10 floors · 280,569 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 280,569 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $246,100 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 830 days | Filing window not open yet |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 742). Agency page | Dec 31, 2032 in 2239 days | Next due 2032 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 21, 2026 | Construction CLASS - 2 REISSUE#35719856M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.6TH FLOOR CAFE HAS NO FIRE SUPPRESSION SYSTEM.REM:COMPLY WITH CODE. #35732931J | Jul 15, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 REISSUE:35719857Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS.7TH FLOOR,GYM,6TH FLOOR CAFE.REM:COMPLY WITH CODE. #35732148H | Jul 15, 2026 POP/IN-VIO | $0 |
| Oct 2, 2025 | Unknown CLASS - 2 OBSERVED CONSTRUCTION SIDEWALK SHED AT EXPOSURE ONE, PERMIT WAS EXPIRED. M00536622-I1-SHEXPIRE 01/26/2025.FAILED TO RENEW PERMIT IN CONTRARY WITH 28-105.2 CLASSIFICATION OF WORK PERMITS SECTION 8 TEMPORARY CONS #39545576X | Dec 11, 2025 ADMIT/IN-VIO | $0 |
| Jun 30, 2025 | Construction CLASS - 2 REISSUE ECB #35684882Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT 6TH FL CAFETERIA WITH NO FIRE SUPPRESSION SYSTEM PROVIDED/INSTALLED. REMEDY: REPAIR AND/OR REPLACE. #35719856M | Sep 4, 2025 POP/IN-VIO | $0 |
| Jun 30, 2025 | Construction CLASS - 2 REISSUE ECB #35684881R. FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: AT CELLAR POOL/FOUNDATION WATER PENETRATION/DAMAGE TO THE WALLS/FLOOR. REMEDY: MAINTAIN EXTERIOR BUILDING WALL. #35719858X | Sep 4, 2025 POP/IN-VIO | $0 |
| Sep 27, 2024 | Construction CLASS - 2 REISSUE#35674882J FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:OBSERVED IN THE CAFETERIA THE 10 BURNER GAS STOVE HAS NO FIRE SUPPRESSION SYSTEM.REM:PROVIDE FIRE SUPPRESSION SYSTEM FOR STOVE. #35684882Z | Dec 5, 2024 POP/IN-VIO | $0 |
| Sep 27, 2024 | Construction CLASS - 2 REISSUE#35674878R FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTED:OBSERVED AT SUB-CELLAR,THE POOL HAS TO BE CLOSED DUE TO WATER PENETRATION OF WALLS.REM:MAINTAIN EXTERIOR BUILDING WALLS. #35684881R | Dec 5, 2024 POP/IN-VIO | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #801505. REMEDY: FILE ACCEPTABLE REPORT. #37025998Y | Jan 23, 2024 POP/IN-VIO | $0 |
| Apr 20, 2023 | Construction CLASS - 2 REISSUE #35643303Y.FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.NOTED:POOL AT SUB CELLAR CLOSED DUE TO POROUS FOUNDATION WALL.REMEDY:REPAIR/REPLACE.MAKE NECESSARY REPAIRS. #35674878R | Jul 6, 2023 POP/IN-VIO | $0 |
| Apr 20, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT CAFETERIA 10 BURNER GAS STOVE DO NOT HAVE FIRE SUPPRESSION SYSTEM.REMEDY:PROVIDE FIRE SUPPRESSION SYSTEM TO GAS STOVE. #35674882J | Jul 6, 2023 POP/IN-VIO | $0 |
| Mar 27, 2023 | Construction CLASS - 1 TIME OF INSPECTION OBSERVED STORAGE ZONES AT EXPOSURE 1,3, WITH STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITH NO SOLID BARRICADE ALONG THE SIDEWALK ON WEST 18TH AND WEST 19TH STREETS. SOLID BARRICADE TO #39514640J | Nov 30, 2023 DEFAULT | $0 |
| May 5, 2022 | Construction CLASS - 2 REISSUE #35558018Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AT TIME OF INSPECTION OBSERVED AT SUB BASEMENT POOL WATER PENETRATING AT POOL FOUNDATION WALL LEAKING TO FLOOR & PUDDLING DAMAGE TO WALL #35643300Z | Sep 1, 2022 POP/IN-VIO | $0 |
| May 5, 2022 | Construction CLASS - 2 REISSUE #35094155M FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.AT TIME OF INSPECTION OBSERVED AT CELLAR LEVEL WATER PENETRATION AT POOL SLAB AND EXTERIOR FOUNDATION WALL HAS BECOME POROUS ALLOWING WAT #35643303Y | Sep 1, 2022 POP/IN-VIO | $0 |
| Apr 22, 2021 | Construction CLASS - 2 REISSUE#35495260L/DATE OF ISSUE#4/28/2020/FAILURE TO MAINTAIN BUILDINGIN CODE COMPLIANT MANNER.NOTE:IN SUB BASEMENT POOL WATER PENETRATING AT POOL FOUNDATION WALL LEAKING TO FLOOR AND PUDDLING.DAMAGE TO WALL/CE #35558018Z | Jul 15, 2021 POP/IN-VIO | $0 |
