Brooklyn · Block 2384 · Lot 33 · 11211

329 Grand Street

3 floors · 2 apartments · 3,120 sq ft · built 1899 · class S2 · owner of record: Cheaklett Holdings Llc

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
51dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-08-09 (Accepted). Agency page

Dec 31, 2026
in 51 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 295 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 782 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#10717
DOB VIOLATION - ACTIVE
Jan 31, 2019CONSTRUCTION
EMG WRK:PORTION OF STONE@EXP1 DETACH ATFACE&FELL TO SIDEWALK INSIDE CONST.FENCE SURROUNDING PART OF 329,331,335 FRONTAGE.FRONT EXP1 WALL STATE OF DISREPAIR W/CRACKS IN STUCCO-1ST FLOOR AND DETERIORATED WIND SILLS EXP1 POSES HAZARD TO PUBLIC IMM EXTEND INSTALLED CONST FENCE AT EXP1 TO CLOSE S/W IN FR
#FEU30102BS
DOB VIOLATION - ACTIVE
Jan 31, 2019CONSTRUCTION
FTM:3S+C PORT OF STONE LINTL FRNT WALL DETACH@FACE&FELL TO S/W INSIDE CONST FENCE EXP1 WALL IN STATE OF DISREPAIR W/CRACKS IN STUCCO DETER WIND SILLS THRUOUT&STONE LINTL COVERED IN STUCCO EXP1 POSES HAZ TO PUB 8FT OF S/W IN FRNT OF BLDG TO BE ENCL BY FENCE OR PROT BY S/W/S RPR EXP1 WALL U/PMT FILE P
#FEU30103BS
DOB VIOLATION - ACTIVE
Jun 6, 2001CONSTRUCTION
HAZARDOUS
#01EM01
DOB VIOLATION - ACTIVE
Jun 6, 2001CONSTRUCTION
HAZARDOUS
#01EM02
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (2) · C 0 · B 2 · A 0
IssuedClassViolationCorrect by
Jan 9, 2018B§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE IRON LADDER LEADING TO THE SCUTTLE OPENING IN ROOF AT PUBLIC HALL, 3rd STORYFeb 13, 2018
Jan 9, 2018B§ 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AND BICYCLE PARTS AT PUBLIC HALL, 3rd STORYFeb 13, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 2:35 PM ET. BBL 3023840033.

Look up another building