF DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR-STAIRCASE "C", GIRLS BATHROOM, BOYS BATHROOM. 2ND FLR-STAIRCASE "B", GYM DOOR, AUDITORIUM ENT #35722405K | May 8, 2026 POP/IN-VIO | $0 |
| Mar 3, 2026 | Construction CLASS - 1 RETAINING WALL ON WEST 230 STREET HAS BEEN OBSERVED WITH DETERIORATED CONDITIONS SUCH AS DISPLACED MASONRY UNITS, LOOSE AND ERODED MORTAR JOINTS AND STONES THAT ARE LONGER PROPERLY INTERLOCKED. THE LOSS OF BACK #39178965H | Aug 7, 2026 POP/IN-VIO | $0 |
| Apr 15, 2025 | Construction CLASS - 2 REISSUE#35678790K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ROOF LEVEL MEMBRANE IN STATE OF DISREPAIR.ALLOWING WATER PENETRATIONREM:COMPLY WITH CODE. #35717170Z | Aug 15, 2025 POP/IN-VIO | $0 |
| Apr 4, 2025 | Construction CLASS - 2 28-301.1 REISSUE#35678793X DATE OF ISSUE:04.19.2024 UNLAWFUL DISPLAY OF ARTWORK IN CORRIDORS GREATER THAN 20% PER FDNY 2008 CODE;FC 803.3.2.AT FIRST FLOOR CORRIDOR UNLAWFUL DISPLAY IN TWO SIDE WALL DISPLAY REMO #35717100N | Jul 18, 2025 POP/IN-VIO | $0 |
| Apr 19, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDAT ROOF LEVEL, ROOFING MEMBRANE IS IN STATE OF DISREPAIR DUE TO THE ROOFING MEMBRANE BECOMING POROUS AND ALLOWING WATER TO PENETRATE INTO TH #35678790K | Jun 21, 2024 POP/IN-VIO | $0 |
| Apr 19, 2024 | Construction CLASS - 2 28-301.1. UNLAWFUL PLACEMENT OF FURNISHINGS, DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCTED ACCESS TO, EGRESS FROM OR VISIBILITY THEREOF PER FDNY 2008 CODE; FC 1027.4. NOTED: OBSERVED AT 1 FLR.-CLASS ROO #35678793X | Jun 21, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 3, 2026 | CONSTRUCTION RETAINING WALL ALONG IRWIN AVENUE. HAS BEEN OBSERVED WITH DETERIORATED CONDITIONS SUCH AS DISPLACED MASONRY UNITS, LOOSE AND ERODED MORTAR JOINTS, AND STONES THAT ARE NO LONGER PROPERLY INTERLOCKED. THE RETAINING WALL PRESENTS HAZARDOUS CONDITIONS TO THE PUBLIC AND AT RISK OF FURTHER DISREPAIR SHOUL #26-00660 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07908 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07819 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07907 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07818 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Apr 23, 2025 | Retaining Walls | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)