Bronx · Block 4249 · Lot 1 · 10461

3273 Westchester Avenue

1 floors · 7,900 sq ft · built 1930 · class K1 · owner of record: 3273-85 Westchester Avenue Llc

48open violations
$24,375ECB/OATH penalties owed
0HPD class C (immediately hazardous)
45dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 45 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-12-26 (Accepted). Agency page

Dec 31, 2026
in 45 days
1 of 1 without an accepted 2026 report yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 776 days
Next cycle year 2028

Open violations

ECB / OATH (25) · $24,375 owed
IssuedViolationHearingBalance
Aug 22, 2023Construction CLASS - 2
OBSERVED IN DRY CLEAN NYC STORE IN THE BASEMENT INSTALLED NEW GAS LINE AND 20 COMMERCIAL GAS DRYERS ALL WORK COMPLETED NO PERMIT, OBTAIN ALL PERMITS
#39093144H
Nov 3, 2023
STIPULATION/IN-VIO
$1,250
Aug 22, 2023Plumbing CLASS - 2
OBSERVED IN THE DRY CLEAN NYC STORE IN THE BASEMENT 20 COMMERCIAL GAS DRYERS AND ON THE FIRST FLOOR 8 COMMERCIAL GAS DRYERS NO SPRINKLER SYSTEM IN PLACE, PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED
#39093146L
Aug 23, 2024
IN VIOLATION
$1,250
Aug 22, 2023Construction CLASS - 2
OBSERVED IN DRY CLEAN NYC STORE ON GROUND FLOOR AND BASEMENT USING RESIDENTIAL FLEX HOSES ON COMMERCIAL GAS DRYERS. ALSO USING RIDGED FLUE PIPE ON COMMERCIAL GAS DRYERS WHICH PROHIBITED MATERIAL. ALSO IN BASEME
#39093145J
Nov 3, 2023
STIPULATION/IN-VIO
$625
Mar 29, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35261000N ISSUED ON 5/30/17 AND TO FILE A CERTIFICATE OF COR RECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI
#35396890M
Jan 13, 2026
IN VIOLATION
$1,250
Feb 9, 2019Construction CLASS - 2
FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35261000N ISSUED ON 5/30/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO
#35394491X
Jan 13, 2026
IN VIOLATION
$1,250
Oct 18, 2018Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR JOB#220601828.NOTED(1)AT FIRST FLOOR NO VESTUBALE WAS INSTALLED AS PLAN SHOWS-(2)AT CELLAR LEVEL 2 WALK IN BOX AND A SINK
#35349648M
Jan 13, 2026
IN VIOLATION
$1,250
Jul 23, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35261000N ISSUED ON 05-30-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT
#35341481N
Jan 13, 2026
IN VIOLATION
$1,250
Jul 12, 2018Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/ VIOLATION# 35173343P ISSUED ON 2/01/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR WORK WITHOUT A PER
#35340836Z
Jan 13, 2026
IN VIOLATION
$2,500
Jun 9, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35261000N ISSUED ON 05-30-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
#35337595J
Aug 3, 2018
IN VIOLATION
$1,250
May 30, 2018Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35173343P ISSUED 02/03/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1. WORK WITHOUT A PERMIT. NOTED: ERECTED FULL
#35338067K
Jul 20, 2018
WRITTEN OFF
$0
Apr 16, 2018Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#351733381LISSUED ON 02/01/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.SPRINKLERS.WORK W/O PERMI
#35336647H
Jan 13, 2026
IN VIOLATION
$6,250
Mar 10, 2018Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35173338K ISSUED ON 02/01/17 AND FILE A CERTIFICATE OF CORRECTION OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102.01. WORK WITHOU
#35316998L
Jan 13, 2026
IN VIOLATION
$6,250
Dec 21, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173343P ISSUED ON 02/01/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WOKR W/O A PERMIT. FULL HEIGHT PARTITION ERECTED IN"3279"WESTCH
#35280618Z
Feb 23, 2018
WRITTEN OFF
$0
Sep 30, 2017Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35173338K ISSUED 02/01/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR: WORK WITHOUT A PERMI
#35282680Z
Jul 13, 2018
WRITTEN OFF
$0
Sep 30, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173343P ISSUED ON 02/01/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: WORK W/O A PERMIT FOR PARTITIONS & STORE FRONT CREATED AT
