| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 77,273 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 313 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 486 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2368). Agency page | Dec 31, 2028 in 800 days | Next due 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 27, 2012 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A C OF C W/THE DEPT OF BUILDINGS FOR NOTICE OF VIOLATION #34903614N ISSUED ON 1/13/12 PURSUANT TO 28-204.4 & 1RCNY 102-01. REMEDY: FILE A C OF C. #34970206Y | May 18, 2012 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 14, 2018 | CONSTRUCTION FAILURE TO COMPLY W/COMMISSIONER ORDER #334005 ISSUED ON 4/4/18 TO HAVE AN ENG'R IMMED EVAL BLDG&PROV RPRS UND PERM,OBTAIN PERMIT BY 5/4/18&SIGNOFF PERM NO LATER THAN 7/6/18.PERM HAS NOT BEEN OBTAINED AS OF 6/14/18&NO FILING HAS BEEN DONE FOR PERMIT.REMEDY:COMPLY WITH COMMISSIONER ORDER #334005 IMME #FEU20301BS | DOB VIOLATION - ACTIVE |
| Apr 4, 2018 | CONSTRUCTION FTM PREM IS 3 STRY+CELL SEMI ATTACH WOOD FRAMED W/MASONRY EXT WALLS MIX USE BLDG ON INT LOT.FRONT BRICK WALL SEPARATING FROM BRICK SIDE WALLS&OPEN JOINTS AT FW.EXP 2 LEFT SW HAS OPEN JOINTS&DETERIORATED MASONRY.REMEDY:OWN RET NYS PE ENG'R IMMED EVAL BLDG&PROV RPRS UND PERM OBTAIN PERM BY 5/4/18.PERM #FEU20305BS | DOB VIOLATION - ACTIVE |
| Mar 28, 2018 | CONSTRUCTION DUE TO FIRE #CER03EP | DOB VIOLATION - ACTIVE |
| May 5, 1993 | CONSTRUCTION #03RT02(3269 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 11, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 14, 2026 |