Manhattan · Block 759 · Lot 59 · 10018

330 West 36 Street

8 floors · 24,444 sq ft · built 1920 · class HR · owner of record: 330 West 36th St Htlcp

31open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-27 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $613,920 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2026-10-06)

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 8, 2023Construction CLASS - 3
FAILURE TO POST EXTERIOR WALL CONDITION CERTIFICATE AS REQUIRED UNDER 1RCNY103-04.AT TIME OF INSPECTION CERTIFICATE WAS NOT POSTED.REMEDY:POST EXTERIOR WALL CONDITION CERTIFICATE IN LOBBY.
#35670568N
May 18, 2023
IN VIOLATION
$0
Jun 29, 2017Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCCUPANCY OR BUILDING DEPT RECORDS.NOTED:AS PER C OF O #34518 WHICH INDICATES COMMERCIAL OFFICES AT PENTHOUSE(PH)LEVEL HOWEVER AT TIME OF INSPECTION OBS
#35249439H
Jan 18, 2018
IN VIOLATION
$0
DOB (9)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00151
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#00923
DOB VIOLATION - ACTIVE
Mar 19, 2018FACADE SAFETY PROGRAM

#HAZ87426
DOB VIOLATION - ACTIVE
Jun 9, 2009ELEVATOR

#302275/9444
DOB VIOLATION - ACTIVE
Jun 13, 1989CONSTRUCTION

#MTF1BD
DOB VIOLATION - ACTIVE
Jun 13, 1989CONSTRUCTION

#MTF5BD
DOB VIOLATION - ACTIVE
Jun 13, 1989CONSTRUCTION

#MTF2BD
DOB VIOLATION - ACTIVE
Jun 13, 1989CONSTRUCTION

#MTF3BD
DOB VIOLATION - ACTIVE
Jun 13, 1989CONSTRUCTION

#MTF4BD
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
Mar 19, 2018Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
HPD (14) · C 2 · B 0 · A 12
IssuedClassViolationCorrect by
Jun 11, 2026A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC CEIILNG TILIES AT COMMUNITY BATHROOM, 2nd STORY, SECTION ''CENTER ''Sep 14, 2026
Jun 11, 2026A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC CEILING TILES AT PUBLIC HALL, 2nd STORY, SECTION ''B SECTION ''Sep 14, 2026
Jun 10, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING TO REAR YARDJun 24, 2026
Jun 18, 2025CApt 304 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ROOM LOCATED AT B-ROOM 304, 3rd STORY, 3rd B-ROOM FROM SOUTH AT WEST , SECTION ''WEST''Jul 14, 2025
Jun 18, 2025A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT 1st COMMUNITY BATHROOM FROM NORTH, 7th STORYSep 21, 2025
Jun 18, 2025A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT COMMUNITY BATHROOM, 5th STORYSep 21, 2025
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 3rd STORY, SECTION ''CENTER''Jul 18, 2017
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 4th STORY, SECTION ''CENTER''Jul 18, 2017
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 4th STORY, SECTION ''SOUTH ''Jul 18, 2017
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 5th STORY, SECTION ''CENTER''Jul 18, 2017
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 6th STORY, SECTION ''SOUTH ''Jul 18, 2017
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 6th STORY, SECTION ''CENTER''Jul 18, 2017
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT PENTHOUSE / ROOF LEVELJul 18, 2017
Apr 14, 2017A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED CEILING AT COMMUNITY BATHROOM, 5th STORY, SECTION ''SOUTH''Jul 18, 2017

Check the agency records