4 floors · 189,197 sq ft · built 1951 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 66 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 189,197 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1252). Agency page | Dec 31, 2032 in 2258 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 2, 2026 | Construction CLASS - 2 REISSUE #35691799N DATE OF ISSUE: 04/22/25. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, MISSING STONE PAVERS AT EXIT #12 PATIO AND PAVERS CREATED ON APPROX 4" TRIPPING HAZARD. #35727333N | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 REISSUE: 35691795X DATE OF ISSUE: 04/22/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, OBSERVED ANDNOTED APPROX 22 CLASSROOM DOORS ARE RACKED, CRACKED OR SPLIT NOT SELF- #35727337K | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 REISSUE #35717375M DATE OF ISSUE: 04/22/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT BASEMENT LEVEL OUTSIDE OF ELECTRIC METER ROOM OBSERVED 15 PIE #35727332L | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 REISSUE #35691798L DATE OF ISSUE: 04/22/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT ROOF MISSING AND PEELING RIGIDFOAM INSULTATION AND VEGETATION GROWING AT VARIOUS AREAS OF THE ROOF A #35727334P | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 REISSUE #35677167Y DATE OF ISSUE: 05/02/2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT FLAG POLE ON 79 STREET REAR PARKING LOT DISCONNECTED PAVE. RE #35732426Z | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 REISSUE #35691796H DATE OF ISSUE: 04/22/25. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FL. EXIT-6 SEVERAL WINDOW PANELS CRACKED. REMEDY: REPAIR OR #35727336Z | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 REISSUE #35691797J DATE OF ISSUE: 04/22/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT EXP-1 AND 3 STEP CRACKS IN MASONRY FACADE AND CRACKED/SPALLIN #35727335R | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 REISSUE #35677167Y DATE OF ISSUE: 05/02/2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION BULKHEAD C, E, G CRACKS IN WALLS. REMEDY: REPAIR OR REPLACE ALL DEFECTIVE AREAS AT #35732425R | May 13, 2026 POP/IN-VIO | $0 |
| Apr 2, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FL GYM IN MAIN ENT. #35727339Y | May 13, 2026 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT BASEMENT LEVEL OUTSIDE OF ELECTRIC METER ROOM OBSERVED 17 PIECES OF GAS POWERED EQUIPMENT(SNOW BLOWERS,LAWN MOWERS & LEAF BLOWERS)BEING STORED.GAS INSIDE #35717375M | Jul 1, 2025 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 REISSUE#35677167Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT 1ST FL EXIT#6 SEVERAL WINDOW GLASS PANELS ARE CRACKED OR SHATTERED ABOVE THE EXIT DOOR.REM:REPAIR AND/OR REPLACE. #35691796H | Jul 1, 2025 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 REISSUE#35677168X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.APPROX.25 CLASSROOM DOORS ARE RACHED,CRACKED OR SPLIT & NOT SELF CLOSING PROPERLY.RM#301,316,317A,324,342,355,204A,207,209,222,234,238,244 #35691795X | Jul 1, 2025 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT EXP 1 &3 STEP CRACKS IN MASONRY FACADE & CRACKED/SPALLING DECORATIVE CEMENT STORE AT PARAPET WALL LEVEL.CONDITIONS IN SCATTERED LOCATIONS.REM:REPAI #35691797J | Jul 1, 2025 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED MISSING STORE POWERS AT EXIT#12 PATIO & ADJACENT EXTERIOR STEP LANDING.BROKEN/SUNKER PAVERS CREATED ON APPROX 4"TRIPPING HAZARD.REM:REPAIR AND/OR REPL #35691799N | Jul 1, 2025 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT ROOF MISSING & PEELING RIGID FOAM INSULATION AND VEGETATION GROWING AT VARIOUS AREAS OF THE ROOF.REM:REPAIR AND/OR REPLACE. #35691798L | Jul 1, 2025 POP/IN-VIO | $0 |
| May 2, 2024 | Construction CLASS - 2 REISSUE #35643371X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT 1 FLOOR EXIT 6 SEVERAL WINDOW PANELS CRACKED. BULKHEAD C,E, G CRACKS IN WALLS, FLAG POLE ON 79 ST REAR PARKING LOT DISCONNECTED PAVE #35677167Y | Aug 20, 2024 POP/IN-VIO | $0 |
| May 2, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT 3 FLOOR ROOM316, 317 A AND B, 323A, 324, 342, 350, 355, 356, 2FL.-204A, 207, CORRIDOR BY 207, 209, 222, 234, 238, 244, 256, 258, 1FL.-103, 126, 150, 156 #35677168X | Aug 20, 2024 POP/IN-VIO | $0 |
| Apr 18, 2023 | Construction CLASS - 2 REISSUED#35643371X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 1ST FLOOR EXIT#6 SEVERAL WINDOW PANELS ABOVE EXIT DOOR ARESHATTERED AND CRACKED.REM:REPAIR AND/OR REPLACE. #35672778K | Aug 1, 2023 POP/IN-VIO | $0 |
| May 2, 2022 | Construction CLASS - 2 REISSUE#35555930N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER NOTED:AT EXIT#6 SEVERAL WINDOW PANELS ABOVE EXIT DOOR ARE SHATTERED/CRACKED.REM:REPAIR AND/OR REPLACE. #35643371X | Sep 6, 2022 POP/IN-VIO | $0 |
| Apr 6, 2021 | Construction CLASS - 2 FILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTE: AT EXIT#6,SEVERAL WINDOW PANES ARE SHATTERED &/OR CRCKED IN VARIOUS PLACES & ONE OF THE WINDOW PANES ON AN EXIT DOOR IS COMPLETELY MISSING DANGER OF BROKE #35555930N | Apr 29, 2021 POP/IN-VIO | $0 |
| Sep 23, 2020 | Elevators CLASS - 2 97X10: (97,X,10) RESTORE TO SERVICE SO A FULL INSPECTION CAN BE MADE BY THIS DEPARTMENT #38272539J | Dec 29, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 6, 2008 | ELEVATOR #9444/273496 | DOB VIOLATION - ACTIVE |
| Sep 3, 2004 | ELEVATOR #94444107412 | DOB VIOLATION - ACTIVE |
| Apr 16, 2003 | ELEVATOR #9444/472773 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03693 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03694 | DOB VIOLATION - ACTIVE |
| Jun 29, 1990 | LOCAL LAW 10/81 - ELEVATOR 1 #04381 | DOB VIOLATION - ACTIVE |
| Dec 27, 1988 | ELEVATOR (45)REMOVE WATER FROM PIT (51)FILE A BN FOR ALL NEW EQUIPMENT INSTALL ON SW175 AND HAVE SAME TE TESTED BY THIS DEPARTMENT (52)RESTORE ELEVATOR TO SERVICE SO THAT A COMPLETE INSPECTION CAN BE MADE #1161D/03 | DOB VIOLATION - ACTIVE |
| Dec 27, 1988 | ELEVATOR (51)FILE A BN FOR ALL NEW EQUIPMENT INSTALLED ON SW174 AND HAVE SAME TESTED BY THIS DEPARTMENT #1161D/02 | DOB VIOLATION - ACTIVE |
| Jul 30, 1988 | ELEVATOR #121428 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |