8 floors · 24,444 sq ft · built 1920 · class HR · owner of record: 330 West 36th St Htlcp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $613,920 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-10-06) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 8, 2023 | Construction CLASS - 3 FAILURE TO POST EXTERIOR WALL CONDITION CERTIFICATE AS REQUIRED UNDER 1RCNY103-04.AT TIME OF INSPECTION CERTIFICATE WAS NOT POSTED.REMEDY:POST EXTERIOR WALL CONDITION CERTIFICATE IN LOBBY. #35670568N | May 18, 2023 IN VIOLATION | $0 |
| Jun 29, 2017 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCCUPANCY OR BUILDING DEPT RECORDS.NOTED:AS PER C OF O #34518 WHICH INDICATES COMMERCIAL OFFICES AT PENTHOUSE(PH)LEVEL HOWEVER AT TIME OF INSPECTION OBS #35249439H | Jan 18, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00151 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #00923 | DOB VIOLATION - ACTIVE |
| Mar 19, 2018 | FACADE SAFETY PROGRAM #HAZ87426 | DOB VIOLATION - ACTIVE |
| Jun 9, 2009 | ELEVATOR #302275/9444 | DOB VIOLATION - ACTIVE |
| Jun 13, 1989 | CONSTRUCTION #MTF1BD | DOB VIOLATION - ACTIVE |
| Jun 13, 1989 | CONSTRUCTION #MTF5BD | DOB VIOLATION - ACTIVE |
| Jun 13, 1989 | CONSTRUCTION #MTF2BD | DOB VIOLATION - ACTIVE |
| Jun 13, 1989 | CONSTRUCTION #MTF3BD | DOB VIOLATION - ACTIVE |
| Jun 13, 1989 | CONSTRUCTION #MTF4BD | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Mar 19, 2018 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 11, 2026 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC CEIILNG TILIES AT COMMUNITY BATHROOM, 2nd STORY, SECTION ''CENTER '' | Sep 14, 2026 |
| Jun 11, 2026 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC CEILING TILES AT PUBLIC HALL, 2nd STORY, SECTION ''B SECTION '' | Sep 14, 2026 |
| Jun 10, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING TO REAR YARD | Jun 24, 2026 |
| Jun 18, 2025 | C | Apt 304 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ROOM LOCATED AT B-ROOM 304, 3rd STORY, 3rd B-ROOM FROM SOUTH AT WEST , SECTION ''WEST'' | Jul 14, 2025 |
| Jun 18, 2025 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT 1st COMMUNITY BATHROOM FROM NORTH, 7th STORY | Sep 21, 2025 |
| Jun 18, 2025 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT COMMUNITY BATHROOM, 5th STORY | Sep 21, 2025 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 3rd STORY, SECTION ''CENTER'' | Jul 18, 2017 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 4th STORY, SECTION ''CENTER'' | Jul 18, 2017 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 4th STORY, SECTION ''SOUTH '' | Jul 18, 2017 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 5th STORY, SECTION ''CENTER'' | Jul 18, 2017 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 6th STORY, SECTION ''SOUTH '' | Jul 18, 2017 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 6th STORY, SECTION ''CENTER'' | Jul 18, 2017 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT PENTHOUSE / ROOF LEVEL | Jul 18, 2017 |
| Apr 14, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 5th STORY, SECTION ''SOUTH'' | Jul 18, 2017 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 1:15 PM ET. BBL 1007590059.