4 floors · 8 apartments · 5,427 sq ft · built 1931 · class C1 · owner of record: Hedygus Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 13, 2009 | Signs CLASS - 1 OAC ON DISPLAY CONTRARY TO PERMIT SG 302365814. SIGN APPROX 45'X 10'= 450 SQ FT PERMIT IS FOR 148 SQ FT SIGN. (JULIA) REMEDY: REMOVE SIGN. #34816210L | Apr 9, 2010 WRITTEN OFF | $0 |
| Aug 13, 2009 | Signs CLASS - 1 OAC SIGN EXCEEDS MAX SURFACE AREA OF 6 X STREET FRONTAGE IN M1-1 ZONE.FRONTAGE IS 24.67 X 6 = 148.04 SQ FT. SIGN APPROX 45'X 10'= 450 SQ FT (JULIE) REMEDY: REMOVE SIGN. #34816211N | Jun 30, 2010 WRITTEN OFF | $0 |
| Aug 13, 2009 | Signs CLASS - 1 OAC ADVERTISING CO SIGN ON DISPLAY IS CONTRARY TO PERMIT SG 302365811 FOR 148 SQ FT SIGN. SIGN APPROX 45'X 10'= 450 SQ FT (JULIA) REMEDY: REMOVE SIGN. #34816324J | Jun 30, 2010 WRITTEN OFF | $0 |
| Aug 13, 2009 | Signs CLASS - 1 OAC ADVERTISING CO LEASING OR OTHERWISE MAKING ILLEGAL ADVERTISING SIGN SPACE AVAILABLE TO OTHERS. (JULIA) REMEDY: REMOVE SIGN. #34816208M | Jun 30, 2010 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 19, 2009 | CONSTRUCTION BOROUGH COMMISSIONER 15 DAY LETTER OF INTENT TO REVOKE APPL.3302365811 ON 10-9-09 REMEDY; STOP ALL WORK-MAKE SITE SAFE CONTACT DOB #0102WG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 15, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CORNICE AT BUILDING FRONT , 4th STORY | Jan 19, 2026 |
| Dec 15, 2025 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS MISSING | Mar 20, 2026 |
| Dec 15, 2025 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL, 1st STORY | Mar 20, 2026 |
| Dec 15, 2025 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Mar 20, 2026 |
| Dec 15, 2025 | B | § 27-2005 ADM CODE PROVIDE NORTH HANDRAIL AT BUILDING FRONT YARD | Jan 19, 2026 |
| Jun 4, 2020 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE HEAVY DUTY LOCKSET AT BUILDING ENTRANCE DOOR , 1st STORY | Jun 10, 2020 |
| Apr 15, 2020 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI=-GLASS PANEL INSTALLED AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | May 20, 2020 |
| Apr 15, 2020 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE HEAVY DUTY LOCK AND LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Apr 23, 2020 |
| Mar 5, 2020 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT METERIAL AT CEILING AT PUBLIC HALL, 4th STORY | Apr 9, 2020 |
| Mar 5, 2020 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY | Jun 8, 2020 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 1:01 PM ET. BBL 3025240007.