3 floors · 2 apartments · 3,285 sq ft · built 1920 · class S2 · owner of record: Hyun Bae Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 5, 2024 | C | Apt 3RDFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 3RDFLO, 3rd STO | Sep 12, 2024 |
| Aug 5, 2024 | A | Apt 3RDFLO · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 8, 2024 |
| Aug 5, 2024 | B | Apt 3RDFLO · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT FIRE ESCAPE WINDOW LOWER SASH IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 9, 2024 |
| Aug 5, 2024 | B | Apt 3RDFLO · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT 1ST WINDOW LOWER SASH FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 9, 2024 |
| Aug 5, 2024 | C | Apt 3RDFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT | Sep 12, 2024 |
| Aug 5, 2024 | C | Apt 3RDFLO · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3RD | Sep 12, 2024 |
| Aug 5, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 9, 2024 |
| Aug 5, 2024 | C | Apt 3RDFLO · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Sep 12, 2024 |
| Aug 5, 2024 | A | Apt 3RDFLO · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 8, 2024 |
| Aug 5, 2024 | A | Apt 3RDFLO · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 8, 2024 |
| Dec 18, 2023 | B | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 16 SQ FT AT CEILING AND 4 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Nov 28, 2023 | C | Apt 3FL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 24, 2023 |
| Nov 28, 2023 | C | Apt 3FL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 SQ FT AT CELING IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 24, 2023 |
| Apr 12, 2016 | B | § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING SAFETY COVERS/CAP AT ELECTRICAL OUTLETS AT EAST WALL, AT PUBLIC HALL, 2nd STORY | May 17, 2016 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 9:00 AM ET. BBL 3041300069.