4 floors · 105,830 sq ft · built 1950 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 63 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 105,830 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 610). Agency page | Dec 31, 2030 in 1524 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 5, 2026 | Construction CLASS - 2 REISSUE#35693185L DATE OF ISSUE:03.10.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXISTS,EXIT DISCHARGES ANDPUBLIC CORRIDORS PER BC 1006.1;27-381.AT THE TIME OF INSPECTION OBSERV #35728680M | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 REISSUE#35693184X DATE OF ISSUE:03.10.25 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT WATER PENETRATION AT HATCHES AND SUPPLY ROOM IN CELLAR AREA.REM:REPAIR OR/AND REPLACE. #35728681Y | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 REISSUE#35693187L DATE OF ISSUE:03.10.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT EXPOSURES 2 AND 4.AT SPALLING AND MISSING CONCRETE ABOVE WINDOWS #35728678N | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 REISSUE#35693186J DATE OF ISSUE:03.10.2025 ONE EXIT DOOR EXIT-NO-3 AT FIRST FLOOR KITCHEN AREA EXIT-3 HAS MISSING PUSH BAR EXIT DOOR IS NOT OPEN BY PUSH BAR.EXIT-3 IS EXIT DOOR AND EXIT SIGN IS THERE,IN THAT PL #35728679P | Mar 12, 2026 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 4 FLOOR PARAPET ABOVE WINDOWS AT EXPOSURES 2 AND 4 SPALLING AND MISSING CONCRETE. REMEDY: REPAIR AND/OR REPLACE. #35693187L | May 6, 2025 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED AT 1 FLOOR EXITS 3(KITCHEN), 5, 8 AND 9 DOORS ARE NOT CLOSING PROPERLY. REMEDY: REPAIR/REPLACE DOORS. #35693186J | May 6, 2025 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED AT 3 FLOOR BOX #30, 31, STAIR F, GYM, 2 FL. #27, 29, AND 1FL. #11 #35693185H | May 6, 2025 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 REISSUE #35678686K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT WATER PENETRATION AT HATCHES AND SUPPLY ROOM IN CELLAR. REMEDY: REPAIR AND/OR REPLACE. #35693184X | May 6, 2025 POP/IN-VIO | $0 |
| Feb 23, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. CELLAR LEVEL CONCRETE CRACKING AND DETERIORATION LETTING WATER INTO AREA HATCHES TO LAND SUPPLIES FROM OUTSIDE. REMEDY: REPAIR AND/OR REPLACE. #35678686K | Apr 22, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 4, 2008 | ELEVATOR #9444/247512 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 10:47 AM ET. BBL 4006100001.