Bronx · Block 2368 · Lot 35 · 10456

3267 3rd Avenue

9 floors · 73 apartments · 77,273 sq ft · built 2024 · class D7 · owner of record: 3273 3rd Llc

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
69dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 77,273 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 313 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 486 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 800 days
Next cycle year 2028
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2368). Agency page

Dec 31, 2028
in 800 days
Next due 2028

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Mar 27, 2012Construction CLASS - 2
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A C OF C W/THE DEPT OF BUILDINGS FOR NOTICE OF VIOLATION #34903614N ISSUED ON 1/13/12 PURSUANT TO 28-204.4 & 1RCNY 102-01. REMEDY: FILE A C OF C.
#34970206Y
May 18, 2012
WRITTEN OFF
$0
DOB (4)
IssuedViolationStatus
Jun 14, 2018CONSTRUCTION
FAILURE TO COMPLY W/COMMISSIONER ORDER #334005 ISSUED ON 4/4/18 TO HAVE AN ENG'R IMMED EVAL BLDG&PROV RPRS UND PERM,OBTAIN PERMIT BY 5/4/18&SIGNOFF PERM NO LATER THAN 7/6/18.PERM HAS NOT BEEN OBTAINED AS OF 6/14/18&NO FILING HAS BEEN DONE FOR PERMIT.REMEDY:COMPLY WITH COMMISSIONER ORDER #334005 IMME
#FEU20301BS
DOB VIOLATION - ACTIVE
Apr 4, 2018CONSTRUCTION
FTM PREM IS 3 STRY+CELL SEMI ATTACH WOOD FRAMED W/MASONRY EXT WALLS MIX USE BLDG ON INT LOT.FRONT BRICK WALL SEPARATING FROM BRICK SIDE WALLS&OPEN JOINTS AT FW.EXP 2 LEFT SW HAS OPEN JOINTS&DETERIORATED MASONRY.REMEDY:OWN RET NYS PE ENG'R IMMED EVAL BLDG&PROV RPRS UND PERM OBTAIN PERM BY 5/4/18.PERM
#FEU20305BS
DOB VIOLATION - ACTIVE
Mar 28, 2018CONSTRUCTION
DUE TO FIRE
#CER03EP
DOB VIOLATION - ACTIVE
May 5, 1993CONSTRUCTION

#03RT02(3269
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (1) · C 0 · B 0 · A 1
IssuedClassViolationCorrect by
May 11, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 14, 2026

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 3:19 PM ET. BBL 2023680035.

Look up another building