#35278620P
Dec 1, 2017
WRITTEN OFF
$0
Aug 6, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173343P ISSUED ON 02/01/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: WORK W/O A PERMIT FOR PARTITIONS & STORE FRONT CREATED AT
#35277001L
Mar 23, 2018
WRITTEN OFF
$0
Aug 6, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173338K ISSUED ON 02/01/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: WORK W/O A PERMIT FOR 7 STORES ERECTED AT 1ST FLOOR.
#35277000J
Mar 23, 2018
WRITTEN OFF
$0
Jun 10, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173338K ISSUED ON 2-1-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. PARTITIONS ERECTED NO PERMIT ON FILE. REMEDY: COMPLY W/COMM'S ORD
#35234226M
Aug 18, 2017
WRITTEN OFF
$0
Jun 10, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173343P ISSUED ON 2-1-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. NO PERMIT ON FILE PARTITIONS ERECTED. REMEDY: COMPLY W/COMM'S ORD
#35234225K
Aug 4, 2017
WRITTEN OFF
$0
May 30, 2017Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY COFO OR DOB RECORDS.NOTED:COFO#40519-65 INDICATES THE 1ST FLOOR OF PROPERTY TO BE OCCUPIED & USED AS STORES,RESTAURANT AND BANQUET HALL.CONTRARY CONDITIONS NOTED.THE RESTAU
#35261000N
Aug 4, 2017
WRITTEN OFF
$0
Apr 11, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173338K ISSUED ON 2-01-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. PARTITIONS ERECTED NO PERMIT ON FILE. REMEDY: COMPLY W/COMM'S OR
#35232510K
Aug 18, 2017
WRITTEN OFF
$0
Apr 11, 2017Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35173343P ISSUED ON 2-01-17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. ILLEGAL STORES NO PERMIT ON FILE. REMEDY: COMPLY W/COMM'S ORDER
#35232512Y
Aug 4, 2017
WRITTEN OFF
$0
Feb 1, 2017Construction CLASS - 1
WORK W/O A PERMIT. WORK NOTED: ERECTED FULL HEIGHT PARTITIONS BETWEEN 1 STORE"CROSSY CLEANERS"& ADJACENT STORE"BOOST MOBILE"TO CREATE A NEW ILLEGAL STORE"SANAA SMOKE SHOP". INSTALLED NEW STOREFRONT BAY WINDOW
#35173343P
Oct 20, 2017
WRITTEN OFF
$0
Feb 1, 2017Construction CLASS - 1
WORK W/O A PERMITS. WORK NOTED: ERECTED FULL HEIGHT PARTITIONS,SUB DIVIDING THE STORE & THE RESTAURANT & BANQUET HALL TO CREATE A TOTAL OF 7STORES. GENERAL ELECTRICAL WIRING THROUGHOUT THE STORES,W/SWITCHES,REC
#35173338K
Aug 18, 2017
WRITTEN OFF
$0
Feb 1, 2017Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.C OF O #40519-65 INDICATES THE 1ST FL OF THE PROPERTY IS TO BE OCCUPIED & USED AS STORES,RESTAURANT & BANQUET HALL. CONTRARY CONDITIONS NOTE
#35173339M
Aug 4, 2017
WRITTEN OFF
$0
DOB (14)
IssuedViolationStatus
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#01063
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00263
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
#00968
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#03016
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00585
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
#01795
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
#04159
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
#00384
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
#00410
DOB VIOLATION - ACTIVE
May 3, 2017FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00218
DOB VIOLATION - ACTIVE
May 3, 2017FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00216
DOB VIOLATION - ACTIVE
Dec 15, 2009CONSTRUCTION

#1001AS
DOB VIOLATION - ACTIVE
Aug 9, 1999CONSTRUCTION

#STF02MAD
DOB VIOLATION - ACTIVE
Aug 3, 1999ELECTRIC SIGNS

#1001BL
DOB VIOLATION - ACTIVE
DOB NOW Safety (12)
IssuedViolationStatus
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Oct 25, 2024Boiler FTC-BE-EXT-HP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for HP Device
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
May 3, 2017AEUHAZ FTC-AEU-HAZ
Active
May 3, 2017AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 16, 2026, 12:54 PM ET. BBL 2042490001.