19 floors · 120 apartments · 125,685 sq ft · built 1972 · class D1 · owner of record: Bronx Phase Iii Housing Company, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 125,685 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $150,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 827 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1140 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3143). Agency page | Dec 31, 2033 in 2601 days | Next due 2033 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2024 | Construction CLASS - 1 UNLAWFUL ACTS FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.NOTES:DOB#050824FA20501AE DATED 05/08/2024 INCONJUNCTION WITH ECB#35681862H DATED 05/06/2024 REQUIRE OWNER TO IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASUR #35683644Z | Nov 8, 2024 IN VIOLATION | $0 |
| May 6, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED (1) AT EXP. #2(NORTH ELEV.) CRACKED FACADE MASONRY BRICKS BETWEEN 8TH AND 12H FLOOR AT LEFT SIDE. (2)AT EXPOSURE #3(EAST ELEV.) STE #35681862H | Aug 23, 2024 IN VIOLATION | $0 |
| Apr 6, 2023 | Elevators CLASS - 1 RESPONDING TO A 311 ELEVATOR COMPLAINT,UPON INSPECTION OF DEVICE A CEASE USE VIOLATION WAS ISSUED, DLM IN THE CONTROLLER DEFECTIVE NOT WORKING, REMEDY; REPAIR THEN CONTACT NYCDOB FOR RESTORE TO SERVICE RE-INSPE #39083213N | Nov 1, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 26, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00078 | DOB VIOLATION - ACTIVE |
| Jul 10, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00068 | DOB VIOLATION - ACTIVE |
| May 8, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO FACADE VERTICAL CRACK @ EXP#3(E) & CRACKED FACADE MASONRY BRICKS AT EXP#1(S),EXP#4 WEST ELEV.#@ VARIOUS LOCATIONS REMEDY:IMMEDIATELY TAKE & PROVIDE SAFETY MEASURES TO SECURE AND PROTECT PUBLIC & INSTALL PUBL PROTECTION @ ALL EXPOSURES.MAKE IMMEDIAT REPAIRS UNDER SUPERVISI #FA20501AE | DOB VIOLATION - ACTIVE |
| Feb 21, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911887 | DOB VIOLATION - ACTIVE |
| Jan 9, 2022 | CONSTRUCTION DUE TO FIRE #CER01DM | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101662 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 26, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 10, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 21, 2024 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 3, 2026 | C | Apt 19U · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 19U, 19th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 29, 2026 |
| May 28, 2026 | C | Apt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 6th APARTMENT FROM NORTH AT EAST | Jun 23, 2026 |
| May 28, 2026 | C | Apt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 6th APARTMENT FROM NORTH AT EAST | Jun 23, 2026 |
| Jun 20, 2025 | B | Apt 18P · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 1ST ELECTRICAL OUTLET FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 18P, 18th STORY, 4th APARTMENT FROM NORTH AT EAST | Jul 25, 2025 |
| Aug 20, 2024 | C | Apt 16W · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 16W, 16th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 15, 2024 |
| Feb 7, 2022 | B | Apt 12P · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 12 SQ FT IN THE BATHROOM LOCATED AT APT 12P, 12th STORY, 4th APARTMENT FROM NORTH AT EAST | Mar 14, 2022 |
| Aug 28, 2017 | C | Apt 12F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 1st CLOSET FROM EAST AT SOUTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT | Sep 25, 2017 |
| Aug 28, 2017 | C | Apt 12F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 12F, 12th STORY, 2nd APARTMENT FROM SOUTH AT WE | Sep 25, 2017 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 3, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 19U, 19th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 12:36 AM ET. BBL 2031430036.