Manhattan · Block 930 · Lot 41 · 10010

330 East 25 Street

5 floors · 9,595 sq ft · built 1910 · class H8 · owner of record: New York University

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
42dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 42 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Oct 27, 2021Boilers CLASS - 2
RAYPAK 399000 BTU'S DOMESTIC HOT WATER BOILER FTM MISSING DIVERTER SPILL SWITCH
#39050057J
Apr 28, 2022
IN VIOLATION
$0
Aug 28, 2015Boilers CLASS - 2
B254,15,24B,34A,50,50A,50B. 50-OUTSIDE SCREEN ON FRESH AIR DUCT TO BOILER ROOM 1/2 CLOGGED; 50A-FRESH AIR DUCT TO BOILER ROOM,MOTORIZED LOUVER NOT INTERLOCKED WITH OPERATION OF BOILER,AND OPEN LOUVER PROV
#32075677R
Jan 14, 2016
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#02718
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
HPD (2) · C 0 · B 0 · A 2
IssuedClassViolationCorrect by
Apr 29, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 2, 2026
Oct 12, 2017A§ 27-2049 ADM CODE POST AND MAINTAIN A STREET NUMBER ON THE FRONT OF THE DWELLING PLAINLY VISIBLE FROM THE SIDEWALK. AT FRONT AREAWAY, 1st STORYJan 15, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 1:01 AM ET. BBL 1009300041.

Look up another building