Manhattan · Block 1043 · Lot 46 · 10019

328 West 53 Street

6 floors · 41 apartments · 29,422 sq ft · built 1920 · class D5 · owner of record: Hp W53 Housing Development Fund Company, Inc.

7open violations
$5,625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-04-16 (Accepted). Agency page

Dec 31, 2026
in 47 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 29,422 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01

Open violations

ECB / OATH (3) · $5,625 owed
IssuedViolationHearingBalance
Sep 17, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SIX STORY WITH CELLAR AND OCCUPIED MULTIPLE DWELLING. BUILDING IS ADJACENT AND PARTOF A 5-STORY WITH CELLAR INTERCONNECTED. SEMI ATTACHED ON THE FRONT PO
#35733242Z
Dec 3, 2026
PENDING
$2,500
Dec 7, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35432990P ISSUED ON 10/23/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO C/OF/C ON FILE
#35513914H
Jan 20, 2022
IN VIOLATION
$625
Oct 23, 2019Construction CLASS - 1
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTI0NOPERATIONS.NOTED:AT TIME OF INSPECTION OBSERVED THE CEILING IN APARTMENT 3C HAS BEEN COMPRAMISED,IE CRACKS AND A SECTION HAS FALLEN DUE TO C
#35432990P
Jan 20, 2022
IN VIOLATION
$2,500
DOB (5)
IssuedViolationStatus
Sep 17, 2026CONSTRUCTION
CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS W/EXTERIOR WALLS OF THE BLDG. 24 DEFECTIVE AREAS AT EXP1 & 3, DEFECTS AT EXP4, CRACKED & DISLODGED STONEWORK AT VARIOUS LOCATIONS, MISSING MORTAR BTWN STONE WORK. IMMED RETAIN RDP IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE A
#PI10402HZ
DOB VIOLATION - ACTIVE
Sep 17, 2026CONSTRUCTION
EMERGENCY WORK ORDER TO INSTALL S/W SHED PROTECTION. IMMED HAZ COND 24 DEFECTIVE AREAS AT EXP1 & 3, DEFECTIVE AREAS @ EXP4, CRACKED STONE WORK,DISLODGED STONEWORK,MISSING MORTAR BTWN STONWORK. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL FULLL LENGTH OF BLDG, PROVE APPROX 40FT LINEAR FEET OF SHED AT
#PI10401HZ
DOB VIOLATION - ACTIVE
Jun 28, 1993LOCAL LAW 10/81 - ELEVATOR
1
#01055
DOB VIOLATION - ACTIVE
Apr 7, 1992LOCAL LAW 10/81 - ELEVATOR
1
#01070
DOB VIOLATION - ACTIVE
Oct 12, 1989LOCAL LAW 10/81 - ELEVATOR
1
#01710
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 28, 2026AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 28, 2026DOB SafetyAEUHAZ: Open
Sep 17, 2026DOBCONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS W/EXTERIOR WALLS OF THE BLDG. 24 DEFECTIVE AREAS AT EXP1 & 3, DEFECTS AT EXP4, CRACKED & DISLODGED STONEWORK AT VARIOUS LOCATIONS, MISSING MORTAR BTWN STONE WORK. IMMED RETAIN RDP IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE AOpen
Sep 17, 2026DOBCONSTRUCTION: EMERGENCY WORK ORDER TO INSTALL S/W SHED PROTECTION. IMMED HAZ COND 24 DEFECTIVE AREAS AT EXP1 & 3, DEFECTIVE AREAS @ EXP4, CRACKED STONE WORK,DISLODGED STONEWORK,MISSING MORTAR BTWN STONWORK. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL FULLL LENGTH OF BLDG, PROVE APPROX 40FT LINEAR FEET OF SHED AT Open
Sep 17, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SIX STORY WITH CELLAR AND OCCUPIED MULTIPLE DWELLING. BUILDING IS ADJACENT AND PARTOF A 5-STORY WITH CELLAR INTERCONNECTED. SEMI ATTACHED ON THE FRONT POOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 3:58 PM ET. BBL 1010430046.

Look up another building