Bronx · Block 5787 · Lot 154 · 10463

3300 Netherland Avenue

6 floors · 66 apartments · 75,784 sq ft · built 1941 · class D7 · owner of record: Netherland Property Assets Llc

28open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
50dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 50 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 75,784 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5787). Agency page

Dec 31, 2027
in 415 days
Next due 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Oct 2, 2025Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTED:OBSERVED AT EXP.3(E.ELEV)CRACKED AND SPALLING MASONRY AT WINDOW LENTILSLOCATED AT 6TH FLOOR LEVEL.THIS CONDITION EXISTED ON ECB VIO#35689979H
#35717706H
Dec 19, 2025
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Dec 28, 2004ELEVATOR

#94442117306
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (20) · C 6 · B 12 · A 2
IssuedClassViolationCorrect by
Oct 18, 2024BApt 6A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE FOYER LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''Nov 22, 2024
Oct 18, 2024CApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''Oct 24, 2024
Oct 18, 2024BApt 6A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULKING AROUND ALL WINDOW FRAMES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''Nov 22, 2024
Oct 18, 2024BApt 6A · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''Nov 22, 2024
Oct 18, 2024BApt 6A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING INSIDE 2ND CLOSET AT WEST IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''Nov 22, 2024
Oct 18, 2024BApt 6A · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HOT AND COLD FAUCET AND SPOUT TO WASH BASIN IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''Nov 22, 2024
Jul 26, 2024BApt 4E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st BEDROOM FROM EAST AT SOUTH LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTAug 30, 2024
Jul 26, 2024CApt 4E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTAug 21, 2024
Jul 26, 2024CApt 4E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTAug 21, 2024
Jul 1, 2024CApt 4E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTJul 27, 2024
Jul 1, 2024CApt 4E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTJul 27, 2024
Feb 22, 2024BApt 5K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WINDOW FRAME IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5K, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North''Mar 28, 2024
Feb 22, 2024BApt 5K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 5K, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North''Mar 28, 2024
Feb 22, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ABOVE 2ND WINDOW AT BUILDING REAR , 4th STORY, SECTION ''North''Mar 28, 2024
Jan 25, 2024AApt 6F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT NORTH, THE KITCHEN LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''Apr 29, 2024
Oct 31, 2023AApt 6F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH, THE 1st ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 4th APARTMENT FROM SOUTH AT WESTFeb 3, 2024
Oct 31, 2023BApt 6F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 4th APARTMENT FROM SOUTH AT WESTDec 5, 2023
Oct 31, 2023BApt 6F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 4th APARTMENT FROM SOUTH AT WESTDec 5, 2023
Oct 2, 2023BApt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 6, 2023
Aug 23, 2023CApt 1E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''North''Sep 18, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 4:02 PM ET. BBL 2057870154.

Look up another building