Brooklyn · Block 2524 · Lot 7 · 11222

334 Mcguinness Boulevard

4 floors · 8 apartments · 5,427 sq ft · built 1931 · class C1 · owner of record: Hedygus Realty Llc

16open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
67dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 311 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4)
IssuedViolationHearingBalance
Aug 13, 2009Signs CLASS - 1
OAC ON DISPLAY CONTRARY TO PERMIT SG 302365814. SIGN APPROX 45'X 10'= 450 SQ FT PERMIT IS FOR 148 SQ FT SIGN. (JULIA) REMEDY: REMOVE SIGN.
#34816210L
Apr 9, 2010
WRITTEN OFF
$0
Aug 13, 2009Signs CLASS - 1
OAC SIGN EXCEEDS MAX SURFACE AREA OF 6 X STREET FRONTAGE IN M1-1 ZONE.FRONTAGE IS 24.67 X 6 = 148.04 SQ FT. SIGN APPROX 45'X 10'= 450 SQ FT (JULIE) REMEDY: REMOVE SIGN.
#34816211N
Jun 30, 2010
WRITTEN OFF
$0
Aug 13, 2009Signs CLASS - 1
OAC ADVERTISING CO SIGN ON DISPLAY IS CONTRARY TO PERMIT SG 302365811 FOR 148 SQ FT SIGN. SIGN APPROX 45'X 10'= 450 SQ FT (JULIA) REMEDY: REMOVE SIGN.
#34816324J
Jun 30, 2010
WRITTEN OFF
$0
Aug 13, 2009Signs CLASS - 1
OAC ADVERTISING CO LEASING OR OTHERWISE MAKING ILLEGAL ADVERTISING SIGN SPACE AVAILABLE TO OTHERS. (JULIA) REMEDY: REMOVE SIGN.
#34816208M
Jun 30, 2010
WRITTEN OFF
$0
DOB (1)
IssuedViolationStatus
Oct 19, 2009CONSTRUCTION
BOROUGH COMMISSIONER 15 DAY LETTER OF INTENT TO REVOKE APPL.3302365811 ON 10-9-09 REMEDY; STOP ALL WORK-MAKE SITE SAFE CONTACT DOB
#0102WG
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
HPD (10) · C 2 · B 4 · A 4
IssuedClassViolationCorrect by
Dec 15, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CORNICE AT BUILDING FRONT , 4th STORYJan 19, 2026
Dec 15, 2025A§27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS MISSINGMar 20, 2026
Dec 15, 2025A§27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL, 1st STORYMar 20, 2026
Dec 15, 2025A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.Mar 20, 2026
Dec 15, 2025B§ 27-2005 ADM CODE PROVIDE NORTH HANDRAIL AT BUILDING FRONT YARDJan 19, 2026
Jun 4, 2020C§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE HEAVY DUTY LOCKSET AT BUILDING ENTRANCE DOOR , 1st STORYJun 10, 2020
Apr 15, 2020B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI=-GLASS PANEL INSTALLED AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORYMay 20, 2020
Apr 15, 2020C§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE HEAVY DUTY LOCK AND LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORYApr 23, 2020
Mar 5, 2020B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT METERIAL AT CEILING AT PUBLIC HALL, 4th STORYApr 9, 2020
Mar 5, 2020A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORYJun 8, 2020

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 1:01 PM ET. BBL 3025240007.

Look up another building