| Apr 22, 2021 | Construction CLASS - 2 REISSUE#35260115Z/DATE OF ISSUE:5/9/17.POOL WATER PENETRATION AT SUB CELLAR THE POOL FOUNDATION WALLS HAVE POOL WATER STREAMING OUT IN SEVERAL AREAS.PROVIDE STRUCTURAL STABILITY REPORT AND MAKES REPAIR.REMEDY:R #35558020H | Jul 15, 2021 POP/IN-VIO | $0 |
| Apr 28, 2020 | Construction CLASS - 2 REISSUE 35414777R.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE:IN SUB BASEMENT POOL WATER PENETRATING AT POOL FOUNDATION WALL LEAKING TO FLOOR AND PUDDLING.REMEDY:REPAIR AND/OR REPLACE. #35495260L | Aug 13, 2020 POP/IN-VIO | $0 |
| Apr 15, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT SUB CELLAR POOL WATER PENETRATION AT POOL FOUNDATION WALLS LEAKING/DAMAGED.REMEDY: REPAIR AND/OR REPLACE #35414777R | Jun 27, 2019 POP/IN-VIO | $0 |
| Feb 14, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER: POOL WATER PENETRATION AT SUB CELLAR- THE POOLS FOUNDATION WALLS ARE LEAKING WATER.ORIGINAL SUMMONS WAS ISSUED 07/19/11 ECB 34923272K. RMDY: REPAIR AND/OR REPL #35317031X | May 3, 2018 POP/IN-VIO | $0 |
| May 9, 2017 | Construction CLASS - 2 REISSUE #35234884Y FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED: POOL WATER PENETRATION,AT SUB CELLAR, THE POOL FOUNDATION WALLS HAVE POOL WA #35260115Z | Jun 8, 2017 POP/IN-VIO | $0 |
| Mar 17, 2017 | Construction CLASS - 2 REISSUE#35119817K FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AT SUB CELLAR LEVEL POOL SLAB & EXTERIOR FOUNDATION WALL HAS BECOME POROUS ALLOWING WATER TO SEEP IN. REMEDY: MAINTAIN EXTERIOR BLDG WAL #35234885X | Apr 27, 2017 POP/IN-VIO | $0 |
| Mar 17, 2017 | Construction CLASS - 1 REISSUE#35119818M FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT SUB CELLAR THE SWIMMING POOL FOUNDATION WALLS HAVE WATER PENETRATIONS AT SEVERAL LOCATIONS. REMEDY: REPAIR &/OR REPLACE. #35234884Y | Apr 27, 2017 POP/IN-VIO | $0 |
| Jan 28, 2015 | Construction CLASS - 2 REISSUE #35094155M WATER PENETRATION. AT POOL SLAB CELLAR AND THE EXTERIOR FOUNDATION WALL HAS BECOME POROUS ALLOWING WATER TO ENTER (DRY DAY) WEST WALLS WITH STANDING WATER. RMDY: WATERPROOF CELLAR SLAB AND EX #35119817K | Mar 19, 2015 POP/IN-VIO | $0 |
| Jan 28, 2015 | Construction CLASS - 1 REISSUE #35094162K POOL WATER PENETRATION. AT SUB CELLAR THE POOL FOUNDATION WALLS HAVE POOL WATER STREAMING OU TIN SEVERAL AREAS. RMDY: PROVIDE PE/PA STRUCTURAL STABILITY REPORT AND MAKE REPAIRS. #35119818M | Mar 19, 2015 POP/IN-VIO | $0 |
| Apr 11, 2014 | Construction CLASS - 1 POOL WATER PENETRATION. AT SUB CELLAR, THE POOL FOUNDATION WALLS HAVE POOL WATER STREAMING OUT IN SEVERAL AREAS. -IMMEDIATELY- REMEDY: PROVIDE PE/RA STRUCTURAL STABILITY REPORT & MAKE REPAIRS. #35094162K | Jun 19, 2014 POP/IN-VIO | $0 |
| Apr 11, 2014 | Construction CLASS - 2 RE-ISSUE # 34923272K. WATER PENETRATION. AT POOL SLAB CELLAR & THE EXTERIOR FOUNDATION WALL HAS BECOME POROUS ALLOWING WATER TO ENTER (DRY DAY) WEST WALLS WITH STANDING WATER. REMEDY: WATERPROOF CELLAR SLAB & #35094155M | Jun 19, 2014 POP/IN-VIO | $0 |
| Jul 19, 2011 | Construction CLASS - 2 WATER PENETRATION.@ SUB CELLAR POOL FOUNDATION AREA(POOL EMPTY),THE CONCRETE SLAB HAS BECOME POROUS ALLOWING GROUND WATER TO PENETRATE W/STANDING WATER PRESENT.REM:WATERPROOF FOUNDATION SLAB. #34923272K | Sep 15, 2011 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 31, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO MISSING SOME METAL RAILING PANELS AT THE MAIN ROOF FACING EXPOSURE #1 SOUTH ELEVATION AND EXPOSURE #2, WEST ELEVATION. REMEDY: IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASURES ALONG THE UNPROTECTED AND START REPAIRING THE MISSING METAL RAILING UNDER SUPERVISION OF NYS P.E #FA0401EM | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00110 | DOB VIOLATION - ACTIVE |
| Feb 16, 2021 | ELEVATOR #9028/696064 | DOB VIOLATION - ACTIVE |
| Jun 29, 2018 | FACADE SAFETY PROGRAM #HAZ8039 | DOB VIOLATION - ACTIVE |
| Mar 31, 2008 | EMERGENCY POWER #NRF00250 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #00499 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Jun 29, 2018 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Mar 31, 2008 | Emergency Power FTF-EL-ENRF | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)